UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
April 19, 2016
Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362-9637
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - EVALUATIONS OF CHANGES,
TESTS, AND EXPERIMENTS AND PERMANENT PLANT MODIFICATIONS
BASELINE INSPECTION REPORT 05000263/2016008
Dear Mr. Gardner:
On March 24, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an Evaluations
of Changes, Tests, and Experiments and Permanent Plant Modifications inspection at your
Monticello Nuclear Generating Plant. The enclosed inspection report documents the inspection
results which were discussed on March 24, 2016, with Mr. M. Lingenfelter and other members
of your staff.
The inspection examined activities conducted under your license as they relate to safety and
compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel.
No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
Enclosure:
cc: Distribution via LISTSERV
U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Docket No: 50-263
License No: DPR-22
Report No: 05000263/2016008
Licensee: Northern States Power Company, Minnesota
Facility: Monticello Nuclear Generating Plant
Location: Monticello, MN
Dates: February 29 thru March 24, 2016
Inspectors: Alan Dahbur, Senior Reactor Inspector (Lead)
Jorge J. Corujo-Sandín, Reactor Inspector
Michael A. Jones, Reactor Inspector
Approved by: Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Enclosure
SUMMARY
Inspection Report 05000263/2016008; 02/29/2016 - 03/24/2016; Monticello Nuclear Generating
Plant; Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications.
This report covers a 2-week announced baseline inspection on evaluations of changes,
tests, and experiments and permanent plant modifications. The inspection was conducted
by Region III based engineering inspectors. The U.S. Nuclear Regulatory Commissions
program for overseeing the safe operation of commercial nuclear power reactors is described
in NUREG-1649, Reactor Oversight Process, Revision 5, dated February 2014.
NRC-Identified and Self-Revealed Findings
No findings were identified.
Licensee-Identified Violations
No violations were identified.
2
REPORT DETAILS
1. REACTOR SAFETY
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
1R17 Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
(71111.17T)
.1 Evaluation of Changes, Tests, and Experiments
a. Inspection Scope
The inspectors reviewed 7 safety evaluations performed pursuant to Title 10, Code of
Federal Regulations (CFR), Part 50, Section 59, to determine if the evaluations were
adequate, and that prior U.S. Nuclear Regulatory Commission (NRC) approval was
obtained as appropriate. The inspectors also reviewed 16 screenings where licensee
personnel had determined that a 10 CFR 50.59 evaluation was not necessary. The
inspectors reviewed these documents to determine if:
the changes, tests, and experiments performed were evaluated in accordance
with 10 CFR 50.59 and that sufficient documentation existed to confirm that a
license amendment was not required;
the safety issue requiring the change, tests or experiment was resolved;
the licensee conclusions for evaluations of changes, tests, and experiments were
correct and consistent with 10 CFR 50.59; and
the design and licensing basis documentation was updated to reflect the change.
The inspectors used, in part, Nuclear Energy Institute Document 96-07, Guidelines for
10 CFR 50.59 Implementation, Revision 1, to determine acceptability of the completed
evaluations, and screenings. The Nuclear Energy Institute document was endorsed by
the NRC in Regulatory Guide 1.187, Guidance for Implementation of 10 CFR 50.59,
Changes, Tests, and Experiments, dated November 2000. The inspectors also
consulted Part 9900 of the NRC Inspection Manual, 10 CFR Guidance for
10 CFR 50.59, Changes, Tests, and Experiments.
This inspection constituted 4 samples of evaluations and 13 samples of screenings
and/or applicability determinations as defined in Inspection Procedure 71111.17-04.
b. Findings
(Open) Unresolved Item 05000263/2016008-01, Failure to provide acceptable Alternate
Methods of Decay Heat Removal
Introduction: The inspectors identified an Unresolved Item associated with Technical
Specification (TS) 3.4.8, Residual Heat Removal (RHR) Shutdown Cooling System -
Cold Shutdown. Specifically, the licensee failed to verify that the capability of the
alternate methods of decay heat removal described in Operations Manual C.4-B.03.04.A,
Loss of Normal Shutdown Cooling, were adequate to combat a loss of shutdown cooling
resulting from the loss of one or two RHR subsystems while in MODE 4 with high decay
heat load.
