TVA WALL THICKNESS REPORT NO:
PROJECT:
IAJB)J UNIT:
~
Rec::ord Thickness Measurements As Indicated, Including Weld Width, Edge*To*Edge At o*
Position O
- 9 o* 180" 2 7 o*
PROFILE i'
-Side CROWN HEIGHT: -----lf.~"L!.;tJ.~~'-lt/:.L-----
CRQWN WIDTH:-----..::..* 7.::....;::;'tf _____
PIPE
()"
LEVEL: ___
--=~------
DATE:
'IV A 19668 (NP*S-89)
LEVEL:~
SHEET WELD NO:
5.Z.F-D 194-IS' SYSTEM:
srs
- Weld Edge 5
r
-Side DIAMETER: _____ __,$.=*-=0'--------
WELD LENGTH:-~-----";J.::;..;...:'l_*.;:;.0 ______
FLOW IE£
-ri>e.
- 7eo111e4y.
Ci"Ui-.
PAGE
TVA PROJECT: __
W~B~N-- SYSTEM:
5 I. 5 0.:
Office of Nuclear Power UNIT:
- 2..
WELD NO:
S..Z.~-/J194-IS*
FL.t>W BY:~
LEVEL: :JL DATE:
tJ~*:Z.5-10 PAGE fa OF?
WELD NUMBER Item 1 Item 2 Item 3 ltem4 Item 5 Item 6 Item 7 Item 8 Item 9 Item 10 Item 11 Watts Bar Unit 2 TVA Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 SIF-0194-15 Required examination Volume in sq. in.
(width x height)
Number of scan directions Total Scan volume in sq. in.
Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 No Scan #4,due to Tee cofiguration 0.25 0.3125 0
0.3125 0.3125 Measured Fields 1.25 0
27
\\<_.{YtlA'D sq. in.
41directions sq. in.
27linches
~
--~p
,,l!4375
- 75.
Initials JA Date 06/28/2010 cu. in.
cu. In.
cu. In.
cu. In.
cu. In.
%