Report No. R-P1162, Wall Thickness Profile Sheet, (Sketch)
ML16293A497
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 10/05/2016
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16293A318 List: ... further results
References
CNL-16-135 R-P1162
Download: ML16293A497 (3)


Text

TVA WALL THICKNESS REPORT NO:

PROFILE PROJEC:T: _ _.'-'J::;...;;;.~_;;,_---------

UNIT: __ """'--~~-------~--

Record Thickness Measurementtll /1.111 Indicated. lncludlng Weld Width, Edge*To*Edge At o*

Position o*

90* 180° 270° Ci]

.sr,

  • l,;(.3

.~"',fl.lo

[!)

,/./'I'.Stf1

,Sl.o,<:n rn

.5'ii.s--sq.~!.~,,72 C!I

, SS4' * <,t.'I *'"'3.G. or, rn

.~n,g2.J

,S'I~

.g20

!"11!

~

~Sid~

CROWN HEIGHT: _

_,f~)14:rwi+11o.l _________

~

CRQWN WIDTH: _ __,,._,7'------------

DATE:

LEVEL:

l li,.?

'IV A 196611 CNP*S-89)

SHEET

~--0\\\\~'d WllH.D NO: srF., 011 ~-1~A SYSTEM:

cS:r

  • Weld Edge 2.5" 2.5" 5

FL&

Sidle flow~

4,,

DIAMETER:----'--------------

1 u, -.r

WELD lElllGTH: _ _.... _ _.-,.,_.:::.."7"------------

ANH:

DATE*

PAGE

TVA PROJECT:

~~N SYSTEM:.ST-5 Office of Nuclear Power UNIT:

2 WELD NO: &rF-t?rn?-13~

LEVEL:..:::::a=

DATE: 1..-n-10 PAGEL OF;[

WELD NUMBER Item 1 Item 2 Item 3 Item 4 Item 5 ltem6 Item 7 Item 8 Item 9 Item 10 Item 11 Watts Bar Unit 2 TVA Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 2.0 dated 10/21/09 SIF-D118-13A Required examination Volume in sq. in.

(width x height)

Number of scan directions Total Scan volume in sq. in.

Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan 4 not examined Due to Pipe to Flange configuration Exam was single sided 2mhz RL 60 was used Per Procedure UT-64 Rev11 Measured Fields 1.3 0.2 0.26 14.25 14.25 0.26 0.26

~

  • ~l\\(t,O-sq. in.

41directions sq. in.

14.251inches Initials BAL Date 06/25/2010 cu. in.