Report No. R-P1116, Wall Thickness Profile Sheet, (Sketch)
ML16293A491
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 10/05/2016
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16293A318 List: ... further results
References
CNL-16-135 R-P1116
Download: ML16293A491 (3)


Text

WALL THICKNESS REPORT NO:

TVA PROFILE SHEET

~. \\:'.>\\ \\ \\,,,.,

PROJECT:

WBN WELD NO:

5.If-B~Tocro-ob UNIT:

~

SYSTEM:

szs Record Thickness Measurements As Weld

  • Weld Edge Indicated, Including Weld Width, Centerline Edge-To-Edge At o*

I -

2.5" 2.5"'

~1 m

rn m

141 151 Position o*

90* 1 so* 270° 1

""!)

J DJ

.35.3>5

.~'-/. 3 'I p,P£ Side F/.ANffSide rn

.~s.35.3 o/. 3'/

[!]

.'"f 2. '-/ ()

.110

.'I 0 13]

. 'f 3.L/2 * "{I.L/3 IT]

Flowllt:

CROWN HEIGHT:

. oS"'

DIAMETER:

2. 0 '*

CROWN WIDTH:

, 7 5...

WELD LENGTH:

7. 75 ~

FLcw L":-=-

FLAtJG-E PIPE t

.~

/V 0 ::#" 5

/Z-E" A t> 11.t c.-s D "

TO Ft.A/./t/C r_

fJJJ __ - ~

  • r"ASt>AJ REVIEWED e~Pe.~.a¢ EXAMINER*

PoLiSE~y ANll:

~

v ::u-LEVEL:

7-16'-/t:'

llw DATE* U,. Q)~ {0 DATE:

ob_Lo'J./10 LEVEL:

DATE:

PAGE IL OF tA 1V A 19668 (NP-5-89) 1-108-999-44

TVA REPORT NO.:

PROJECT: __

W~BN~-- SYSTEM:

5.IS Office of Nuclear Power UNIT:

WELD NO: 51 F-B-ToCfo-ob

/:LOW

~

PIPE BY:

rllsoJJ PoL 1S£rJSJ:

LEVEL:

-:ir DATE: 06/o:i/ 1 o PAGE S.-

OF

~

WELD NUMBER Item 1 Item 2 Item 3 ltem4 Item 5 ltem6 Item 7 Item 8 Item 9 Item 10 Item 11 Watts Bar Unit 2 TVA Procedure N-P-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 SIF-B-T090-06 Required examination Volume in sq. in.

(width x height)

Number of scan directions Total Scan volume in sq. in.

Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 No Scan #4, limitation due to flange 1.25 0.1375 0.1375 0.1375 0

Measured Fields 7.75 7.75 7.75

\\:<. '~\\\\\\~

sq. in.

41directions sq. in.

7. 751 inches Initials JAP Date 06/02/2010 cu. in.

cu. In.

cu. In.

cu. In.

%