TVA PROJECT: (JI 8 N UNIT:
Q.
Record Thickness Measurements As Indicated, Including Weld Width, Edge-To-Edge At 0° Position o*
90° 180° 270° DJ Nhl NIA NIA rl/A rn ti/A HIA
~I~,.,,,.
[!]
N/lf I"/~ H/11 ti/A
[!]
3.~4 3J7 3.30 3.~
m l.~ 3'..l 3.~ 3.o8 WALL THICKNESS PROFILE SHEET REPORT NO:
WELD NO: --.3!:W
............ P_-...!....:/S::;.._ ____ _
SYSTEM: _ __._P..... Zc...L..:B.___ _______ _
- Weld Edge 5
Sla11 Side Flow...
CROWN HEIGHT: __
_..F_.l..... u_.5..._h.__ ______ _
DIAMETER: -------'--,,..---------
H~. 7 II J.l 11 CROWN WIDTH: __
WELD LENGTH: ___
~..._,~....,_,__ _______
Nll2:z..le.
.She II
~
G ANll:
REVIEWED BY:~~C1
~
LEVEL: =ti(.
DATE: \\o. d "°)
- l£,..) i...:D::A~TE:::: ::::;::::/-=$=-/=(=========--I OF
'(Lu DATE:
10- r'i - tcJ PAGE lV A 19668 (NP-5-89) 1-108-999-44
WBN ~ I WP-IS'
WELD NUMBER Item 1 ltem2 Item 3 ltem4 Item 5 ltem6 Item 7 Item 8 Item 9 ltem*10 Item 11 Watts Bar Unit 2 TVA Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 WP-15 ( 45 Deg)
Required examination Volume in sq. in.
(width x height)
Number of scan directions Total Scan volume in sq. in.
Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan limitation due to Nozzle configuration Measured Fields 4.4 2.75 I
11.5 3
46.7 6.6 46.7 6.6
~. \\:>I >.80 sq. in.
4ldirections sq. in.
46.7linches Initials JA Date 10/25/2010 cu. In.
cu. In.
cu. In.
cu. In.
WELD NUMBER Item 1 ltem2 Item 3 ltem4 Item 5 Item 6 Item 7 Item 8 Item 9 Item 10 Item 11 Watts Bar Unit 2 TVA Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 WP-15 ( 60 Deg)
Required examination Volume in sq. in.
(width x height)
Number of scan directions Total Scan volume in sq. in.
Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan limitation due to Nozzle configuration 4.4 11.5 4.49 6.6 6.6 Measured Fields I
46.7 K-Pld-8° sq. in.
41directions sq. in.
- 46. 71 inches Initials JA Date 10/25/2010 CU. in.
cu. In.
cu. In.
cu. In.
cu. In.
~e q__tt{ (to
~
10-3t~tl
WELD NUMBER Item 1 Item 2 Item 3 ltem4 Item 5 ltem6 Item 7 Item 8 Item 9 Item 10 Item 11 Watts Bar Unit 2 TVA Procedure N-P-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 WP-15 (ODeg)
Required examination Volume in sq. in.
(width x height)
Number of scan directions
.Total Scan volume in sq. in.
Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan limitation due to Nozzle configuration 4.4 8.0025 8.0025 8.0025 8.0025 Measured Fields 2.75 46.7 46.7 46.7
~ f>08D sq. in.
41directions sq. in.
- 46. 71 inches Initials JA Date 10/25/2010 cu. in.
cu. In.
cu. In.
cu. In.
cu. In.
cu. In.
%