PLA-7537, Response to Request for Additional Information License Amendment Request Extending Completion Times in Support of 480V Ess Load Center Transformer Replacements

From kanterella
(Redirected from ML16284A013)
Jump to navigation Jump to search

Response to Request for Additional Information License Amendment Request Extending Completion Times in Support of 480V Ess Load Center Transformer Replacements
ML16284A013
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 10/10/2016
From: Franssen R
Susquehanna, Talen Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-7537
Download: ML16284A013 (56)


Text

Robert J. Franssen Plant General Manager Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3170 Robert. Franssen @Ta len Energy.com TALEN ~

ENERGY OCT 1 0 2616 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST EXTENDING COMPLETION TIMES IN SUPPORT OF 480V ESS LOAD CENTER TRANSFORMER REPLACEMENTS PLA-7537 Docket No. 50-388

References:

1.

Letter PLA-7384, Susquehanna Steam Electric Station Proposed Amendment to Unit 2 Operating License No. NPF-22; Tempormy Change to Allow Replacement of the Unit 1 480V ESS Load Center Transformers in Unit 2 Technical Specifications 3.8. 7 and 3. 7.1, dated January 28, 2016, (Accession ML16029A031).

2.

NRC letter, Supplemental Information Needed for Acceptance of Requested Licensing Action Re: Proposed Request for TemporaJJl Change of Unit 2 Technical Specifications 3.7.1 and 3.8.7, dated March 24, 2016, (Accession ML16060A230).

3.

Letter PLA-7451, Susquehanna Steam Electric Station Supplemental Information for License Amendment Request Extending Completion Times in Support of 480V ESS Load Center Transformer Replacements, dated April 6, 2016, (Accession ML16097A4896).

4.

NRC letter, Request for Additional Information Regarding Proposed Request for Temporary} Change of Unit 2 Technical Specifications 3. 7.1 and 3. 8. 7, dated September 9, 2016, (AccessionML16251A065).

Susquehanna Nuclear, LLC is providing information in response to questions pertaining to a License Amendment Request (LAR) affecting Susquehanna Steam Electric Station (SSES) Unit 2 Technical Specifications (TS). The proposal (Reference 1) affects TS 3.8.7 "Electrical Power Systems -Distribution Systems-Operating" and TS 3. 7.1 "Plant Systems-RHRSW System and UHS." The proposed changes increase the Completion Time for Condition C of TS 3. 8. 7 and Condition A and B of TS 3. 7.1 from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days in order to accommodate 480V ESS Load Center Transformer replacements on Unit 1.

Document Control Desk PLA-7537 Reference 4 requests additional infmmation from Susquehanna Nuclear, LLC to support the NRC in reviewing the content provided in references 1 and 3, with an opportunity to provide the requested infmmation by October 11, 2016. Attachment 1 provides responses to these requests.

Susquehanna Nuclear, LLC has reviewed the infmmation supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRC in Reference 1. The additional infmmation provided by this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. Furthermore, the additional infmmation does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment need to be prepared in connection with the proposed amendment.

There are no new regulatory commitments associated with this response.

If you have any questions or require additional information, please contact Mr. Jason Jennings, Manager of Nuclear Regulatory Affairs, at (570) 542-3155.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on:

/?? d t' /;' 6


~,~~--------------

Sincerely, R. J. Franssen :

Response to Request for Additional Information :

Affected Loads :

Requested Copies of TROs Copy:

NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP

Electronic Copy:

D. M. Ambrose T. N. Creasy M. Sivararnan D. G. Kostelnik N. E. Fairchild (NSRB)

R. J. Franssen J. R. Jennings T. J. Walters NRA File DCS GENPL5 GENPL4 Document Control Desk PLA-7537 to PLA-7537 Susquehanna Nuclear, LLC Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.7.1 and 3.8.7 Response to Request for Additional Information SSES Response to RAI RAI1:

When extending the CT of a TS in the proposed system lineup (i.e., 1X210 or 1X220 de-energized), the licensee will make one train of RHRSW and Emergency Service Water (ESW) inoperable by disabling power to the RHRSW array valves and the bypass valve. If during the revised CT of 7 days, the station experiences a dual unit loss of offsite power (LOOP) with a single failure of the redundant RHRSW train, both trains of RHRSW and ESW would be inoperable. The scenario presented in the enclosure to the LAR dated January 26, 2016 (pages 6 and 7 of 30) does not address this concern.

Based on this concern, provide results of an analysis stating how the station will mitigate a dual unit LOOP when in the revised CT of 7 days. The results of the analysis should do one of the following:

a. Provide reasonable assurance, with specified compensatory actions in place at the start of the planned maintenance, that the probability of failure of the remaining train of RHRSW has been significantly reduced to justify the 7-day CT; Or
b. Assume the only remaining train of RHRSW has failed with the LOOP, and with defined compensatory actions in place at the start of the planned maintenance, demonstrate that RHRSW can be restored such that safe shutdown and cooldown to Mode 4 can be achieved for both units, including cooling of the spent fuel pool. In your analysis,
i.

assume the LOOP duration is the full 7 days; ii.

identify the minimum time Unit 1 must be shut down in order for your analysis to be valid, since Unit 1 will already be in Mode 4; iii.

describe the operator actions and the associated timeline needed to restore an RHRSW header to service in order to provide decay heat removal for both units.

Response

This response will address question 1 b. In discussing the response to this question, it is important to understand the configuration and availability of the RHRSW and ESW pumps in the division that the work is occurring. The work will cause a loss of power to the bypass and spray array valves causing them to fail in their current position (bypass valve open and spray array valve closed). As part of the work, the spray pond bypass valve will be confirmed in the open position. This establishes a flow path for both RHRSW and ESW to the spray pond. The RHRSW and ESW pumps on the division being worked will have power available and be able to start in the event of a design basis accident (e.g., LOOP) since they are powered from the Emergency Diesel Generators (EDGs). Since the RHRSW pumps in the affected division will have AC power and a flow path to the spray pond, they will remain functional to remove decay heat as required.

Page 1 of 8 SSES Response to RAl A potential issue that may impact RHRSW and ESW pump functionality is the loss of all ESSW Pumphouse ventilation fans in the affected division. Analyses have been performed to demonstrate that if the doors or dampers are configured in a specific manner, the natural circulation of air will keep the affected division temperature within pump operability limits. The analyses conservatively assumes design basis outside air temperatures. The required configuration will be established at the start of the work.

With the above actions in place at the start of the assumed event (LOOP), both RHRSW pumps in the affected division will be available for decay heat removal. The ESW loop in the affected division will be available to provide cooling water flow to the diesel generators and other ESW users. The operating unit RHR system will be aligned for suppression pool cooling or shutdown cooling when the RHR shutdown cooling pressure permissive is reached. The plant operator will align RHR in fuel pool cooling mode for the shutdown unit. This would cool both the fuel pool and the shutdown core assuming the core and fuel pools are connected though the reactor cavity. Operational experience has demonstrated that the non-safety related fuel pool cooling pumps can cool both the fuel pools and the core during outages. The RHR fuel pool cooling mode has a greater cooling capacity than the fuel pool cooling system so both the core and fuel pools will be cooled by the outage division RHR system.

The only long term concern of this approach is maintaining peak spray pond temperatures within the current analytical bounds. In the scenario analyzed to address this question, it is assumed only the affected division of RHRSW/ESW is available (i.e. the division with an open bypass valve). The spray pond temperature will increase in this valve alignment. The spray pond bypass and spray array valves are located in a valve vault near the spray pond. Plant personnel will be designated to manually position these valves in the event of an accident resulting in the loss of the operable loop of RHRSW/ESW cooling. This will provide cooling for the spray pond and maintain temperatures within design limits. This manual action will conservatively take less than 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to perform. To determine the impact on spray pond temperature, this time will conservatively be doubled. If the initial spray pond temperature is maintained below 82°F, the peak pond temperature will be bounded by the current analysis assuming Unit 1 has been shut down for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

To summarize, the following conditions will need to be met:

1. One unit in Mode 5 for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with the core and fuel pools connected through the reactor cavity
2. Spray pond temperature is maintained below 82°F
3. ESSW Pumphouse doors or dampers aligned to provide adequate cooling
4. Designated personnel to open the spray array valves and close the bypass valve Based on the above discussion, one division of RHRSW and ESW will remain functional throughout a LOOP and temperatures will remain within current analytical bounds assuming the failure of the division unaffected by transformer replacement.

