ATTACHMENT 3-7B MANUAL ACTIONS REQUIRED FOR HOT SHUTDOWN IN APPENDIX R III.G.3 FIRE AREAS/ZONES (NOTE 1)
SHEET 1 Rev. 27 (1)
Condition which requires action (Equipment Failure)
(2)
Applicabl e Fire Areas /
Zones System /
Function (3)
Action Required (Note 2)
(4)
Fire Area / Zone of Action Location (Description)
(5)
Time Requirement (6)
Time Requirement Basis (7)
Emergency Light(s)
Comments Fire in control room or relay room CB-FA-3d CB-FA-4b
TRIP Reactor
TRIP Main Turbine
TRIP all RC Pumps
CLOSE RC-V-2
CLOSE MS-V-8A and MS-V-8B
OPEN MU-V-14A and MU-V-14B CB-FA-4b (Main Control Room) 150 seconds after detection ECR 09-00527 TECH EVAL 817422-12 None Control Room has redundant AC & DC fixed lighting.
Exemption letter 5211-86-3333.
Fire affects SSD equipment in ESAS room.
CB-FA-3c
TRIP Reactor
TRIP Main Turbine
CLOSE MS-V-8B
OPEN MU-V-14A and MU-V-14B CB-FA-4b (Main Control Room) 150 seconds after detection ECR 08-01051 TECH EVAL 817422-12 None Control Room has redundant AC & DC fixed lighting.
Exemption letter 5211-86-3333.
Fire affects SSD equipment in ESAS room CB-FA-3c Relay Room CO2 system Open CT-5 Switch 32 at 1A ES MCC Unit 8A.
CB-FA-2a (1P SWGR Room) 150 seconds after detection ECR 08-01051 TECH EVAL 817422-12 EL-L-76 SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b
TRIP both Main FW Pumps
TRIP CO-P-2A/B/C
TRIP CO-P-1A/B/C
PRESS MS-V-13A & B OPEN PB
CLOSE EF-V-30A & C CLOSED in MANUAL
PLACE EF-V-30B & D in MANUAL between 15 and 25%
OPEN CB-FA-4b (Main Control Room) 75 seconds ECR 09-00527 86-9101191-001 None Control Room has redundant AC & DC fixed lighting.
Exemption letter 5211-86-3333.
SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b RCS Heat Removal MS switch placed in emergency
[MS-V-4B goes CLOSED]
CB-FA-2b (RSTSP B) 165 seconds ECR 09-00527 86-9101191-001 EL-L-78 Fire affects SSD equipment in ESAS room.
CB-FA-3c RSTSP B switches placed in emergency MS DC DR MU 1B ES SH 1T SWGR IC CB-FA-2b (RSTSP B) 300 seconds ECR 08-01051 86-9101191-001 EL-L-78 SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b EFW ALL RSTSP B switches placed in emergency
[EF-V-30B & D go to 25% OPEN]
CB-FA-2b (RSTSP B) 225 seconds ECR 09-00527 86-9101191-001 EL-L-78 EF-V-30B & D controls on RSD panel are pre-set to 25% open.
SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b ALL RSTSP A switches placed in emergency CB-FA-3c (RSTSP A) 315 seconds ECR 09-00527 86-9101191-001 EL-L-74 SCBA required to access ESAS, 1D 4160V or 1E 4160V room.
SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b RCS Inventory ENSURE MU-V-3 is CLOSED CB-FA-2c (RSP-A) 6.5 minutes ECR 09-00527 86-9101191-001 LOOP & no LOOP cases EL-L-79C
ATTACHMENT 3-7B MANUAL ACTIONS REQUIRED FOR HOT SHUTDOWN IN APPENDIX R III.G.3 FIRE AREAS/ZONES (NOTE 1)
SHEET 1 Rev. 27 (1)
Condition which requires action (Equipment Failure)
(2)
Applicabl e Fire Areas /
Zones System /
Function (3)
Action Required (Note 2)
(4)
Fire Area / Zone of Action Location (Description)
(5)
Time Requirement (6)
Time Requirement Basis (7)
Emergency Light(s)
Comments Fire in control room or relay room CB-FA-3d CB-FA-4b
TRIP Reactor
TRIP Main Turbine
TRIP all RC Pumps
CLOSE RC-V-2
CLOSE MS-V-8A and MS-V-8B
OPEN MU-V-14A and MU-V-14B CB-FA-4b (Main Control Room) 150 seconds after detection ECR 09-00527 TECH EVAL 817422-12 None Control Room has redundant AC & DC fixed lighting.
