. Mr. J. W. Hampton Vice President, Ocon W Site Duke Power Company P. 0. Box 1439 Seneca, South Carolina 29679
SUBJECT:
EVALUATION OF THE OCONEE, UNITS 1, 2, AND 3 GENERIC SAFETY ISSUES (GSI) RESOLUTION (TAC NOS. M74440, M74441, AND M74442)
Dear Mr. Hampton:
By letter dated November 30, 1990, Duke Power Company (DPC) submitted its Individual Plant Examination (IPE) for the Oconee Nuclear Station, Units 1, 2, and 3. The staff evaluation of the IPE was forwarded to you by letter dated April 1, 1993. As part of the IPE process, you also proposed resolution of GSI-23, "Reactor Coolant Pump Seal Failures," GSI-105, "Interfacing System LOCA in LWRs," and GSI-130, "Essential Service Water Pump Failures at Multi Unit Sites."
Since GSI-130 did not apply to Oconee, the reliability of the service water system at Oconee was addressed under GSI-153, "Loss of Essential Service Water in LWRs."
The staff evaluation of the proposed resolution of these GSIs had not been completed at the time the evaluation of the IPE was forwarded to you and was to be provided separately.
The NRC staff has completed its review of your proposed resolution of the three GSIs. Enclosed are the Staff Evaluation Reports documenting the staff's findings for GSI-23 and GSI-105. Based on this review, we conclude that the issues pertaining to GSI-23 and GSI-105 have been adequately addressed for Oconee, Units 1, 2, and 3, and are therefore resolved. Since GSI-153 is being addressed through on-going regulatory and industry initiatives, we determined that it would be inappropriate to close-out this issue on a plant specific basis.
If you have questions regarding this matter, contact me at (301) 415-1495.
Sincerely,
/s/
3 3Leonard A. Wiens, Senior Project Manager 9503280323 95032469 Project Directorate 11-3 PDR ADOCK 05000269 p
PDR Division of Reactor Projects -
I/II Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270 and 50-287
Enclosure:
Staff Evaluation Reports cc w/enclosure: See next page C) DISTRIBUTION:
HBerkow JZwolinski Mao(Qo cket-F-i-1-e' LWiens EMerschoff, RII PUBLIC LBerry RHernan PDII-3 R/F OGC, 0-15 B18 RCrlenjak, RH SVarga ACRS (4) TWF
- SEE PREVIOUS CONCURRENCE Aol4 To receive a copy of this document, indicate in the box: "C" = Co y without attachment/enclosure "E" = Copy with attachment/enclosure "N"-
No copy OFFICE LA:PD23:DRP E PM:PD23:DRP j
BC:SPLB -BC:SP
- D I
BC:SRXB:DSSA*
3:D NAME LBERRY LWIENS:cwu CMcCRA N
.f.%
EBUIC ER RJONES RKOW DATE I/
/95 1,95
//495 3 /41/95 02/07/95
/ '7Z 95 OFFICIAL RECORD COPY DOCUMENT NAME: G:\\OCONEE\\GSILTR
UNITED STATES 0
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555--0001 March 24, 1995 Mr. J. W. Hampton Vice President, Oconee Site Duke Power Company P. 0. Box 1439 Seneca, South Carolina 29679
SUBJECT:
EVALUATION OF THE OCONEE, UNITS 1, 2, AND 3 GENERIC SAFETY ISSUES (GSI) RESOLUTION (TAC NOS. M74440, M74441, AND M74442)
Dear Mr. Hampton:
By letter dated November 30, 1990, Duke Power Company (DPC) submitted its Individual Plant Examination (IPE) for the Oconee Nuclear Station, Units 1, 2, and 3. The staff evaluation of the IPE was forwarded to you by letter dated April 1, 1993. As part of the IPE process, you also proposed resolution of GSI-23, "Reactor Coolant Pump Seal Failures," GSI-105, "Interfacing System LOCA in LWRs," and GSI-130, "Essential Service Water Pump Failures at Multi Unit Sites." Since GSI-130 did not apply to Oconee, the reliability of the service water system at Oconee was addressed under GSI-153, "Loss of Essential Service Water in LWRs."