3
Description: The Limiting Condition for Operation (LCO) 3.4.8 of TS Residual Heat
Removal Shutdown Cooling System - Cold Shutdown, required in Mode 4, two RHR
shutdown cooling subsystems shall be operable, and, with no recirculation pump in
operation, at least one RHR shutdown cooling subsystem shall be in operation. The
TS Bases Section 3.4.8, indicated that an operable RHR shutdown cooling subsystem
consisted of one operable RHR pump, one heat exchanger, the associated piping and
valves, and the necessary portions of the RHR Service Water System System capable
of providing cooling water to the heat exchanger. The TS Bases Section 3.4.8 further
indicated that the two subsystems have a common suction source and were allowed to
have a common heat exchanger and common discharge piping. Thus, to meet the LCO,
both pumps in one loop or one pump in each of the two loops must be operable. Since
the piping and heat exchangers were passive components that were assumed not to fail,
they were allowed to be common to both subsystems.
When TS 3.4.8, LCO could not be met, Condition A, for one or two RHR shutdown
cooling subsystems inoperable, the Required Action was to, verify an alternate
method of decay heat removal was available for each inoperable RHR shutdown
cooling subsystem. The completion time for the required action was 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and
once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter. The TS Bases 3.4.8 for Condition A indicated that with
one of the two required RHR shutdown cooling subsystems inoperable, the remaining
subsystem was capable of providing the required decay heat removal. However, the
overall reliability was reduced, therefore, an alternate method of decay heat removal
must be provided. With both RHR shutdown cooling subsystems inoperable, an
alternate method of decay heat removal must be provided in addition to that provided
for the initial RHR shutdown cooling subsystem inoperability. This was to ensure the
re-establishment of backup decay heat removal capabilities, similar to the requirements
of the LCO. The bases further stated that the required cooling capacity of the alternate
method should be ensured by verifying (by calculation or demonstration) its capability to
maintain or reduce temperature. Alternate methods that can be used included (but not
limited to) the Reactor Water Cleanup System by itself or using feed and bleed in
combination with Control Rod Drive System or Condensate/Feed Systems.
Abnormal Procedure, Operations Manual C.4-B.03.04.A, Loss of Normal Shutdown
Cooling, provided instructions for establishing alternate methods for decay heat
removal. The inspectors noticed that except for the alternate method as described
below in the G-EK-1-45, the licensee was not able to show by calculation or
demonstration that the systems and methods credited in this procedure would be
capable of providing sufficient heat removal capability or appropriate levels of
redundancy as required by TS 3.4.8.
The G-EK-1-45 was a General Electric Letter to Northern States Power, Subject: Cold
Shutdown Capability Report, dated April 22, 1981. This letter provided a report which
described the capability of the Monticello Nuclear Generating Plant to achieve cold
shutdown using only safety class systems and assuming the worst single failure. The
alternate shutdown decay heat removal method used in the report credited combinations
of the RHR pumps and heat exchangers in the suppression pool cooling mode of RHR
to ensure suppression pool water temperatures were below the design limit. This
method utilized the core spray system and safety relief valves to circulate reactor
inventory to remove decay heat from the reactor.
4
The inspectors noted that calculations supporting the above alternate strategy utilized an
RHR subsystem that could be inoperable and/or unavailable and therefore may not be
credited to comply with TS 3.4.8. Specifically, the inspectors were concerned that while
the plant was in mode 4, with a credited one subsystem inoperable, the licensees
credited alternate decay heat removal method that relied on an RHR subsystem, to
perform the required suppression pool cooling function. The inspectors were concerned
that relying on the only operable RHR subsystem for the alternate method did not meet
the intent of the TS requirement as described in the TS Bases. Furthermore, the
inspectors noticed for Mode 4 with two RHR subsystems inoperable, the licensee failed
to verify by calculation or demonstrations that two additional redundant alternate decay
heat removal methods existed with sufficient capacity to maintain the average reactor
coolant temperature below 212 degrees Fahrenheit.
During the inspection, the licensee indicated that the Boiling Reactor Owners Group was
in the process of developing a draft TS Task Force Traveler to address the requirement
of TS 3.4.8 and its Bases.