Exemption letter 5211-86-3333.
Fire affects SSD equipment in ESAS room.
CB-FA-3c
TRIP Reactor
TRIP Main Turbine
CLOSE MS-V-8B
OPEN MU-V-14A and MU-V-14B CB-FA-4b (Main Control Room) 150 seconds after detection ECR 08-01051 TECH EVAL 817422-12 None Control Room has redundant AC & DC fixed lighting.
Exemption letter 5211-86-3333.
Fire affects SSD equipment in ESAS room CB-FA-3c Relay Room CO2 system Open CT-5 Switch 32 at 1A ES MCC Unit 8A.
CB-FA-2a (1P SWGR Room) 150 seconds after detection ECR 08-01051 TECH EVAL 817422-12 EL-L-76 SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b
TRIP both Main FW Pumps
TRIP CO-P-2A/B/C
TRIP CO-P-1A/B/C
PRESS MS-V-13A & B OPEN PB
CLOSE EF-V-30A & C CLOSED in MANUAL
PLACE EF-V-30B & D in MANUAL between 15 and 25%
OPEN CB-FA-4b (Main Control Room) 75 seconds ECR 09-00527 86-9101191-001 None Control Room has redundant AC & DC fixed lighting.
Exemption letter 5211-86-3333.
SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b RCS Heat Removal MS switch placed in emergency
[MS-V-4B goes CLOSED]
CB-FA-2b (RSTSP B) 165 seconds ECR 09-00527 86-9101191-001 EL-L-78 Fire affects SSD equipment in ESAS room.
CB-FA-3c RSTSP B switches placed in emergency MS DC DR MU 1B ES SH 1T SWGR IC CB-FA-2b (RSTSP B) 300 seconds ECR 08-01051 86-9101191-001 EL-L-78 SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b EFW ALL RSTSP B switches placed in emergency
[EF-V-30B & D go to 25% OPEN]
CB-FA-2b (RSTSP B) 225 seconds ECR 09-00527 86-9101191-001 EL-L-78 EF-V-30B & D controls on RSD panel are pre-set to 25% open.
SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b ALL RSTSP A switches placed in emergency CB-FA-3c (RSTSP A) 315 seconds ECR 09-00527 86-9101191-001 EL-L-74 SCBA required to access ESAS, 1D 4160V or 1E 4160V room.
SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b RCS Inventory ENSURE MU-V-3 is CLOSED CB-FA-2c (RSP-A) 6.5 minutes ECR 09-00527 86-9101191-001 LOOP & no LOOP cases EL-L-79C
ATTACHMENT 3-7B MANUAL ACTIONS REQUIRED FOR HOT SHUTDOWN IN APPENDIX R III.G.3 FIRE AREAS/ZONES (NOTE 1)
SHEET 2 Rev. 27 (1)
Condition which requires action (Equipment Failure)
(2)
Applicabl e Fire Areas /
Zones System /
Function (3)
Action Required (Note 2)
(4)
Fire Area / Zone of Action Location (Description)
(5)
Time Requirement (6)
Time Requirement Basis (7)
Emergency Light(s)
Comments SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b RCS Heat Removal ADJUST EFW Flow (EF-V-30s) and OTSG pressure (MS-V-4A/B) to ensure natural circulation, to stabilize core temperature, and maintain RCS heat removal.
CB-FA-2c (RSP-A & RSP-B) 8.5 minutes ECR 09-00527 86-9101191-001 EL-L-79C (RSP-A)
EL-L-79B (RSP-B)
MS-V-8B spuriously fails OPEN (hot short) AND MS-V-3D, E, or F have failed to 50% open CB-FA-3c RCS heat removal Isolate Main & Emergency FW to OTSG B.
