Text
FORD 1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9012280279
DOC.DATE: 90/11/30
NOTARIZED: NO
DOCKET #
FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.
05000269
50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.
05000270
50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.
05000287
AUTH.NAME
AUTHOR AFFILIATION
EBNETER,S.D.
Region 2 (Post 820201)
RECIP.NAME
RECIPIENT AFFILIATION
TUCKMAN,M.S.
Duke Power Co.
SUBJECT: Forwards errata sheet & Final SALP Repts 50-269/90-24,
50-270/90-24,50-270/90-24 & 72-0004/90-24 for Feb 1989
Jul 1990.
DISTRIBUTION CODE: IE40D COPIES RECEIVED:LTR /
ENCL
SIZE:8 -40
TITLE: Systematic Assessment of Licensee Performance (SALP) Report
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-3 LA
1
0
PD2-3 PD
1
1
WIENS,L
1
1
INTERNAL: ACRS
2
2
AEOD/DOA
1
1
AEOD/DSP/TPAB
1
1
COMMISSION
5
5
F
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DLPQ/LHFB11
1
1
NRR/DLPQ/LPEB10
1
1
NRR/DOEA/OEAB11
1
1
NRR/DREP/PEPB9D
1
1
NRR/DREP/PRPB11
1
1
NRR/DRIS/RSGB9D
1
1
NRR/DRIS/RSIB9A
1
1
NRR/PMAS/ILRB12
1
-1
NUDOCS-ABSTRACT
1
1
1
1
OGC/HDS2
1
1
RE
02
1
1
RGN2
FILE
01
1
1
EXTERNAL: EG&G/BRYCE,J.H.
1
1
L ST LOBBY WARD
1
1
C
NRC PDR
1
1
1
1
C
C
TOTAL NUMBER OF COPIES REQUIRED: LTTR
31
ENCL
30
NOV 3 0 1990
Docket Nos. 50-269, 50-270, 50-287, 72-4
License Nos. DPR-38, DPR-47, DPR-55,
Duke Power Company
ATTN:
Mr. M. S. Tuckman, Vice President
Nuclear Operations
P. 0. Box 1007
Charlotte, NC 28201-1007
Gentlemen:
SUBJECT:
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE
(INSPECTION REPORT NOS. 50-269/90-24, 50-270/90-24, 50-287/90-24
AND 72-4/90-24)
This refers to the NRC's Systematic Assessment of Licensee Performance (SALP)
report for your Oconee facility which was sent to you on October 2, 1990; our
meeting of October 18, 1990 at which we discussed the report; and your written
comments dated November 19,
1990.
I have enclosed a summary of our
presentation at the meeting, a copy of your written comments, a copy of the
slides which were used at the presentation, and the Final SALP report for the
period February 1, 1989 through July 31, 1990.
We appreciate your efforts in evaluating the interim SALP report and providing,
comments, correctionsand clarifications.
The following is our evaluation of
your comments:
MAINTENENCE/SURVEILLANCE
In your response you discuss the improvements and upgrades made in this
area during this SALP period. We acknowledge that the four reactor trips
which occurred during the first half of the assessment period were a
factor in our evaluation of the performance rating.
However, since our
assessment covers the whole period we agree that appropriate recognition
should also
be given toward the Maintenance/Survei.1lance program
improvements that were made during the overall assiessment period.
Therefore, we have changed our SALP-performance rating An this area to a
Category 2 Improving. It is anticipated that continued'improvements-will
be reflected in the next SALP.
SAFETY ASSESSMENT/QUALITY VERIFICATION
Your response states that our SALP did not adequately reflect the
improvements that had been made in this area. We have incorporated y-ur
comments into our SALP Report.
However, we do not feel that these items
warrant a change in the performance rating for this area.
9012280279 901130
PDR ADOCK 05000269
G
Duke Power Company
2
In accordance with Section 2.790, a copy of this letter and its enclosures will
be placed in the NRC Public Document Room.
No reply to this letter is required; however, should you have any questions
concerning these matters, I will be pleased to discuss them with you.