Page 2 of 8 SSES Response to RAI RAI2:

In Table 1 in the enclosure to the LAR dated January 28, 2016 (pages 16 through 27 of 30), the licensee listed Unit 2 and common loads that are powered by Unit 1 Class 1 E 480 V transformers and are affected by de-energization with the associated Limiting Conditions for Operation (LCO) and Technical Requirements for Operation (TRO) implications.

In Enclosure 1 to the licensee's letter dated April 6, 2016, the licensee provided a listing of loads from the motor control centers (MCCs) powered by the Unit 1 Class 1 E 480 V transformers that will be replaced as identified in the LAR.

From a correlation of the loads listed in Table 1 of the LAR dated January 28, 2016, with the loads identified Enclosure 1 of the letter dated April 6, 2016, the NRC staff notes that a small percentage of the loads listed in Enclosure 1 is subsequently identified in Table 1 of the LAR as affecting Unit 2 LCOs and TROs. Many of the affected loads listed in Enclosure 1 have identifiers that do not clearly distinguish between Unit 1, Unit 2, and common loads. Therefore, the NRC staff requests that the licensee:

a. Provide a listing of all Unit 2 or common loads powered from the Unit 1 480 V transformers (1X210, 1X220, 1X230, and 1X240) listed in Enclosure 1 and that are:
1) safety related or Class 1 E and
2) not already identified in Table 1
b. For any loads identified above, determine if any LCOs or TCOs are associated with these loads, and discuss additional actions (if applicable) necessary to justify the LAR.

Response

a. See Enclosure 1.
b. There are no additional LCOs or TROs associated with this equipment. As a result no additional actions are required.

RAI 3

In Table 1 in the enclosure to the LAR dated January 28, 2016, the licensee has identified TRO 3.7.6 associated with the Engineered Safeguard Service Water (ESSW) Pumphouse Ventilation System. When either transformer 1X21 0 or 1X220 is being replaced, four ESSW fans are inoperable. The licensee stated in Table 1 that two ESW pumps and one RHRSW pump would be declared inoperable after 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> in accordance with TRO 3.7.6. The NRC staff does not have TRO 3.7.6 to review, and it is not clear why only one RHRSW pump would be inoperable.

The staff requests that the licensee:

Page 3 of 8 SSES Response to RAI

a. Explain why only one RHRSW pump becomes inoperable after 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> with two RHRSW fans out of service when either 1X210 or 1X220 is being replaced.
b. Provide a copy of TROs 3.7.6, 3.8.6, 3.7.9, 3.3.4, and 3.11.2.6 (i.e., TROs referenced in Table 1).

Response

a. Table 1 provides the details of the required LCO entries and the basis for the required timeframe. Due to the loss of the MCC, one division of ESSW Pumphouse ventilation will not be operable. Per the SSES Technical Requirements Manual Section 3.7.6, the associated pumps in that division need to be declared inoperable if at least two ventilation subsystems are not restored to operable status within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Both RHRSW pumps (Unit 1 and Unit 2 pump) and both ESW pumps in the affected division will become inoperable. The table incorrectly identifies that only 1 RHRSW pump would be declared inoperable.
b. Copies of TRM Sections 3.7.6, 3.8.6, 3.7.9, 3.3.4, and 3.11.2.6 are provided in. Common TROs (Unit 0; used by both Unit 1 and 2) only have 1 TRO filed under Unit 1. These TRM sections list all associated TRO actions and allowed timeframes for the completion of those actions. An additional TRO not previously identified is also provided (TRO 3.7.1). TRO 3.7.1 covers the operability of the ESW system in Modes 4 and 5 and also during movement of irradiated fuel in Secondary Containment.

RA14:

On page 8 of the enclosure to the LAR dated January 28, 2016, the licensee provides the sequence/flow path for replacement of a 480 V Engineered Safeguard System (ESS) Load Center (LC) Transformer and information that applies throughout the evolution. The following questions relate to provisions that the license will make in order to limit the potential loss of power to Unit 2 equipment during the replacement of all Unit 1 480 V ESS LC Transformers that feed both units:

a. The licensee provided a list of surveillances that will be performed prior to the transformer replacement sequence. What test/surveillance will the licensee perform to verify that all structures, systems, and components are operable prior to entering the transformer replacement sequence?
b. What compensatory measures will the licensee take in order to limit the potential loss of power to Unit 2 during the replacement of all Unit 1 480 V ESS LC Transformers (e.g.,

scheduling the evolution in order to avoid anticipated severe weather conditions, corridor the work zone as a Protected Area, restrictions on the maintenance of the switchyard, contacting the grid system load dispatcher to ensure no significant grid perturbations are expected)?

Page 4 of 8 SSES Response to RAI

Response

The station performs surveillances as required by Technical Specifications and the Technical Requirements Manual. As required by 10 CFR 50.65(a)(4), the risk of performing maintenance is assessed and mitigated prior to commencing. The control and assurance of safety required to perform this work is built in to normal station processes as required by regulation.

a. Assurance of systems capabilities during the evolution:

Since this work impacts power sources on the Class 1 E Distribution system, surveillance testing is focused on testing associated with Diesel Generator capability to power all other ESS busses. SR requirements 3.8.1.3/3.8.1.7 are performed under approved station procedures for each emergency diesel generator (EDG). SSES has 4 EDGs that are connected to the class 1 E distribution system to meet LCO 3.8.1. Diesels are tested monthly to ensure the ability to start from standby condition and achieve rated parameters within their required start times. Additionally, surveillance requirements ensure the EDGs are capable of providing emergency power for the full duration of which they are required.

Prior to transformer replacement, the 24 month LOCA/LOOP surveillance will be performed for the same division in the maintenance window. This assures that response of the other bus in that division and the diesel including safety related loads and load timers are all operable and performing as designed.

Prior to commencing transformer work, a review will be performed to determine if LCO 3.0.6 has been applied to either unit for any reason. If it has, a Loss of Safety Function analysis is performed. This ensures the ability to perform a safety function assumed in the accident analysis can be performed with the equipment verified operable. A Loss of Safety Function (LOSF) exists when, assuming no concurrent single failure, loss of offsite power, or loss of on-site diesel generator(s), a safety function assumed in the accident analysis cannot be performed. This LOSF review ensures all other systems structures and components are operable prior to commencing transformer work.

b. Actions to be taken during the evolution:

Actions to be taken in severe weather conditions are implemented by Operations shift personnel using approved procedures. These procedures instruct the evaluation and termination of non-essential or operationally risk significant activities. This includes discussion with transmission to evaluate impact of weather to the grid.

When notified, station procedures require the evaluation of work and assessment of risk based on grid operator notifications of alerts/warnings by operations shift supervision and work management.

The risk of emergent conditions is governed by approved station procedures which ensure the emergent conditions are included in the previously performed Page 5 of 8 SSES Response to RAl RAIS:

risk assessment and ensure the reassessed risk is acceptable. The online work week manager performs risk assessments for work performed in Modes 1, 2, and

3. The outage risk assessor performs EOOS shutdown risk assessments for work in Modes 4 and 5. The potential impact of severe weather on upcoming work is considered in these assessments.

One division of Diesel generators (2 DGs on the opposite division) is protected to ensure reliable electrical power to supply the outage Unit key safety functions.

This also facilitates strict control of entry into those DG rooms and limits what activities are allowed to occur. This ensures that reliable AC power to the opposite division will be present during a LOOP concurrent with transformer replacement.

The offsite power sources of TS 3.8.1 are both protected during the outage. The SSES portions of this protection are governed by the protected equipment program. Protection also extends to the switchyard owned by PPL Electric Utilities. The protection of components owned by PPL electric utilities needed by Susquehanna is protected using PPL Electric utilities processes. By procedure, SSES approves the protection scheme and references these schemes in SSES protection clearances. The interface between PPL electric utilities and Susquehanna is governed by a separate procedure.