TRIP FW-P-1A and FW-P-1B or CLOSE FW-V-5B and FW-V-92B AND CLOSE EF-V-30B and EF-V-30C CB-FA-4b (Main Control Room) 3 minutes ECR 08-01051 None Control Room has redundant AC & DC fixed lighting.
Exemption letter 5211-86-3333.
SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b Electrical Distribution Place the following 1E 4160V RSD Transfer switches in EMERG and ENSURE (BKR position):
UNIT 1, 1SB-E2 (See NOTE)
UNIT 2, T1-E2 (open)
UNIT 3, EG-Y-1B Controls (no BKR)
UNIT 5, EF-P-2B (closed)
UNIT 6, S1-02 (closed)
UNIT 7, DH-P-1B (open)
UNIT 10, BS-P-1B, BYPASS, (open)
UNIT 11, RR-P-1B (open)
UNIT 12, T1-02 (closed)
UNIT 14, 1SA-E2 (see NOTE)
UNIT 3, G11-02 (see NOTE)
NOTE: If 1SA-E2 and 1SB-E2 are open, then start EG-Y-1B: If 1E 4160V is energized and 1SA-E2 or 1SB-E2 are closed, then ensure G11-02 is open.
CB-FA-3b (1E SWGR Room) 12 minutes ECR 09-00527 86-9101191-001 EL-L-25A For CB-FA-3d, SCBA required to access ESAS, 1D 4160V or 1E 4160V room.
Offsite power was lost and EG-Y-1B did not re-energize 1E 4160V bus automatically.
CB-FA-3d CB-FA-4b Electrical Distribution
START EG-Y-1B at Control Panel
CLOSE G11-02 (UNIT 3)
CB-FA-3b (1E SWGR Room) 12 minutes ECR 09-00527 86-9101191-001 EL-L-25A SCBA required to access ESAS, 1D 4160V or 1E 4160V room.
Offsite power was lost and EG-Y-1B did not re-energize 1E 4160V bus automatically.
CB-FA-3d CB-FA-4b Electrical Distribution
ENSURE 1S-02 CLOSED [1S BUS 480V feeder from 1E Bus]
ENSURE 1C ESV MCC ATS is lined up to 1S 480V Bus
ENSURE 1S-1C CLOSED [1B ES MCC feeder breaker from 1S Bus]
CB-FA-2b (1S SWGR Room)
CB-FA-2c (RSD Area) 14 minutes ECR 09-00527 86-9101191-001 EL-L-78A EL-L-68 These breakers may have been opened by fire (controls located in Control Room)
ATTACHMENT 3-7B MANUAL ACTIONS REQUIRED FOR HOT SHUTDOWN IN APPENDIX R III.G.3 FIRE AREAS/ZONES (NOTE 1)
SHEET 3 Rev. 27 (1)
Condition which requires action (Equipment Failure)
(2)
Applicabl e Fire Areas /
Zones System /
Function (3)
Action Required (Note 2)
(4)
Fire Area / Zone of Action Location (Description)
(5)
Time Requirement (6)
Time Requirement Basis (7)
Emergency Light(s)
Comments Fire affects SSD equipment in ESAS room AND relay room CO2 system disabled.
CB-FA-3c Electrical Distribution Place the following 1E 4160V RSD Transfer switches in EMERG and ENSURE (BKR position):
UNIT 1, 1SB-E2 (See NOTE)
UNIT 2, T1-E2 (open)
UNIT 3, EG-Y-1B Controls (no BKR)
UNIT 6, S1-02 (closed)
UNIT 12, T1-02 (closed)
UNIT 14, 1SA-E2 (see NOTE)
UNIT 3, G11-02 (see NOTE)
NOTE: If 1SA-E2 and 1SB-E2 are open, then start EG-Y-1B: If 1E 4160V is energized and 1SA-E2 or 1SB-E2 are closed, then ensure G11-02 is open.