The staff evaluation of the proposed resolution of these GSIs had not been completed at the time the evaluation of the IPE was forwarded to you and was to be provided separately.
The NRC staff has completed its review of your proposed resolution of the three GSIs. Enclosed are the Staff Evaluation Reports documenting the staff's findings for GSI-23 and GSI-105. Based on this review, we conclude that the issues pertaining to GSI-23 and GSI-105 have been adequately addressed for Oconee, Units 1, 2, and 3, and are therefore resolved. Since GSI-153 is being addressed through on-going regulatory and industry initiatives, we determined that it would be inappropriate to close-out this issue on a plant specific basis.
If you have questions regarding this matter, contact me at (301) 415-1495.
Sincerely, Leonard A. Wiens, Senior Project Manager Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270 and 50-287
Enclosure:
Staff Evaluation Reports cc w/enclosure: See next page
Mr. J. W. Hampton Duke Power Company Oconee Nuclear Station cc:
A. V. Carr, Esquire Mr. Ed Burchfield Duke Power Company Compliance 422 South Church Street Duke Power Company Charlotte, North Carolina 28242-0001 Oconee Nuclear Site P. 0. Box 1439 J. Michael McGarry, III, Esquire Seneca, South Carolina 29679 Winston and Strawn 1400 L Street, NW.
Ms. Karen E. Long Washington, DC 20005 Assistant Attorney General North Carolina Department of Mr. Robert B. Borsum Justice Babcock & Wilcox P.0. Box 629 Nuclear Power Division Raleigh, North Carolina 27602 Suite 525 1700 Rockville Pike Mr. G. A. Copp Rockville, Maryland 20852 Licensing -
ECO50 Duke Power Company Manager, LIS 526 South Church Street NUS Corporation Charlotte, North Carolina 28242-0001 2650 McCormick Drive, 3rd Floor Clearwater, Florida 34619-1035 Dayne H. Brown, Director Division of Radiation Protection Senior Resident Inspector North Carolina Department of U. S. Nuclear Regulatory Commission Environment, Health and Route 2, Box 610 Natural Resources Seneca, South Carolina 29678 P. 0. Box 27687 Raleigh,, North Carolina 27611-7687.
Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW. Suite 2900 Atlanta, Georgia 30323 Max Batavia, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201 County Supervisor of Oconee CountyN Walhalla, South Carolina 29621
STAFF EVALUATION REPORT FOR OCONEE REGARDING GI-23, "REACTOR COOLANT PUMP SEAL FAILURES" 1.0 Introduction A loss-of-coolant accident (LOCA) can occur if leakage through the reactor coolant pump (RCP) seals exceeds the capacity of the normal makeup system.
RCP seals limit the leakage of reactor coolant along the pump shaft, directing the majority of this flow back to the chemical and volume control system (CVCS), with the remainder being directed to the reactor coolant drain tanks.
The RCPs use a series of primary and secondary seals to limit the reactor coolant leakage to containment. Therefore, these seals are part of the reactor coolant system pressure boundary.
There are common mode vulnerabilities that could result in an RCP seal LOCA, followed by inoperable mitigating systems, and thus lead to core damage. One such scenario involves the complete loss of the component cooling water (CCW) system, which provides cooling water to the seal thermal barrier heat exchanger, among other systems. In some plants, the reactor coolant makeup system pumps or CVCS charging pumps or high pressure safety injection pumps that supply RCP seal injection flow are also cooled by the CCW system.
Therefore, for some plants, complete loss of CCW could result in the equivalent of a small-break LOCA caused by seal degradation, with no high pressure safety injection pumps available for emergency core cooling. This sequence of events could lead to core damage and could be initiated by the loss of all ac power (station blackout).