The division opposite the transformer being replaced does not have work going on in parallel. This is controlled by the outage schedule and the status file review that occurs during the divisional swap. Additionally the divisional windows have their own codes for shutdown equipment out of service and as such are captured when risk is run in the EOOS program. Protected equipment on the opposite division also includes Core Spray/RHRIRHRSW/ESW/Power supplies to support the key safety functions of decay heat removal and inventory control.

The opposite division is also supporting decay heat removal and therefore has power supplies and support systems protected to ensure the key safety function of DHR is not compromised. Support systems include RHRSW and ESW. The protection of ESW to support DHR also maintains its availability to support Unit 2 loads and 4 EDGs.

On page 3 of the enclosure to the LAR dated January 28, 2016, the licensee stated that the ESS LC supplies power to the individual 480 V loads and to MCCs that power instrument alternating current (AC) distribution panels, 125 and 250 V direct current (DC) battery chargers, and essential plant lighting. Discuss in detail the impact of the replacement of a Unit 1 480 V ESS LC Transformer on the Unit 2 instrument AC and DC power system loads. Explain how the Unit 2 DC power system continues to permit functioning of structures, systems, and components important to safety during the replacement of a Unit 1 480 V ESS LC Transformer.

Page 6 of 8 SSES Response to RAJ

Response

The impacted Unit 2 instrument AC and DC power system loads supplied by Unit 1 are listed below.

Load Normal Power Source Alternate Power Source 2D613-U-2 125V DC BATTERY OB516 Can be aligned to 2B210 via 0-ATS-516 CHARGER OB516071 2D623 - U-2 125V DC BATTERY OB526 Can be aligned to 2B220 via 0-A TS-526 CHARGER OB526071 2D633 - U-2 125V DC BATTERY OB536 Can be aligned to 2B230 via 0-A TS-536 CHARGER OB536071 2D643 - U-2 125V DC BATTERY OB546 Can be aligned to 2B240 via 0-ATS-546 CHARGER OB536071 Based on all loads above having alternate power sources, the Unit 2 DC power system continues to permit functioning of structures, systems, and components important to safety during the replacement of a Unit 1 480V ESS LC Transformer Replacement. Loads will be aligned to alternate power sources as required to complete the work.

RAI6:

In Enclosure 1 to the April 6, 2016, letter, the licensee provided a table with the affected loads listed by transformer. For the Unit 2 Class 1 E loads powered from Unit 1, identify the alternate source of power/alternate train that would be used during the Unit 1 transformer replacements.

Response

The only affected Unit 2 loads affected by the proposed evolution are the battery chargers identified in RAI 5. To support the transformer replacement activities, the chargers will be aligned to their alternate power sources as specified.

RAI7:

The enclosure to the LAR dated January 26, 2016 (pages 8 and 9 of 30) presents a list of bulleted items that will apply throughout the evolution and a flow path for replacement. Provide more complete justification, including time estimates for why a full 7-day CT is needed.

Response

Work schedules developed by experienced schedulers were drafted using typical/historical values for a 480 V ESS Load Center transformer replacement evolution. The schedules show that 108 hours0.00125 days <br />0.03 hours <br />1.785714e-4 weeks <br />4.1094e-5 months <br /> of work is required strictly to replace the transformer.

This includes time to perform all work that cannot be performed outside of the LCO, such as:

Page 7 of 8

Attachment I Clearance order application Pre-evolution testing and maintenance SSES Response to RAI Engineering review of test results that may influence the scope or schedule of work to be performed The replacement itself Work that supports the replacement evolution such as scaffold, rigging, welding Post-evolution testing and maintenance The schedule considers human factors such as shift turnover and fatigue rule restrictions, further making the estimate realistic. The schedule does not consider any contingent replacements that may occur. This could include replacement of the surge arrestors, cables, and various other components. The risk of unanticipated outcomes weighed against Completion Times is a primary driver in planning evolutions such as this. The anticipated duration of 108 hours0.00125 days <br />0.03 hours <br />1.785714e-4 weeks <br />4.1094e-5 months <br /> is approximately 65% of the requested time (168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br />). This will accommodate unexpected responses or maintenance that may result during the transformer replacement.

Page 8 of 8 to PLA-7537 Susquehanna Nuclear, LLC Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.7.1 and 3.8.7 Affected Loads Affected Loads 1

OP514A EDG Fuel Oil Xfer Pump E-257 Sh lA 2

HV-01110A EDG Cooler in 'B' Loop Supply Vlv E-146 Sh 10 3

OP531A EDG Stby Jacket Water Pump E-259 Sh 2 4

HV-01122A EDG Cooler out 'A' Loop Return Vlv E-146 Sh 9A 5

OP533A EDG Stdby Lube Oil Pump E-259 Sh 5 6

HV-01120A EDG Cooler out 'B' Loop Return Vlv E-146 Sh lOA 7

HV-01112A EDG Cooler in 'A' Loop Supply Vlv E-146 Sh 9 8

OP532A EDG Pre Lube Pump E-259 Sh 6 9

OX507 480/277V Xfrmr supply to OC577A 10 OC577A EDG HVAC Panel E-193 Sh 2 0

11 OE508A EDG Jacket Wtr Heater E-259 Sh 4 rl N

X 12 OE525A EDG Lube Oil Heater E-259 Sh 7 rl 13 OV512A EDG Vent Supp Fan E-193 Sh 1 14 OE570A EDG Space Htr E-259 Sh 12 15 Norm Supp to 2D613 125 VDC Batt Chrgr for U2 E-26 Sh lB (a It supp port diesel gen) 16 OP530A EDG Jacket Wtr Circ Pump E-259 Sh 3 17 HV-01201A1 RHRSW Spray Pond Drain Vlv E-150 Sh 34 18 OX512 480/240-120V Xfrmr supply to OC578 19 OC578 ESSW Pumphouse HVAC Control Panel E-207 Sh 2 20 HV-01201A2 RHRSW Spray Pond Drain Vlv E-150 Sh 34 21

  • HV-08602A Emerg Switchgear Rm Chill Wtr Bypass Vlv E-214 Sh 13 22
  • HV-08603A Emerg Switchgear Rm Chill Wtr Supply Vlv E-214 Sh 13 23 OP514B EDG Fuel Oil Xfer Pump E-257 Sh lB 24 HV-01110B EDG Cooler in 'B' Loop Supply Vlv E-146 Sh lOB 25 OP531B EDG Stby Jacket Water Pump E-259 Sh 2 26 HV-01122B EDG Cooler out 'A' Loop Return Vlv E-146 Sh 9C 27 OP533B EDG Stdby Lube Oil Pump E-259 Sh 5 28 HV-01120B EDG Cooler out 'B' Loop Return Vlv E-146 Sh lOC 29 HV-01112B EDG Cooler in 'A' Loop Supply Vlv E-146 Sh 9B 30 OP532B EDG Pre Lube Pump E-259 Sh 6 31 OX508 480/240-120V Xfrmr to OC577B 0

32 OE525B EDG Lube Oil Heater E-259 Sh 7 N

N X

33 OE508B EDG Jacket Wtr Heater E-259 Sh 4 rl 34 OV512B EDG Vent Supp Fan E-193 Sh lA 35 OE570B EDG Space Htr E-259 Sh 12 36 Norm Supp to 2D623 125 VDC Batt Chrgr for U2 E-26 Sh lB (a It supp port diesel gen) 37 OP530B EDG Jacket Wtr Circ Pump E-259 Sh 3 38 OX513 480/240-120V Xfrmr supply to OC579 39 OC579 ESSW Pumphouse HVAC Control Panel E-207 Sh 4 40 HV-01201B2 RHRSW Spray Pond Drain Vlv E-150 Sh 34 41 HV-01201B1 RHRSW Spray Pond Drain Vlv E-150 Sh 34 42

  • HV-08601B Emerg Switchgear Rm Chill Wtr Return Vlv E-214 Sh 13
  • Electrically disabled Page 1 of 2 Affected Loads 1