CB-FA-3b (1E SWGR Room) 16 minutes ECR 08-01051 86-9101191-001 EL-L-25A SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b RCS Inventory
START DC-P-1B
OPEN MU-V-36 and 37 or OPEN MU-V-16C or OPEN MU-V-16D
VERIFY MU-P-3C is operating
START MU-P-1C
Throttle OPEN MU-V-16C or MU-V-16D to maintain Pressurizer level
CLOSE MU-V-18 CB-FA-2c (RSP-B) 16 minutes ECR 09-00527 86-9101191-001 EL-L-79B SRO determination that control room evacuation is required.
CB-FA-3d CB-FA-4b RCS Heat Removal CLOSE MS-V-8A and MS-V-8B CB-FA-2c (RSP-B) 16.5 minutes ECR 09-00527 86-9101191-001 EL-L-79B Offsite power was lost and EG-Y-1B did not re-energize 1E 4160V bus automatically.
CB-FA-3c Electrical Distribution
START EG-Y-1B at Control Panel
CLOSE G11-02 (UNIT 3)
CB-FA-3b (1E SWGR Room) 16 minutes ECR 08-01051 NOTE 3 EL-L-25A Offsite power was lost and EG-Y-1B did not re-energize 1E 4160V bus automatically.
CB-FA-3c Electrical Distribution
ENSURE 1S-02 CLOSED [1S BUS 480V feeder from 1E Bus]
ENSURE 1C ESV MCC ATS is lined up to 1S 480V Bus
ENSURE 1S-1C CLOSED [1B ES MCC feeder breaker from 1S Bus]
CB-FA-2b (1S SWGR Room)
CB-FA-2c (RSD Area) 20 minutes ECR 09-00527 86-9101191-001 NOTE 3 EL-L-78A EL-L-68 These breakers may have been opened by fire (controls located in Control Room)
EF-V-30A fails open (hot short)
CB-FA-3c RCS heat removal Local CLOSE EF-V-30A IB-FZ-3 20 minutes ECR 09-00527 86-9101191-001 NOTE 3 EL-L-8 MS-V-4A fails open (hot short)
CB-FA-3c RCS heat removal Locally close or throttle MS-V-4A to control OTSG pressure IB-FZ-3 20 minutes ECR 09-00527 86-9101191-001 NOTE 3 EL-L-84A
ATTACHMENT 3-7B MANUAL ACTIONS REQUIRED FOR HOT SHUTDOWN IN APPENDIX R III.G.3 FIRE AREAS/ZONES (NOTE 1)
SHEET 4 Rev. 27 (1)
Condition which requires action (Equipment Failure)
(2)
Applicabl e Fire Areas /
Zones System /
Function (3)
Action Required (Note 2)
(4)
Fire Area / Zone of Action Location (Description)
(5)
Time Requirement (6)
Time Requirement Basis (7)
Emergency Light(s)
Comments EF-V-30C fails open (hot short)
CB-FA-3c RCS heat removal Locally CLOSE EF-V-30C IB-FZ-3 20 minutes ECR 09-00527 86-9101191-001 NOTE 3 EL-L-83 Fire affects SSD equipment in ESAS room.
CB-FA-3c RCS Inventory
START DC-P-1B
OPEN MU-V-36 and 37 or OPEN MU-V-16C or OPEN MU-V-16D
VERIFY MU-P-3C is operating
START MU-P-1C
Throttle OPEN MU-V-16C or MU-V-16D to maintain Pressurizer level
CLOSE MU-V-18 CB-FA-2c (RSP-B) 30 minutes ECR 09-00527 86-9101191-001 NOTE 3 EL-L-79B SRO determination that control room evacuation is required.
Fire affects SSD equipment in ESAS room (Inadvertent HPI Actuation)
CB-FA-3d CB-FA-4b CB-FA-3c RCS Pressure Control Terminate Train A HPI Flow
ENSURE MU-P-1A & MU-P-1B are shutdown OR
OPEN Breakers for MU-V-16A &
B
LOCALLY CLOSE MU-V-16A & B CB-FA-3a (1D SWGR Room)
AB-FZ-6 (1A ESV MCC)
AB-FZ-4 (281 AB on mezzanine) 41 minutes ECR 09-00527 86-9101191-001 EL-L-312 EL-L-95 EL-L-293 MU-V-16A and B must be closed locally if seal injection has been maintained.