2.0 Evaluation Duke Power Company (DPC) has submitted information (Ref. 1 and 2) to the NRC as part of the IPE process, and has included information on the proposed resolution for GI-23 for the Oconee Station. The staff reviewed this information and on July 21, 1992, requested the licensee to provide additional information that was needed to reach a conclusion on this matter (Ref. 3).
The staff also provided a Draft Regulatory Guide, DG-1008 (Ref. 4), that contained guidance on RCP seals at the current state of development by the staff. On September 4, 1992, the licensee provided additional information and responses to the staff's specific questions regarding GI-23 (Ref. 5).
Duke Power Company maintains that GI-23 should be considered resolved for Oconee because of some unique features at Oconee leading to the predicted core damage frequency (CDF) from RCP seal failures being low. The unique features include a highly reliable ECCS system with multiple means for coping with random seal LOCAs, a diverse RCP seal cooling system, and a backup seal cooling system capable of functioning during a station blackout event. The
-2 responses to the staff's questions further clarified the information provided in the IPE submittal, but were not necessarily intended to show compliance with the positions described in DG-1008.
The staff reviewed the unique features of Oconee which included the following:
(1) Operating procedures for RCP seals currently in place are consistent with DG-1008 position concerning procedures. The intent is to prevent seal leaks from becoming small-break LOCAs.
(2) Instrumentation relative to RCP seals at Oconee is provided and appears adequate to allow the operator to determine the correct course of action for anticipated operational conditions and occurrences.
(3) The SSF is designed in a manner consistent with or better than the guidelines provided in DG-1008 for independent seal cooling capability.
(4) The criterion to reestablish cooling within 10 minutes of loss of seal cooling mentioned in DG-1008 is also met, as reported on Page 10-10 of the Oconee IPE report that "Operators are trained that seal cooling.must be re-established within 10 minutes following a loss of seal cooling to preclude damage," and further confirmed in response to the staff question 5b(2).
(5) At Oconee the service water dependency is of relatively low concern because both the Low Pressure Service Water (LPSW) and High Pressure Service Water Systems are independent systems and, except for relying on ac power and sharing a common suction source, they function to provide a reliable source for HPI pump cooling.
3.0 Conclusion The staff agrees that information provided by the licensee shows unique features that provide redundant RCP seal cooling and thus provides adequate protection against RCP seal failures at Oconee. Most of these features meet the intent of the staff's approach to the resolution of GI-23 documented in DG-1008. Specifically, Oconee meets the staff's proposed position relative to having the ability to cope with off-normal events. The staff has decided to treat the normal operation aspects of RCP seals as a separate issue.
-3 Based on the results of the evaluation indicated above, the staff concludes that the Oconee IPE submittal for Units 1, 2, and 3, has adequately addressed the draft GI-23 concerns pertaining to the RCP seal failures.
4.0 References
- 1.
Duke Power Company, "Oconee Nuclear Station Units 1, 2, 3 Individual Plant Examination Submittal Report," December 1990.
- 2.
Duke Power Company, "Oconee Nuclear Station Unit 3 Probabilistic Risk Assessment Report," December 1990.
- 3.
L. Wiens, USNRC to J. Hampton, Duke Power Company, "Request for Additional Information Concerning Oconee Individual Plant Examination (IPE) Submittal for Generic Issues (GI)-105, 153, and 23 (TACs M74440/M74442/M74442)," July 21, 1992.
- 4.
USNRC, Office of Nuclear Regulatory Research, Draft Regulatory Guide DG 1008 "Reactor Coolant Pump Seals," April 1991.
- 5.
J. Hampton, Duke Power Company to USNRC, "Oconee Nuclear Site Docket Nos:
50-269, -270, -287 NRC Generic Letter 88-20 Individual Plant Examination Submittal Response to Request for Additional Informationi,"'
September 4, 1992.