OP514C EDG Fuel Oil Xfer Pump E-257 Sh 10 2

HV-01110C EDG Cooler in 'B' Loop Supply Vlv E-146 Sh 100 3

OP531C EOG Stby Jacket Water Pump E-259 Sh 2 4

HV-01122C EDG Cooler out 'A' Loop Return Vlv E-146 Sh 9E 5

OP533C EOG Stdby Lube Oil Pump E-259 Sh 5 6

HV-01120C EDG Cooler out 'B' Loop Return Vlv E-146 Sh lOE 7

HV-01112C EDG Cooler in 'A' Supply Vlv E-146 Sh 90 8

OP532C EOG Pre Lube Pump E-259 Sh 6 0

9 OX509 480/240-120V Xfrmr to OC577C

('(')

N 10 OC577C OG HVAC Panel E-193 Sh 20

.-t 11 OE525C EOG Lube Oil Heater E-259 Sh 7 12 OE508C EDG Jacket Wtr Heater E-259 Sh 4 13 OV512C EDG Supply Fan E-193 Sh lB 14 OE570C EDG Space Heater E-259 Sh 12 15 20633 125 VOC Battery Charger Unit 2 E-26 Sh lB 16 OP530C EOG Jacket Wtr Circ Pump E-259 Sh 3 17

  • HV-08601A Emerg. Switchgear Rm Chill Wtr Return Vlv E-214 Sh 13 18 OK115A Ctrl Struc Chiller Pumpout Compressor E-214 Sh 3 19 OP5140 EOG Fuel Oil Xfer Pump E-257 Sh 1 20 HV-011100 EDG Cooler in 'B' Loop Supply Vlv E-146 Sh lOF 21 OP5310 EDG Stby Jacket Water Pump E-259 Sh 2 22 HV-011220 EDG Cooler out 'A' Loop Return Vlv E-146 Sh 9G 23 OP5330 EOG Stdby Lube Oil Pump E-259 Sh 5 24 HV-011200 EDG Cooler out 'B' Loop Return Vlv E-146 Sh lOG 25 HV-011120 EDG Cooler in 'A' Supply Vlv E-146 Sh 9L 26 OP5320 EDG Pre Lube Pump E-259 Sh 6 0

27 OX510 480/240-120V Xfrmr to OC5770 o;:j' OC5770 OG HVAC Panel E-193 Sh 20 N

28

.-t 29 OE5250 EDG Lube Oil Heater E-259 Sh 7 30 OE5080 EDG Jacket Wtr Heater E-259 Sh 4 31 OV5120 EOG Supply Fan E-193 Sh lC 32 OE5700 EDG Space Heater E-259 Sh 12 33 20643 125 VOC Battery Charger 0 for Unit 2 E-26 Sh 1 34 OP5300 EDG Jacket Wtr Circ Pump E-259 Sh 3 35 OK115B Pumpout compressor for Ctrl Struc Chill E-214 Sh 3 36

  • HV-08603B Emerg Switchgear Rm Wtr Supp Vlv E-214 Sh 27 37
  • HV-08602B Emerg Switchgear Rm Wtr Bypass Vlv E-214 Sh 26

Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 6 3.11.2.6 3.11 Radioactive Effluents 3.11.2 Gaseous Effluents 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation TRO 3.11.2.6 The radioactive gaseous effluent monitoring instrumentation channels shown in Table 3.11.2.6-1 shall be OPERABLE with their setpoints established in accordance with the ODCM to ensure that the limits of Requirement 3.11.2.1 are not exceeded.

APPLICABILITY:

According to Table 3.11.2.6-1 ACTIONS


NOTE --------------------------------------------------------

1. Separate condition entry is allowed for each channel.
2. The provisions of TRO 3.0.6 are not applicable.

CONDITION A.

Radioactive gaseous effluent monitoring instrumentation channel alarm/trip setpoint less conservative than required to ensure that the limits of Requirement 3.11.2.1 are not exceeded REQUIRED ACTION A.1 Suspend the release of radioactive gaseous effluents monitored by the affected channel A.2 Declare the channel inoperable COMPLETION TIME Immediately Immediately (continued)

SUSQUEHANNA-UNIT 1 TRM I 3.11-25 EFFECTIVE DATE 04/12/2007

Rev. 6 ACTIONS (continued)

CONDITION B.

Reactor Building Ventilation System Noble Gas Activity Monitor low range channel inoperable C.

Deleted D.

Reactor Building Ventilation Monitoring System Effluent System Flow Rate Monitor or Sampler Flow Rate Monitor inoperable SUSQUEHANNA - UNIT 1 B.1 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 REQUIRED ACTION COMPLETION TIME Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress.

AND B.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isotopic activity to the required of grab sample LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1)

AND B.3 Restore monitoring 30 days instrumentation D.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> while release is in progress AND D.2 Restore monitoring 30 days instrumentation (continued)

TRM I 3.11-26 EFFECTIVE DATE 01/21/2004

Rev. 6 ACTIONS (continued)

CONDITION E.

Turbine Building Ventilation System Noble Gas Activity Monitor low range channel inoperable F.

Deleted G. Turbine Building Ventilation Monitoring System: Effluent Flow Rate Monitor or Sample (Bypass or Low Range) Flow Rate Monitor inoperable SUSQUEHANNA-UNIT 1 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 REQUIRED ACTION COMPLETION TIME E.1 Verify mechanical vacuum Immediately pump is not in operation AND E.2 Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress AND E.3 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after isotopic activity to the sample required LLDs for the principal noble gas gamma emitters (Table 3.11.2.1-1)

AND E.4 Restore monitoring instrumentation 30 days G.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> while release is in progress.

AND G.2 Restore monitoring 30 days instrumentation (continued)

TRM I 3.11-27 EFFECTIVE DATE 08/11/2016

Rev. 6 ACTIONS (continued)

CONDITION H.

Standby Gas Treatment System Noble Gas Activity Monitor low range channel inoperable I.

Deleted J.

SGTS Ventilation Monitoring System Effluent flow rate monitor or sample flow rate monitor inoperable SUSQUEHANNA-UNIT 1 H.1 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 REQUIRED ACTION COMPLETION TIME Take grab samples Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during operation of SGTS AND H.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isotopic activity to the required of grab sample LLDs for principal noble gas being taken gamma emitters (Table 3.11.2.1-1)

AND H.3 Restore monitoring 30 days instrumentation J.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during operation of SGTS AND J.2 Restore monitoring 30 days instrumentation (continued)

TRM I 3.11-28 EFFECTIVE DATE 09/08/2009

Rev. 6 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 ACTIONS (continued)

CONDITION K.

Required Actions and Completion Times not met for Conditions B through J REQUIRED ACTION K.1 Explain why this inoperability was not corrected in a timely manner TECHNICAL REQUIREMENT SURVEILLANCE COMPLETION TIME In the next Radioactive Effluent Release Report per TS Section 5.6


NOTE ---------------------------------------------------------

Refer to Table 3.11.2.6-1 to determine which TRSs apply for each Monitoring Function.

SURVEILLANCE FREQUENCY TRS 3.11.2.6.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.11.2.6.2 Deleted TRS 3.11.2.6.3 Perform Source Check 31 days TRS 3.11.2.6.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.11.2.6.5 Perform CHANNEL CALIBRATION 24 months SUSQUEHANNA-UNIT 1 TRM I 3.11-29 EFFECTIVE DATE 12/03/2004

Rev. 6 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 TABLE 3.11.2.6-1 (Page 1 of3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION FUNCTION APPLICABILITY REQUIRED CHANNELS SURVEILLANCE REQUIREMENTS

1.

REACTOR BUILDING VENTILATION MONITORING SYSTEM

a.

Noble Gas Activity Monitor (Low Range)

b. Deleted
c.

Deleted

d.

Effluent System Flow Rate Monitor

e. Sampler Flow Rate Monitor SUSQUEHANNA-UNIT 1 At all Times At all Times At all Times TRM I 3.11-30 1

1 TRS 3.11.2.6.1 TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)

EFFECTIVE DATE 01/21/2004

Rev. 6 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 TABLE3.11.2.6-1 (Page2of3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION FUNCTION APPLICABILITY

2.