SRO determination that control room evacuation is required.
or Fire affects SSD equipment in ESAS room (ES Actuation and Loss of Train A ES Power)
CB-FA-3d CB-FA-4b CB-FA-3c RCS Inventory Control Locally OPEN MU-V-36 AB-FZ-3 (MU valve Alley) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ECR 09-00527 86-9101191-001 EL-L-89A/B SRO determination that control room evacuation is required or Fire affects SSD equipment in ESAS room (MU-V-20 spurious closure due to hot short)
CB-FA-3c CB-FA-3d CB-FA-4b RCP Seal Injection OPEN MU-V-20 CB-FA-2c (RSP-B) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Tech Eval. 14-00408 EL-L-79B SRO determination that control room evacuation is required or Fire affects SSD equipment in ESAS room (MU-P-1B is not operating)
CB-FA-3c CB-FA-3d CB-FA-4b RCP Seal Injection OPEN MU-V-76A and MU-V-76B AB-FZ-3 (MU valve alley) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Tech Eval. 14-00408 EL-L-89B
ATTACHMENT 3-7B MANUAL ACTIONS REQUIRED FOR HOT SHUTDOWN IN APPENDIX R III.G.3 FIRE AREAS/ZONES (NOTE 1)
SHEET 5 Rev. 27 (1)
Condition which requires action (Equipment Failure)
(2)
Applicabl e Fire Areas /
Zones System /
Function (3)
Action Required (Note 2)
(4)
Fire Area / Zone of Action Location (Description)
(5)
Time Requirement (6)
Time Requirement Basis (7)
Emergency Light(s)
Comments SRO determination that control room evacuation is required.
(Loss of automatic control of MU-V-32)
CB-FA-3d CB-FA-4b RCP Seal Injection CLOSE MU-V-89A and THROTTLE MU-V-90 to establish adequate SI Flow AB-FZ-3 (MU valve alley) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Tech Eval. 14-00408 EL-L-89B SRO determination that control room evacuation is required.
(Spurious opening of CO-V-7 & 8)
CB-FA-3d CB-FA-4b EFW LOCALLY CLOSE CO-V-8 and CO-V-108 TB-FA-1 (305 west of hotwell) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ECR 07-00702 NOTE 5 EL-L-328 EG-Y-1B is operating (EG-Y-1B Ventilation)
CB-FA-3d CB-FA-4b Electrical Distribution OPEN the following doors:
SB157
D101
SB-145
SB-147 DG-FA-2 (EG-Y-1B room) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> UFSAR Section 9.8.7.5 EL-L-226 EL-L-105D EL-L-85 Train A Building Spray has actuated.
CB-FA-3d CB-FA-4b RCS Inventory PLACE BS-P-1A CONTROL at 1D 4160V SWGR in BYPASS and TRIP breaker.
CB-FA-3a (1D SWGR Room) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Tech Eval 352410-33 NOTE 4 EL-L-312 SCBA required to access ESAS
& 1D 4160V SWGR room.
SRO determination that control room evacuation is required.
or Fire affects SSD equipment in ESAS room CB-FA-3d CB-FA-4b CB-FA-3c Component Cooling
ENSURE 1T-02 CLOSED
ENSURE 1T-4C CLOSED
START DR-P-1B
OPEN DR-V-1B CB-FA-2c (RSP-B) 2 Hour ECR 09-00527 EL-L-79B SRO determination that control room evacuation is required.
Fire affects SSD equipment in ESAS room.
(Loss of control of PZR heaters)
CB-FA-3d CB-FA-4b CB-FA-3c RCS Pressure Control
- 1) Establish control of PZR HTR GRP 9 from 1S 480V SWGR
CB-FA-2b (1S 480V SWGR) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> UFSAR 8.2.3.5 EL-L-82 EL-L-14 SRO determination that control room evacuation is required.