Sincerely,
Stewart D. Ebneter
Regional Administrator
Enclosures:
1. Meeting Summary
2. Errata Sheet
3. SALP Slides
4. Duke Power Comments on SALP
cc w/encls:
H. B. Barron
Station Manager
Oconee Nuclear Station
P. 0. Box 1439
Seneca, SC 29679
A. V. Carr, Esq
Duke Power Company
422 South Church Street
Charlotte, NC 28242-0001
County Supervisor of Oconee County
Walhalla, SC 29621
Robert B. Borsum
Babcock and Wilcox Company
Nuclear Power Generation Division
Suite 525, 1700 Rockville Pike
Rockville, MD 20852
J. Michael McGarry, III, Esq.
Bishop, Cook, Purcell and Reynolds
1400 L Street, NW
Washington, D. C. 20005
Office of Intergovernmental Relations
116 West Jones Street
Raleigh, NC 27603
(cc w/encls cont'd -
see page 3)
Duke Power Company
3
N(V 3 0 1990
cc w/encls:
(Continued)
Heyward G. Shealy, Chief
Bureau of Radiological Health
South Carolina Department of Health
and Environmental Control
2600 Bull Street
Columbia, SC 29201
Manager, LIS
NUS Corporation
2650 McCormick Drive
Clearwater, FL 34619-1035
Stephen Benesole
Duke Power Company
P. 0. Box 1007
Charlotte, NC
28201-1007
R. L. Gill
Nuclear Production Department
Duke Power Company
P. 0. Box 1007
Charlotte, NC
28201-1007
Karen E. Long
Assistant Attorney General
N. C. Department of Justice
P. 0. Box 629
Raleigh, NC
27602
H. B. Tucker
Senior Vice President-Nuclear
Duke Power Company
P. 0. Box 1007
Charlotte, NC 28201-1007
State of South Carolina
bcc w/encls:
L. Wiens, NRR
W. Miller, RII
M. B. Shymlock, RII
A
. Herdt, RII
Vocument Control Desk
(bcc w/encls cont'd -
see page 4)
Duke Power Company
4
NOV 3 0 1990
bcc w/encls:
(Continued)
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 2, Box 610
Seneca, SC 29678
RI:. J
RII:DRP
RII:DRP RH
P RII:
DR
HQ:NRR
cek
WM
rser
MSh
lock
yes AGibson
WCie
D tthe
r
f
11
i/90
11//90
1190
117y/90
11/390
RII:DRP
HQ:NRR
- RA
PS
er
D=oo
JMilhoan
11
/90
/g9
11/
(90
Cp REG&
UNITED STATES
o
rNUCLEAR
REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, N.W.
ATLANTA, GEORGIA 30323
NOV 3 0 1990
Docket Nos. 50-269, 50-270, 50-287, 72-4
License Nos. DPR-38, DPR-47, DPR-55,
Duke Power Company
ATTN: Mr. M. S. Tuckman, Vice President
Nuclear Operations
P. 0. Box 1007
Charlotte, NC 28201-1007
Gentlemen:
SUBJECT:
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE
(INSPECTION REPORT NOS. 50-269/90-24, 50-270/90-24 AND 50-287/90-24
AND 72-4/90-24)
This refers to the NRC's Systematic Assessment of Licensee Performance (SALP)
report for your Oconee facility which was sent to you on October 2, 1990; our
meeting of October 18, 1990 at which we discussed the report; and your written
comments dated November 19,
1990.
I have enclosed a summary of our
presentation at the meeting, a copy of your written comments, a copy of the
slides which were used at the presentation, and the Final SALP report for the
period February 1, 1989 through July 31, 1990.
We appreciate your efforts in evaluating the interim SALP report and providing,
comments, corrections and clarifications.
The following is our evaluation of
your comments:
MAINTENENCE/SURVEILLANCE
In your response you discuss the improvements and upgrades made in this
area during this SALP period. We acknowledge that the four reactor trips
which occurred during the first half of the assessment period were-a
factor in our evaluation of the performance rating.
However, since our
assessment covers the whole period we agree that appropriat6-recognition
should also be given toward the Maintenance/Surveillance program
improvements that were made during the overall "assessment period.
Therefore, we have changed our SALP performance rating in thisri ea to a
Category 2 Improving. It is anticipated that continued improvements will
be reflected in the next SALP.