TURBINE BUILDING VENTILATION MONITORING SYSTEM

a.

Noble Gas Activity Monitor (Low Range)

b.

Deleted

c. Deleted
d. Effluent System Flow Rate Monitor
e. Sample Flow Rate Monitor (Bypass)
f.

Sample Flow Rate Monitor (Low Range)

SUSQUEHANNA-UNIT 1 At all Times At all Times At all Times At all Times TRM/3.11-31 REQUIRED CHANNELS 1

SURVEILLANCE REQUIREMENTS TRS 3.11.2.6.1 TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)

EFFECTIVE DATE 08/11/2016

Rev. 6 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 TABLE 3.11.2.6-1 (Page 3 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION FUNCTION APPLICABILITY

3.

STANDBY GAS TREATMENT SYSTEM (STGS) MONITOR

a.

Noble Gas Activity Monitor (Low Range)

b.

Deleted

c. Deleted
d.

Effluent System Flow Rate Monitor

e.

Sampler Flow Rate Monitor (a)

TRO 3.0.4.c is applicable.

SUSQUEHANNA-UNIT 1 During operation of SGTS(al During operation of SGTS(a)

During operation of SGTS(a)

TRM I 3.11-32 REQUIRED CHANNELS SURVEILLANCE REQUIREMENTS TRS 3.11.2.6.1 TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 EFFECTIVE DATE 04/23/2015

Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 6 3.11.2.6 3.11 Radioactive Effluents 3.11.2 Gaseous Effluents 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation TRO 3.11.2.6 The radioactive gaseous effluent monitoring instrumentation channels shown in Table 3.11.2.6-1 shall be OPERABLE with their setpoints established in accordance with the ODCM to ensure that the limits of Requirement 3.11.2.1 are not exceeded.

APPLICABILITY:

According to Table 3.11.2.6-1 ACTIONS


NOTE---------------------------------------------------------

1. Separate condition entry is allowed for each channel.
2. The provisions of TRO 3.0.6 are not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A.

Radioactive gaseous A.1 Suspend the release of Immediately effluent monitoring radioactive gaseous effluents instrumentation channel monitored by the affected alarm/trip setpoint less channel conservative than OR required to ensure that the limits of Requirement A.2 Declare the channel Immediately 3.11.2.1 are not inoperable exceeded (continued)

SUSQUEHANNA-UNIT 2 TRM I 3.11 -25 EFFECTIVE DATE 04/12/2007

Rev. 6 ACTIONS (continued)

CONDITION B.

Reactor Building B.1 Ventilation System Noble Gas Activity Monitor low range channel inoperable AND B.2 AND B.3 C.

Deleted D.

Reactor Building D.1 Ventilation Monitoring System Effluent System Flow Rate Monitor or AND Sampler Flow Rate Monitor inoperable D.2 SUSQUEHANNA-UNIT 2 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 REQUIRED ACTION COMPLETION TIME Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress.

Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of isotopic activity to the grab sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1)

Restore monitoring 30 days instrumentation.

Estimate flow rate.

Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> while release is in progress Restore monitoring 30 days instrumentation.

(continued)

TRM I 3.11-26 EFFECTIVE DATE 01/21/2004

Rev. 6 ACTIONS (continued)

CONDITION E.

Turbine Building Ventilation System Noble Gas Activity Monitor low range channel inoperable F.

Deleted G. Turbine Building Ventilation Monitoring System: Effluent Flow Rate Monitor or Sample (Bypass or Low Range) Flow Rate Monitor inoperable SUSQUEHANNA-UNIT 2 E.1 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 REQUIRED ACTION COMPLETION TIME Verify mechanical vacuum Immediately pump is not in operation.

AND E.2 Take grab samples.

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress AND E.3 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after isotopic activity to the sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1).

AND E.4 Restore monitoring 30 days instrumentation G.1 Estimate flow rate.

Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> while release is in progress.

AND G.2 Restore monitoring 30 days instrumentation (continued)

TRM I 3.11-27 EFFECTIVE DATE 08/11/2016

Rev. 6 ACTIONS (continued)

CONDITION H.

Standby Gas Treatment System Noble Gas Activity Monitor low range channel inoperable I.

Deleted J.

SGTS Ventilation Monitoring System Effluent flow rate monitor or sample flow rate monitor Inoperable.

SUSQUEHANNA-UNIT 2 H.1 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 REQUIRED ACTION COMPLETION TIME Take grab samples.

Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during operation of SGTS AND H.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of isotopic activity to the required grab sample being LLDs for principal noble gas taken.

gamma emitters (Table 3.11.2.1-1).

AND H.3 Restore monitoring 30 days instrumentation.

J.1 Estimate flow rate.

Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during operation of SGTS AND J.2 Restore monitoring 30 days Instrumentation.

( contmued)

TRM I 3.11-28 EFFECTIVE DATE 09/08/2009

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 Rev. 6 ACTIONS (continued)

CONDITION K.

Required Actions and Completion Times not met for Conditions B through J.

REQUIRED ACTION K.1 Explain why this inoperability was not corrected in a timely manner.

TECHNICAL REQUIREMENT SURVEILLANCE COMPLETION TIME In the next Radioactive Effluent Release Report per TS Section 5.6.


NOTE----------------------------------------------------

Refer to Table 3.11.2.6-1 to determine which TRSs apply for each Monitoring Function.

SURVEILLANCE FREQUENCY TRS 3.11.2.6.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.11.2.6.2 Deleted TRS 3.11.2.6.3 Perform Source Check 31 days TRS 3.11.2.6.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.11.2.6.5 Perform CHANNEL CALIBRATION 24 months SUSQUEHANNA-UNIT 2 TRM I 3.11 -29 EFFECTIVE DATE 12/03/2004

Rev. 6 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 TABLE 3.11.2.6-1 (Page 1 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION FUNCTION

1.

REACTOR BUILDING VENTILATION MONITORING SYSTEM

a.

Noble Gas Activity Monitor (Low Range)

b.

Deleted

c.

Deleted d

Effluent System Flow Rate Monitor

e.

Sampler Flow Rate Monitor SUSQUEHANNA-UNIT 2 REQUIRED APPLICABILITY CHANNELS At all Times At all Times At all Times SURVEILLANCE REQUIREMENTS TRS 3.11.2.6.1 TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)

TRM I 3.11-30 EFFECTIVE DATE 01/21/2004

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 Rev. 6 TABLE 3.11.2.6-1 (Page 2 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

2.

TURBINE BUILDING VENTILATION MONITORING SYSTEM

a.

Noble Gas Activity Monitor At all Times TRS 3.11.2.6.1 (Low Range)

TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5

b.

Deleted

c.

Deleted

d.

Effluent System Flow Rate Monitor At all Times TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5

e.

Sample Flow Rate Monitor (Bypass)

At all Times TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5

f.

Sample Flow Rate Monitor At all Times TRS 3.11.2.6.1 (Low Range)

TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)

SUSQUEHANNA-UNIT 2 TRM I 3.11-31 EFFECTIVE DATE 08/11/2016

Rev. 6 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 TABLE 3.11.2.6-1 (Page 3 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION FUNCTION

3.

STANDBY GAS TREATMENT SYSTEM (SGTS) MONITOR

a.

Noble Gas Activity Monitor (Low Range)

b.

Deleted

c.

Deleted

d.

Effluent System Flow Rate Monitor

e.

Sampler Flow Rate Monitor (a)

TRO 3.0.4.c is applicable.

SUSQUEHANNA-UNIT 2 REQUIRED APPLICABILITY CHANNELS During operation of SGTS(aJ During operation of SGTS(aJ During operation of SGTS(aJ SURVEILLANCE REQUIREMENTS TRS 3.11.2.6.1 TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRM I 3.11-32 EFFECTIVE DATE 02/19/2015

TRM Post Accident Monitoring Instrumentation Rev. 9 3.3.4 3.3 Instrumentation 3.3.4 TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.