(Instrument Air)
CB-FA-3d CB-FA-4b Instrument Air PLACE IA-P-1B RSD switch in EMERG and ENSURE IA-P-1B is operating CB-FA-2b (1B ES MCC) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> UFSAR 9.10.3 EL-L-78A Loss of 1A, 1C and 1E battery chargers CB-FA-3d CB-FA-4b CB-FA-3c Electrical Distribution CROSS TIE DC train A and B to maintain a power supply to ATB, VBA
& VBC CB-FA-2d (A Inverter Room)
CB-FA-2e (B Inverter Room)
CB-FA-2f (A Battery Room)
CB-FA-2g (B Battery Room) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> UFSAR 8.2.2.6 EL-L-80A EL-L-80B
ATTACHMENT 3-7B MANUAL ACTIONS REQUIRED FOR HOT SHUTDOWN IN APPENDIX R III.G.3 FIRE AREAS/ZONES (NOTE 1)
SHEET 6 Rev. 27 (1)
Condition which requires action (Equipment Failure)
(2)
Applicabl e Fire Areas /
Zones System /
Function (3)
Action Required (Note 2)
(4)
Fire Area / Zone of Action Location (Description)
(5)
Time Requirement (6)
Time Requirement Basis (7)
Emergency Light(s)
Comments CO-V-8 and CO-V-108 are closed.
(Spurious opening of CO-V-7 & 8)
CB-FA-3d CB-FA-4b EFW ENSURE VA-P-1A, B and C are shutdown TB-FA-1 (Turbine Bldg) 160 minutes ECR 09-00527 ECR 07-00702 EL-L-72C EL-L-72D Loss of ISPH Ventilation &
Component Cooling CB-FA-3d CB-FA-4b CB-FA-3c ISPH Ventilation Establish portable ventilation capable of maintaining ISPH temperature below 120°F ISPH-FZ-1 (1R SWGR Area)
ISPH-FZ-2 (1T SWGR Area) 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> UFSAR Section 9.8.8.5 EL-L-20 EL-L-35 Confirmation of fire in ESAS room CB-FA-3c EFW Place 1E 4160V SWGR Unit 5 in RSD control and ensure breaker is closed (EF-P-2B is operating).
CB-FA-3b (1E SWGR Room) 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ECR 08-01051 EL-L-25A
ATTACHMENT 3-7B MANUAL ACTIONS REQUIRED FOR HOT SHUTDOWN IN APPENDIX R III.G.3 FIRE AREAS/ZONES (NOTE 1)
SHEET 7 Rev. 27 Column Heading Notes:
(1) Condition which requires action (Equipment Failure):
This is the condition that requires compensatory action to achieve safe shutdown. Some actions are performed based on an observed equipment failure but some are proactive.
Proactive actions are performed based on the condition described. The reason for the action (potential equipment failure) may be identified in parentheses.
(2) Applicable Fire Areas / Zones:
List all of the fire zones where this manual action (item 3) is required for a successful safe shutdown strategy.
(3) Action Required:
This is a single action or group of actions, which are performed together if the condition exists. For example, cross tie DC buses is a single line item because these steps would be done together for a single common purpose.
(4) Fire Area/Zone of Action Location (Description):
List the Fire Areas (or Zones) where the actions are performed. A more detailed description may be identified in parentheses.
(5) Time Requirement:
Describes the maximum acceptable time for completion of the action. The starting time is the condition in column (1) unless otherwise noted.
(6) Time Requirement Basis:
References the technical basis or document for the time requirement.
(7) Emergency Light(s):
The lights required at the location where the action is required are identified. Pathway lighting to a component is not included.
NOTES:
(1) The table includes action taken inside and outside of the control room. No exemptions are required for these actions.
(2) For all MOVs, it is assumed that the breaker for the locally operated valve will be opened prior to valve operation. This is part of the required manual action.
(3) Control Room Evacuation Analysis 86-9101191-001 provides the basis for the action time. This time has additional conservatism because the analysis is based on RCS inventory loss rate with Westinghouse RCP seals.
(4) Technical Evaluation 352410-33 provides the basis for the action time. This time has additional conservatism because the analysis is based on RCS inventory loss rate with Westinghouse RCP Seals.
(5) ECR 07-00702 provides the basis for the action time. This time has significant conservatism because CO-V-111A is now normally closed.