SAFETY ASSESSMENT/QUALITY VERIFICATION
Your response states that our SALP did not adequately reflect the
improvements that had been made in this area.
We have incorporated your
comments into our SALP Report.
However, we do not feel that these items
warrant a change in the performance rating for this area.
Duke Power Company
2
o 1990
In accordance with Section 2.790, a copy of this letter and its enclosures will
be placed in the NRC Public Document Room.
No reply to this letter is required; however, should you have any questions
concerning these matters, I will be pleased to discuss them with you.
Sincerely,
Stewart D. Ebneter
Regional Administrator
Enclosures:
1. Meeting Summary
2. Errata Sheet
3. SALP Slides
4. Duke Power Comments on SALP
cc w/encls:
H. B. Barron
Station Manager
Oconee Nuclear Station
P. 0. Box 1439
Seneca, SC 29679
A. V. Carr, Esq
Duke Power Company
422 South Church Street
Charlotte, NC 28242-0001
County Supervisor of Oconee County
Walhalla, SC 29621
Robert B. Borsum
Babcock and Wilcox Company
Nuclear Power Generation Division
Suite 525, 1700 Rockville Pike
Rockville, MD 20852
J. Michael McGarry, III, Esq.
Bishop, Cook, Purcell and Reynolds
1400 L Street, NW
Washington, D. C. 20005
Office of Intergovernmental Relations
116 West Jones Street
Raleigh, NC 27603
(cc w/encls cont'd -
see page 3)
Duke Power Company
3
NOV 3 0 990
cc w/encls:
(Continued)
Heyward G. Shealy, Chief
Bureau of Radiological Health
South Carolina Department of Health
and Environmental Control
2600 Bull Street
Columbia, SC 29201
Manager, LIS
NUS Corporation
2650 McCormick Drive
Clearwater, FL
34619-1035
Stephen Benesole
Duke Power Company
P. 0. Box 1007
Charlotte, NC
28201-1007
R. L. Gill
Nuclear Production Department
Duke Power Company
P. 0. Box 1007
Charlotte, NC 28201-1007
Karen E. Long
Assistant Attorney General
N. C. Department of Justice
P. 0. Box 629
Raleigh, NC 27602
H. B. Tucker
Senior Vice President-Nuclear
Duke Power Company
P. 0. Box 1007
Charlotte, NC 28201-1007
State of South Carolina
ENCLOSURE 1
MEETING SUMMARY
A. A meeting was held at 10:00 a.m.,
on October 18,
1990, at the Oconee
Nuclear Station near Seneca,
South Carolina to discuss the SALP Board
Report for the Oconee facility.
B. Licensee Attendees
W. Owen, Executive Vice President, Duke Power Company
H. Tucker, Vice President, Nuclear Production
M. Tuckman, General Manager, Nuclear Support
R. Hollins, Division Manager, CMDS Division
B. Peele, Project Manager
B. Barron, Station Manager, Oconee Station
T. Curtis, Compliance Manager
J. Davis, Technical Services Support
D. Deatherage, Operations Manager
B. Dolan, Design Engineering Manager
W. Foster, Maintenance Support
G. Grier, Manager, Quality Assurance
G. Little, Instrument and Electrical Manager
H. Lowery, Chairman, Oconee Safety Review Group
D. Powell, Station Services Superintendent
G. Rothenberger, Superintendent Integrated Scheduling
R. Sweigart, Operations Superintendent
The list of licensee attendees above does not include all the Duke Power
Company employees that were present at the SALP presentation.
The
attendees also included superintendents, supervisors and other Duke
employees.
This large turnout was beneficial to the SALP process and is
highly recommended for future presentations.
C. NRC Attendees
J. Milhoan, Deputy Regional Administrator, Region-II (R11)
L. Reyes, Director, Division of Reactor Projects,Ma(DRP),
Region II (Chairperson)
P. Skinner, Senior Resident Inspector, Oconee, DRP, Ru
L. Wiens, Project Manager, Projector Directorate 11-3, Nuclear
Reactor Regulation (NRR)
M. Shymlock, Chief, Project Section 3A, DRP, Rh