APPLICABILITY:

According to Table 3.3.4-1 ACTIONS


NOTES-------------------------------------------------------------

1. Separate condition entry is allowed for each Function.
2. The provisions of TRO 3.0.6 are not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required A.1 Enter the Condition referenced Immediately channel inoperable.

in Table 3.3.4-1 for the channel.

B.

As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of monitoring in Table 3.3.4-1.

the appropriate parameter(s).

AND B.2 Restore the required channel 7 days I 30 days (cJ to OPERABLE status.

C.

As required by Required C.1 Restore the required 30 days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.

D. As required by Required D.1 Verify a minimum 14 of the Immediately Action A.1 and referenced in associated acoustic monitor Table 3.3.4-1 channels and 5 of the ADS AND SRV acoustic monitor channels are operable.

Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (cJ COMPLETION TIME for REQUIRED ACTION B.2 IS extended from 7 to 30 days dunng construction activities associated with the replacement of SPING equipment with VERMS equipment.

SUSQUEHANNA-UNIT 1 TRM I 3.3-9 EFFECTIVE DATE 10/0712015

Rev. 9 ACTIONS (continued)

CONDITION SUSQUEHANNA-UNIT 1 OR D.2 OR D.3 AND D.4 TRM Post Accident Monitoring Instrumentation 3.3.4 REQUIRED ACTION Verify SRV tailpipe temperature indication and alarm are available for the tailpipe associated with the inoperable acoustic monitor.

Verify that the following alternate monitoring methods in TS Table 3.3.3.1-1 are OPERABLE:

Function 1 Function 2 Function 3 Function 10 Restore the required channel(s) to OPERABLE status.

COMPLETION TIME Immediately AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter Immediately AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter 30 days At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.

TRM I 3.3-9a EFFECTIVE DATE 06/30/2010

Rev. 9 TECHNICAL REQUIREMENT SURVEILLANCE TRM Post Accident Monitoring Instrumentation 3.3.4


N()TES ---------------------------------------------------------

1.

Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.

2.

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or an associated function is available.

SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 Perform CHANNEL FUNCTI()NAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATI()N. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level.

TRS 3.3.4.4 Perform CHANNEL CALIBRATI()N 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATI()N of the 92 days Primary Containment H2 and ()2 Analyzers.

SUSQUEHANNA-UNIT 1 TRM I 3.3-10 EFFECTIVE DATE 10/31/2007

1.
2.
3.
4.
5.

Rev. 9 TRM Post Accident Monitoring Instrumentation 3.3.4 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE Suppression Chamber Air 1,2 2

c TRS 3.3.4.1 Temperature TRS 3.3.4.4 Main Steam Safety/Relief Valve 1,2 1/valve D

TRS 3.3.4.1 Position Indicator (Acoustic TRS 3.3.4.2 Monitor)

TRS 3.3.4.3 Reactor Building Vent Noble Gas Monitor

a. Mid Range(b}

1,2, (a)

B TRS 3.3.4.1 TRS 3.3.4.4

b. High Range(b) 1,2, (a)

B TRS 3.3.4.1 TRS 3.3.4.4 Standby Gas Treatment System Vent Noble Gas Monitor

a. Mid Range(b}

1,2, (a) 1 B

TRS 3.3.4.1 TRS 3.3.4.4

b. High Range(b) 1,2, (a)

B TRS 3.3.4.1 TRS 3.3.4.4 Turbine Building Vent Noble Gas Monitor

a. Mid Range(b) 1,2 B

TRS 3.3.4.1 TRS 3.3.4.4

b. High Range(b) 1,2 B

TRS 3.3.4.1 TRS 3.3.4.4 (continued)

SUSQUEHANNA-UNIT 1 TRM I 3.3-11 EFFECTIVE DATE 10/07/2015

Rev. 9 TRM Post Accident Monitoring Instrumentation 3.3.4 TABLE 3.3.4-1 (continued)

TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE

6.

Standby Gas Treatment System Vent Stack Sampling System Flow

a.

Effluent System flow rate monitor{b) 1,2, (a) c TRS 3.3.4.1 TRS 3.3.4.4

b.

Sampler flow rate monitor(b) 1,2, (a) c TRS 3.3.4.1 TRS 3.3.4.4

7.

Turbine Building Vent Stack Sampling System Flow

a. Effluent System flow rate monitor{b) 1,2 c

TRS 3.3.4.1 TRS 3.3.4.4

b.

Sample flow rate monitor(b)

TRS 3.3.4.1 (Mid/High Range & Bypass) 1,2 c

TRS 3.3.4.4

8. Containment H2 and 0 2 Analyzer<bJ 1,2 2

c TRS 3.3.4.1 TRS 3.3.4.5 (a)

When moving irradiated fuel in the secondary containment.

(b)

TRO 3.0.4.c is applicable.

SUSQUEHANNA-UNIT 1 TRM I 3.3-11a EFFECTIVE DATE 08/11/2016

Rev. 9 TRM Post Accident Monitoring Instrumentation 3.3.4 3.3 Instrumentation 3.3.4 TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.

APPLICABILITY:

According to Table 3.3.4-1 ACTIONS


NOTES--------------------------------------------------------

1. Separate condition entry is allowed for each Function.
2. The provisions of TRO 3.06 are not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required A.1 Enter the Condition Immediately channel inoperable.

referenced in Table 3.3.4-1 for the channel.

B.

As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of in Table 3.3.4-1.

monitoring the appropriate parameter(s).

AND B.2 Restore the required channel 7 days I 30 days (c) to OPERABLE status.

C.

As required by Required C.1 Restore the required 30 days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.

D.

As required by Required D.1 Verify a minimum 14 of the Immediately Action A.1 and referenced associated acoustic monitor in Table 3.3.4-1 channels and 5 of the ADS AND SRV acoustic monitor channels are operable.

Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter

<cJ COMPLETION TIME for REQUIRED ACTION B.2 is extended from 7 days to 30 days during construction activities associated with the replacement of SPING equipment with VERMS equipment.

SUSQUEHANNA-UNIT 2 TRM I 3.3-9 EFFECTIVE DATE 1010712015

Rev. 9 ACTIONS (continued)

CONDITION SUSQUEHANNA-UNIT 2 TRM Post Accident Monitoring Instrumentation 3.3.4 REQUIRED ACTION OR D.2 Verify SRV tailpipe temperature indication and alarm are available for the tailpipe associated with the inoperable acoustic monitor.

OR D.3 Verify that the following alternate monitoring methods in TS Table 3.3.3.1-1 are OPERABLE:

  • Function 1
  • Function 2
  • Function 3
  • Function 10 D.4.

Restore the required channel(s) to OPERABLE status.

COMPLETION TIME Immediately AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter Immediately AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter 30 days At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.

TRM I 3.3-9a EFFECTIVE DATE 06/30/2010

Rev. 9 TRM Post Accident Monitoring Instrumentation 3.3.4 TECHNICAL REQUIREMENT SURVEILLANCE


N()TES--------------------------------------------------------

1.

Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.

2.

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or an associated function is available.

SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 Perform CHANNEL FUNCTI()NAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATI()N. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level.

TRS 3.3.4.4 Perform CHANNEL CALIBRATI()N 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATI()N of the Primary 92 days Containment H2 and ()2 Analyzers.

SUSQUEHANNA - UNIT 2 TRM I 3.3-10 EFFECTIVE DATE 10/31/2007

1.
2.
3.
4.
5.