Staff Evaluation Report for Oconee Regarding GI-105, "Interfacing Systems LOCA in LWRs"
- 1.
Introduction An interfacing systems loss of coolant accident (ISLOCA) is defined as a breach of the pressure boundary between the reactor coolant system (RCS) and any one of several low pressure systems.
Breaching the pressure boundary consists of the failure or improper operation of the two or more pressure isolation valves (typically check valves and/or motor operated valves) that compose the boundary. If high pressure RCS coolant enters the relatively low pressure interfacing
- system, the possibility exists of overpressurizing and rupturing the system, which typically extends outside containment. This then produces a situation where primary coolant is being lost outside containment.
If the break is not isolated, core damage is likely with the subsequent release of radioactive material bypassing containment.
- 2.
Evaluation Several NRC sponsored studies have analyzed PWR susceptibility to
ISLOCA (Ref. 1-4) without revealing generic problems.
The major insight from the latest studies is that ISLOCA problems are highly plant specific (Ref. 2-4).
Because of that and because the calculated risk is low at the plants analyzed, it was concluded (Ref.
- 5) that the most effective course of action for resolution of GI-105 was plant-specific analyses at each PWR. However, the IPE submittal guidance (NUREG-1335) mentions ISLOCA as a sequence to be included in the evaluation (Ref. 6) and to be reported upon under certain conditions (Ref. 7, Appendix 2).
Given the relatively low risk indicated in the NRC sponsored studies, it is likely that nothing beyond participation in the IPE program will be required for resolution of GI-105.
In the case of Oconee, the submittal and subsequent response (Ref.
- 8) to questions (Ref. 9) included analyses of the major interfaces of concern (LPI and DHR) and the low pressure auxiliary spray line and adequate justification for not including analyses of other interfacing systems.
- 3.
Conclusion The core damage frequency (CDF) from ISLOCA at Oconee has been demonstrated to be sufficiently low to consider GI-105 resolved at Oconee.
The low CDF was achieved through numbers of valves in series (LPI and auxiliary spray line), individual leak testing of valves (LPI), and use of pressure interlocks plus daily verified valve position indication (DHR).
- 4.
References
- 1.
G. Bozoki, et al.,
"Interfacing Systems LOCA; Pressurized Water Reactors," NUREG/CR-5102, February 1989.
- 2.
D. L. Kelly, et al., "Assessment of ISLOCA Risk-Methodology and Application to a Westinghouse Four-Loop Ice Condenser Plant," NUREG/CR-5744, April 1992.
- 3.
D. L. Kelly, et al., "Assessment of ISLOCA Risk-Methodology and Application to a Combustion Engineering Plant," NUREG/CR 5745, April 1992.
- 4.
W. J. Galyean and D. L. Gertman, "Assessment of ISLOCA Risk Methodology and Application to a Babcock and Wilcox Nuclear Power Plant," NUREG/CR-5604, April 1992.
- 5.
Regulatory Analysis for the Resolution of Generic Issue 105:
Interfacing System Loss of Coolant Accident in Light Water Reactors (Draft for Comment), NUREG-1463 (Draft).
- 6.
"Individual Plant Examination:
Submittal Guidance,"
NUREG-1335, July 1989.
- 7.
"Individual Plant Examination for Severe Accident Vulnerabilities 10 CFR50.54(f)
November 23, 1988.
- 8.
J. W. Hampton, Duke Power letter to USNRC, "Oconee Nuclear Site, Docket Nos:
50-269, -270, -287, NRC Generic Letter 88 20, Individual Plant Examination Submittal, Response to Request for Additional Information," September 4, 1992.
- 9.
Leonard A. Wiens, USNRC letter to J. W. Hampton, Duke Power, "Request for Additional Information Concerning Oconee Individual Plant Examination (IPE) Submittal for Generic Issues (GI) -105,
-153, and -23 (TACS M74440/M74441/M74442),"
July 21, 1992.
2