ML16138A704

From kanterella
Jump to navigation Jump to search
Amends 183,183 & 180 to Licenses DPR-38,DPR-47 & DPR-55, Respectively,Revising Tech Spec 3.4.4 to Raise Min Upper Surge Tank Level from 5 Ft to 6 Ft & to Include Allowance for Instrument Error
ML16138A704
Person / Time
Site: Oconee  
Issue date: 04/25/1990
From: Matthews D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML16138A705 List:
References
NUDOCS 9005140137
Download: ML16138A704 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO.

50-269 OCONEE NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

183 License No. DPR-38

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment to the Oconee Nuclear Station, Unit 1 (the facility) Facility Operating License No. DPR-38 filed by the Duke Power Company (the licensee) dated August 14, 1987, as supplemented April 22, 1988 and January 23, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied.

2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B. of Facility Operating License No. DPR-38 is hereby amended to read as follows:

905140137 900425 PDR ADOCK 05000269 P

PDC

-2 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 183, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects -

I/II Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance:

April 25, 1990

0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-270 OCONEE NUCLEAR STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 183 License No. DPR-47

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment to the Oconee Nuclear Station, Unit 2 (the facility) Facility Operating License No. DPR-47 filed by the Duke Power Company (the licensee) dated August 14, 1987, as supplemented April 22, 1988, and January 23, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied.

2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 3.B. of Facility Operating License No. DPR-47 is hereby amended to read as follows:

-2 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 183, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION b-David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects -

I/II Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance:

April 25, 1990

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-287 OCONEE NUCLEAR STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

180 License No. DPR-55

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment to the Oconee Nuclear Station, Unit 3 (the facility) Facility Operating License No. DPR-55 filed by the Duke Power Company (the licensee) dated August 14, 1987, as supplemented April 22, 1988, and January 23, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied.

2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 3.B. of Facility Operating License No. DPR-55 is hereby amended to read as follows:

-2 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.180, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION David B. Matfkews, Director Project Directorate 11-3 Division of Reactor Projects -

I/Il Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance:

April 25, 1990

ATTACHMENT TO LICENSE AMENDMENT NO.

183; FACILITY OPERATING LICENSE NO.

DPR-38 DOCKET NO.

50-269 AND TO LICENSE AMENDMENT NO.

183 FACILITY OPEPATING LICENSE NO. DPR-47 DOCKET NO. 50-270 AND TO LICENSE AMENDMENT NO. 180 FACILITY OPERATING LICENSE NO.

DPR-55 DOCKET NO. 50-287 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment nunter and contain vertical lines indicating the areas of change.

Remove Pages Insert Pages 3.4-2 3.4-2 3.4-3 3.4-3 3.4-4 3.4-4

3.4.3 The 16 main safety relief valves shall be operable.

3.4.4 A minimum of 72,000 gallons of water per operating unit shall be available in the upper surge tank, condensate storage tank, and hot well. A minimum of 6 ft. (= 30,000 Gal.) shall be available in the upper surge tank.

3.4.5 Emergency Condenser Cooling Water (ECCW) System

a.

The RCS shall not be heated above 250'F unless the ECCW System is operable.

b.

If the ECCW System becomes inoperable during operation above 250'F, and the system is not restored to operable status in seven days, then the unit shall be brought to hot shutdown within an additional 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and below 250oF in another 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

3.4.6 The controls of the emergency feedwater system shall be independent of the Integrated Control System.

OCONEE -

UNITS 1, 2 & 3 3.4-2 Amendment No. 183 (Unit 1)

Amendment No. 183 (Unit 2)

Amendment No. 180 (Unit 3)

Bases The Main Feedwater System and the Turbine Bypass System are normally used.for decay heat removal and cooldown above 250oF. Feedwater makeup is supplied by operation of a hotwell pump, condensate booster pump, and a main feedwater pump.

Operability of the Emergency Feedwater System (EFW) assures the capability to remove decay heat and cool down the Reactor Coolant System to the operating conditions for switch over to decay heat removal by the Decay Heat Removal System, in the event that the Main Feedwater System is inoperable. The EFW system consists of a turbine driven pump (880 gpm), two motor driven pumps (450 gpm each), and associated flow paths to the steam generators.

The decay heat and the reactor coolant pump heat following a reactor trip from 102% power, and the EFW flow rate (90'F feedwater) required to remove this heat demand are as follows:

EFW Flow Required Heat Source to Match Heat Source Time

(% of 2619 MWT)

(gpm) 2 min 5.031 797 5 min 3.46 548 10 min 3.06 485 30 min 2.49 395 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 2.15 341 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 1.89 299 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 1.74 276 The limiting transient requiring maximum EFW flow is the loss of main feed water with offsite power available. For this transient, a minimum EFW flow rate equivalent to 405 gpm at 1050 psig is adequate. Each of the three EFW pumps is capable of delivering this flow.

A 100% flowpath is defined as:

The flowpath to either steam generator including associated valves and piping capable of being supplied by either the turbine driven pump or the associated motor driven pump.

One flow indicator or steam generator level indicator per steam generator is sufficient to provide indication of emergency feedwater flow to the steam generators and to confirm emergency feedwater system operation. In the event that at least one indicator per steam generator is not available, then the flowpath to this steam generator is considered to be inoperable.

The EFW System is designed to start automatically in the event of loss of both main feedwater pumps or low main feedwater header pressure. All automatic initiation logic and control functions are independent from the Integrated Control System (ICS).

Normally, decay heatis removed by steam relief through the turbine bypass system to the condenser. Condenser cooling water flow is provided by a siphon effect from Lake Keowee through the condenser for final heat rejection to the Keowee Hydro Plant tailrace. Decay heat removal via recirculation flowpath OCONEE - UNITS 1, 2 & 3 3.4-3 Amendment No.

183 (Unit 1)

Amendment No.

183 (Unit 2)

Amendment No.

180 (Unit 3)

may be maintained for up to 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> per unit, assuming the minimum amount of water in the upper surge tanks, condensate storage tank, and hotwell is available. This is based on the conservative estimate of normal makeup being 0.5% of throttle flow. Throttle flow at full load, 11,200,000 lbs/hr., was used to calculate the operation time.

For decay heat removal the operation time with the volume of water specified would be considerably increased due to the reduced throttle flow.

Decay heat can also be removed from the steam generators by steam relief through the main steam safety relief valves. The total relief capacity of the 16 main steam safety relief valves is 13,105,000 lbs/hr.

In this case the minimum amount of water in the upper surge tank, condensate storage tank, and hotwell is sufficient to remove decay heat and reactor coolant pump heat for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> per unit at hot shutdown conditions.

A 6 foot level in the upper surge tank will ensure that 30,000 gallons of water are available to the EFW pumps from that source.

The 6 foot level set point includes an allowance for instrument error and for the depletion of inventory while switching to an alternate suction source.

REFERENCE FSAR, Section 10.

OCONEE - UNITS 1, 2 & 3 3.4-4 Amendment No. 183 (Unit 1)

Amendment No. 183 (Unit 2)

Amendment No. 180 (Unit 3)