Rev. 9 TRM Post Accident Monitoring Instrumentation 3.3.4 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE Suppression Chamber Air 1,2 2

c TRS 3.3.4.1 Temperature TRS 3.3.4.4 Main Steam Safety/Relief Valve 1,2 1/valve D

TRS 3.3.4.1 Position Indicator (Acoustic TRS 3.3.4.2 Monitor)

TRS 3.3.4.3 Reactor Building Vent Noble Gas Monitor

a. Mid Range(b) 1,2, (a) 1 B

TRS 3.3.4.1 TRS 3.3.4.4

b. High Range(b) 1,2, (a)

B TRS 3.3.4.1 TRS 3.3.4.4 Standby Gas Treatment System Vent Noble Gas Monitor

a. Mid Range(b) 1,2, (a) 1 B

TRS 3.3.4.1 TRS 3.3.4.4

b. High Range(b) 1,2, (a) 1 B

TRS 3.3.4.1 TRS 3.3.4.4 Turbine Building Vent Noble Gas Monitor

a. Mid Range(b) 1,2 B

TRS 3.3.4.1 TRS 3.3.4.4

b. High Range(b) 1,2 B

TRS 3.3.4.1 TRS 3.3.4.4 SUSQUEHANNA-UNIT 2 TRM I 3.3-11 EFFECTIVE DATE 10/07/2015

6.
7.
8.

Rev. 9 TRM Post Accident Monitoring Instrumentation 3.3.4 TABLE 3.3.4-1 (continued)

TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE Standby Gas Treatment System Vent Stack Sampling System Flow

a.

Effluent System 1,2, (a) c TRS 3.3.4.1 flow rate monitor(b)

TRS 3.3.4.4

b. Sampler flow rate 1,2, (a) 1 c

TRS 3.3.4.1 monitor(b)

TRS 3.3.4.4 Turbine Building Vent Stack Sampling System Flow

a. Effluent System 1,2 c

TRS 3.3.4.1 flow rate monitor(b)

TRS 3.3.4.4

b. Sample flow rate monitor(b) 1,2 c

TRS 3.3.4.1 (Mid/High Range &

TRS 3.3.4.4 Bypass)

Containment H2 and 0 2 1,2 2

c TRS 3.3.4.1 Analyzer(b)

TRS 3.3.4.5 (a)

When moving irradiated fuel in the secondary containment.

(b)

TRO 3.0.4.c is applicable.

SUSQUEHANNA-UNIT 2 TRM I 3.3-11a EFFECTIVE DATE 08/11/2016

PPL Rev. 0

3. 7 Plant Systems Emergency Service Water System (Shutdown) 3.7.1 3.7.1 Emergency Service Water System (ESW) Shutdown TRO 3.7.1 Two ESW Subsystems shall be OPERABLE Applicability:

Modes 4 and 5 When handling irradiated fuel in the secondary containment ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One pump in an ESW A.1 Initiate Action to verify Immediately Subsystem Inoperable that adequate cooling capability remains available for the diesel generators required to be OPERABLE by Technical Specification LCO 3.8.2 B. Two pumps in an ESW B.1 Declare the supported Immediately Subsystem Inoperable required equipment Inoperable (except diesel OR generators)

The ESW subsystem AND otherwise Inoperable Immediately B.2 Initiate Action to verify that adequate cooling remains available for the diesel generators required to be OPERABLE by Technical Specification LCO 3.8.2 (continued)

SUSQUEHANNA-UNIT 1 TRM I 3.7-1 EFFECTIVE DATE 8/31/1998

PPL Rev. 0 ACTIONS (continued)

CONDITION C. Inadequate ESW Flow to required Diesel Generators Emergency Service Water System (Shutdown) 3.7.1 REQUIRED ACTION C.1 Declare the affected required diesel generator(s) inoperable COMPLETION TIME Immediately TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.7.1.1 Ensure the Surveillance Requirements of LCO As required in 3.7.2 "ESW System" are met.

LCO 3.7.2 SUSQUEHANNA-UNIT 1 TRM I 3.7-2 EFFECTIVE DATE 8/31/1998

PPL Rev. 3

3. 7 Plant Systems ESSW Pumphouse Ventilation 3.7.6 3.7.6 ESSW Pumphouse Ventilation TRO 3.7.6 Two ESSW Pumphouse Ventilation Subsystems shall be OPERABLE.

APPLICABILITY:

Whenever associated RHRSW and ESW Pumps are required to be OPERABLE.

ACTIONS


NOTES --------------------------------------------------------

1.

If two or more fans and one or more dampers render ESSW Pumphouse Ventilation Subsystem fan train(s) inoperable, enter both the appropriate Condition for inoperable fan(s) and Condition D, E, For G.

2.

Dampers gagged in the appropriate position may be un-gagged intermittently under administrative controls to allow for work and/or operability testing.

CONDITION REQUIRED ACTION COMPLETION TIME A.

Two ESSW Pumphouse A.1 Restore inoperable equipment 30 days Ventilation Subsystem fan so at least three fans in each trains in one or both subsystem are in OPERABLE subsystems inoperable due status.

to inoperable fans.

B.

Three ESSW Pumphouse B.1 Restore inoperable equipment 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Ventilation Subsystem fan so at least two fans in each trains in one or both subsystem are in OPERABLE subsystems inoperable due status.

to inoperable fans.

SUSQUEHANNA-UNIT 1 TRM I 3.7-41 EFFECTIVE DATE 05/24/2012

PPL Rev. 3 ACTIONS (continued)

CONDITION C.

Four fan trains in one or both subsystems inoperable due to inoperable fans.

D.


NOTE------------

Separate Condition entry is allowed for each damper.

One ESSW Pumphouse Ventilation Subsystem fan train in one or both subsystems inoperable due to one or more dampers inoperable (includes previously failed dampers that are not repaired).

E. ------------NOTE------------

Separate Condition entry is allowed for each damper.

Two ESSW Pumphouse Ventilation Subsystem fan trains in one or both subsystems inoperable due to one or more dampers inoperable (includes previously failed dampers that are not repaired).

SUSQUEHANNA-UNIT 1 C.1 AND C.2 D.1 AND D.2 E.1 AND E.2 ESSW Pumphouse Ventilation 3.7.6 REQUIRED ACTION COMPLETION TIME Establish acceptable 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ventilation flow path.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Restore inoperable equipment so at least two fans in each subsystem are in OPERABLE status.

Track failed dampers.

Immediately Gag damper or secure and 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> deactivate damper actuator on the affected fans' dampers in the appropriate position.

Gag damper or secure and 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> deactivate damper actuator on the affecte3d fans' dampers in the appropriate position.

Restore all dampers in at least 30 days three fan trains in both subsystems to original design/functional status.

TRM I 3.7-41 a EFFECTIVE DATE 05/24/2012

PPL Rev. 3 ACTIONS (continued)

CONDITION F.


N 0 T E ------------

Separate Condition entry is allowed for each damper.

Three ESSW Pumphouse Ventilation Subsystem fan trains in one or both subsystems inoperable due to one or more dampers inoperable (includes previously failed dampers that are not repaired).

G.


NOTE------------

Separate Condition entry is allowed for each damper.

Four ESSW Pumphouse Ventilation Subsystem fan trains in one or both subsystems inoperable due to one or more dampers inoperable (includes previously failed dampers that are not repaired).

H.

Required Action and associated Completion Time of Conditions A, B, C, E, For G not met.

SUSQUEHANNA-UNIT 1 F.1 AND F.2 G.1 AND G.2 AND G.3 H.1 ESSW Pumphouse Ventilation 3.7.6 REQUIRED ACTION COMPLETION TIME Gag damper or secure and 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> deactivate damper actuator on the affected fans' dampers in the appropriate position.

Restore all dampers in at least 30 days three fan trains in both subsystems to original design/functional status.

Establish acceptable 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ventilation flow path.

Gag damper or secure and 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> deactivate damper actuator on the affected fans' dampers in the appropriate position.

Restore all dampers in at least 30 days three fan trains in both subsystems to original design/functional status.

Declare the associated Immediately ESW/RHRSW pumps inoperable.

TRM I 3.7-41b EFFECTIVE DATE 05/24/2012

PPL Rev. 3 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE ESSW Pumphouse Ventilation 3.7.6 FREQUENCY TRS 3.7.6.1 Verify that the ESSW Pumphouse Ventilation 92 days Subsystems fans start and associated dampers automatically position when their associated pump starts.

SUSQUEHANNA-UNIT 1 TRM I 3.7-41 c EFFECTIVE DATE 05/24/2012

PPL Rev. 2

3. 7 Plant Systems 3.7.9 Control Structure HVAC Control Structure HVAC 3.7.9 TRO 3.7.9 The following Control Structure HVAC Subsystems shall be OPERABLE:
a.

Control Structure Heating and Ventilating System

b.

Computer Room Floor Cooling System

c.

Control Structure Chilled Water

d.

Battery Room Exhaust System

e.

SGT Equipment Room Ventilation System (Heating)

f.

SGT Equipment Room Ventilation System (Cooling)

APPLICABILITY:

MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment.

During CORE ALTERATIONS.

During operations with a potential for draining the reactor vessel (OPDRVs).


NOTE----------------------------------------------------------

1. If Conditions and Required Actions for this TRO that direct entry into LCOs are not completed. LCO 3.0.3 should be entered not TRO 3.0.3.
2. Enter applicable Conditions and Required Actions of LCO 3.7.3 "Control Room Emergency Outside Air Supply (CREOAS) System" and LCO 3.7.4 "Control Room Floor Cooling System" for Technical Specification Functions made inoperable by the inoperable Control Structure HVAC Subsystems.
3. Control Structure and Computer Room Ventilation fans are also governed by LCO 3.7.3 "Control Room Emergency Outside Air Supply (CREOAS) System."

ACTIONS CONDITION A

A single division of subsystems a-e inoperable for its cooling or heating mode SUSQUEHANNA-UNIT 1 REQUIRED ACTION A.1 Restore all affected subsystems to OPERABLE status COMPLETION TIME 30 days (continued)

TRM I 3.7-50 EFFECTIVE DATE 01/21/2014

PPL Rev. 2 ACTIONS (continued)

CONDITION REQUIRED ACTION B.

A single division of B.1 Restore the affected cooling subsystem f inoperable unit to OPERABLE status C.

Both divisions of any C. 1 Declare affected equipment subsystem inoperable for inoperable and enter all the cooling or heating appropriate LCOs/TROs mode D.

Required Action and D. 1 Be in MODE 3 associated Completion Time of Condition A, or B AND not met D.2 Be in MODE 4 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE Control Structure HVAC 3.7.9 COMPLETION TIME 30 days Immediately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours FREQUENCY TRS 3.7.9.1 Administratively verify that the Control Structure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> HVAC Subsystems are available SUSQUEHANNA-UNIT 1 TRM I 3.7-51 EFFECTIVE DATE 08/16/2006

PPL Rev. 1 3.8 Electrical Power Emergency Switchgear Room Cooling 3.8.6 3.8.6 Emergency Switchgear Room Cooling TRO 3.8.6 Two Emergency Switchgear Room Cooling subsystems shall be OPERABLE.

APPLICABILITY:

Whenever associated emergency switchgear is required to be OPERABLE ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One required Unit 1 A.1


NOTE----------------

30 days Emergency Switchgear Applicable only in MODES Room Cooling subsystem 1, 2, or 3 inoperable.

Restore subsystem to OPERABLE status B.

Two required Unit 1 B.1


NOTE----------------

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Emergency Switchgear Applicable only in MODES Room Cooling subsystems 1,2, or 3 inoperable.

Restore at least one required subsystem to OPERABLE status AND (continued)

SUSQUEHANNA-UNIT 1 TRM I 3.8-24 EFFECTIVE DATE 11/30/2011

PPL Rev. 1 Emergency Switchgear Room Cooling 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.2 ----------------NOTE----------------

Immediately Applicable only in MODES 4, 5, or OPDRVs, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment.

Suspend CORE ALTERATIONS, OPDRVs, and handling irradiated fuel in the secondary containment.

AND B. 3 ----------------N 0 T E ----------------

Immediately Applicable only in MODES 4, 5, or OPDRVs, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment Initiate action to restore one subsystem to OPERABLE status.

C.

Required Action and C. 1 Declare affected distribution Immediately associated Completion system inoperable and take Time of Condition A or B Actions required by LCO 3.8. 7 not met or LCO 3.8.8.

TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.8.6.1 Administratively verify that the Unit 1 Emergency Switchgear Room Cooling subsystem are available.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SUSQUEHANNA - UNIT 1 TRM I 3.8-25 EFFECTIVE DATE 11/30/2011

PPL Rev. 2 3.8 Electrical Power Emergency Switchgear Room Cooling 3.8.6 3.8.6 Emergency Switchgear Room Cooling TRO 3.8.6 Two Emergency Switchgear Room Cooling subsystems shall be OPERABLE.

APPLICABILITY:

Whenever associated emergency switchgear is required to be OPERABLE ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One required Unit 2 A.1


NOTE--------------

30 days Emergency Switchgear Applicable only in MODES Room Cooling subsystem 1, 2, or 3.

inoperable.

Restore subsystem to OPERABLE status.

B.

Two required Unit 2 B.1


NOTE---------------

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Emergency Switchgear Applicable only in MODES Room Cooling subsystems 1, 2, or 3.

inoperable.

Restore at least one required subsystem to OPERABLE status.

AND (continued)

SUSQUEHANNA-UNIT 2 TRM I 3.8.24 EFFECTIVE DATE 11/30/2011

PPL Rev. 2 ACTIONS (continued)

CONDITION B.2 AND B.3 C.

Required Action and C.1 associated Completion Time of Condition A or B not met D.

One required Unit 1 0.1 Emergency Switchgear Room Cooling subsystem inoperable.

SUSQUEHANNA - UNIT 2 Emergency Switchgear Room Cooling 3.8.6 REQUIRED ACTION COMPLETION TIME


NOTE----------------

Immediately Applicable only in MODES 4, 5, or OPDRVs, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment.

Suspend CORE ALTERATIONS, OPDRVs, and handling irradiated fuel in the secondary containment.


NOTE-----------------

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Applicable only in MODES 4, 5, or OPDRVs, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment.

Restore at least one required subsystem to OPERABLE status.

Declare affected distribution Immediately system inoperable and take Actions required by-Unit 2 LCO 3.8.7 or LCO 3.8.8.


NOTE-----------------

30 days Applicable only in Unit 2 MODES 1, 2, or 3.

Restore subsystem to OPERABLE status.

(continued)

TRM I 3.8.25 EFFECTIVE DATE 06/11/2012

PPL Rev. 2 ACTIONS (continued)

CONDITION E.

Two required Unit 1 Emergency Switchgear Room Cooling subsystems inoperable.

SUSQUEHANNA-UNIT 2 Emergency Switchgear Room Cooling 3.8.6 REQUIRED ACTION E.1


NOTE-----------------

AND Applicable only in Unit 2 MODES 1, 2, or 3.

Restore at least one required subsystem to OPERABLE status.

E. 2


NOTE-----------------

Applicable only in Unit 2 MODES 4, 5, or OPDRV's, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment.

AND Suspend CORE ALTERATIONS, OPDRVs, and handling irradiated fuel in the secondary containment.

E. 3


NOTE-----------------

Applicable only in Unit 2 MODES 4, 5, or OPDRV's, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment.

Initiate action to restore one subsystem to OPERABLE status.

COMPLETION TIME 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Immediately Immediately (continued)

TRM I 3.8.25a EFFECTIVE DATE 11/30/2011

PPL Rev. 2 Emergency Switchgear Room Cooling 3.8.6 ACTIONS* (continued)

CONDITION F.

Required Action and F.1 associated Completion Time of Condition D orE not met.

REQUIRED ACTION Declare affected distribution system inoperable and take actions required by Unit 1 LCO 3.8.7 or LCO 3.8.8.

TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE COMPLETION TIME Immediately FREQUENCY TRS 3.8.6.1 Administratively verify that the Unit 2 Emergency 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Switchgear Room Cooling Fans (2V222) are available.

TRS 3.8.6.2 Verify that the Emergency Switchgear Room Cooler 92 days Chiller (2K21 0) will run for at least 60 minutes.

TRS 3.8.6.3 Verify each Emergency Switchgear Room Cooler 24 months Chiller (2K21 0) has the capability to maintain the design temperature of the emergency switchgear and load center rooms.

SUSQUEHANNA-UNIT 2 TRM I 3.8.25b EFFECTIVE DATE 11/30/2011