Based on the information above, the inspectors were concerned that the plant
Operations Manual was inadequate and failed to include alternate decay heat removal
methods that would enable the licensee to comply with the requirement of TS 3.4.8. The
Operations Manual was required per TS 5.4.1 Procedures, which required that written
procedures shall be established, implemented, and maintained covering the emergency
operating procedures. The inspectors determined that this issue was unresolved
pending the actions by the licensee and the Boiling Reactor Owners Group and the NRC
review of these actions. The licensee entered the inspectors concerns into their
Corrective Action Program as AR 01516098. (URI 05000263/2016008-01, Failure to
provide acceptable Alternate Methods of Decay Heat Removal)
.2 Permanent Plant Modifications
a. Inspection Scope
The inspectors reviewed seven permanent plant modifications that had been installed
in the plant during the last 3 years. This review included in-plant walkdowns portions
of the high-pressure coolant injection steam drain line system, the Emergency Diesel
Generator Fuel Oil Transfer System, including the Diesel Fuel Oil pump house, the new
diesel fuel oil pumps installed in the day tank room, and portions of the fuel oil storage
tank tornado missile protection modifications. The modifications were selected based
upon risk significance, safety significance, and complexity. The inspectors reviewed the
modifications selected to determine if:
the supporting design and licensing basis documentation was updated;
the changes were in accordance with the specified design requirements;
the procedures and training plans affected by the modification have been
adequately updated;
the test documentation as required by the applicable test programs has been
updated; and
post-modification testing adequately verified system operability and/or
functionality.
5
The inspectors also used applicable industry standards to evaluate acceptability of the
modifications. The list of modifications and other documents reviewed by the inspectors
is included as an Attachment to this report.
This inspection constituted eight permanent plant modification samples as defined in
Inspection Procedure 71111.17-04.
4. OTHER ACTIVITIES
4OA2 Problem Identification and Resolution
.1 Routine Review of Condition Reports
a. Inspection Scope
The inspectors reviewed several corrective action process documents that identified or
were related to Title 10 of the Code of Federal Regulations, Part 50.59 evaluations and
permanent plant modifications. The inspectors reviewed these documents to evaluate
the effectiveness of corrective actions related to permanent plant modifications and
evaluations of changes, tests, and experiments. In addition, corrective action
documents written on issues identified during the inspection were reviewed to verify
adequate problem identification and incorporation of the problems into the corrective
action system. The specific corrective action documents that were sampled and
reviewed by the inspectors are listed in the attachment to this report.
b. Findings
No findings were identified.
4OA6 Management Meetings
.1 Exit Meeting Summary
On March 24, 2016, the inspectors presented the inspection results to Mr. M. Lingenfelter,
and other members of the licensee staff. The licensee personnel acknowledged the
inspection results presented and did not identify any proprietary content. The inspectors
confirmed that all proprietary material provided to the inspection team was identified and
will be dispositioned in accordance with applicable processes.
ATTACHMENT: SUPPLEMENTAL INFORMATION
6
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
M. Lingenfelter, Director of Engineering
A. Gonnering, Design Engineering
M. Kelly, Performance Assurance Manager
J. Gausman, Engineering
A. Ward, Regulatory Affairs Manager
T. Hurrle, Design Engineering Manager
B. Halvorson, Engineering
A. Kouba, Regulatory Affairs
D. Alstad, Design Engineer
E. Watzel, Electrical Design Engineering Supervisor
U.S. Nuclear Regulatory Commission
P. Zurawski, Senior Resident Inspector
P. LaFlamme, Acting Senior Resident Inspector
D. Krause, Resident Inspector
LIST OF ITEMS OPENED, CLOSED AND DISCUSSED
Opened
Failure to provide acceptable Alternate Methods of Decay Heat
Removal (Section 1R17.1b)
Closed and Discussed
None
LIST OF ACRONYMS USED
ADAMS Agencywide Documents Access and Management System
CFR Code of Federal Regulations
LCO Limiting Condition for Operation
NRC U.S. Nuclear Regulatory Commission
PARS Publicly Available Records System
TS Technical Specifications
Attachment
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection. Inclusion on this list does
not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that
selected sections of portions of the documents were evaluated as part of the overall inspection
effort. Inclusion of a document on this list does not imply NRC acceptance of the document or
any part of it, unless this is stated in the body of the inspection report.
10 CFR 50.59 EVALUATIONS
Number Description or Title Revision
SCR-12-0559 HPCI Logic Change to Provide Margin to MO-2035 and #16 Battery 1
SCR-13-0554 External Flooding Protection Strategy Change 0
SCR-15-0202 Evaluation of EPG/SAG, Revision 3 0
SCR-16-0024 Disconnect Faulty 46-19 PIP Over-Travel Input 0
10 CFR 50.59 SCREENINGS
Number Description or Title Revision
SCR-13-0696 Revise EDG Base Tank Fuel Oil Level Calculation 90-023 0
SCR-14-0074 Time Delay Relay 97-29 and 97-31 Setpoint Change 0
SCR-14-0413 Temp Rev to C.6-006-A-01and C.6-006-A-02
SCR-14-0415 USAR-06.06 Revision 0
SCR-14-0421 EC 23981 EDG Fuel Oil Tank Vent Lines Missile Protection 0
SCR-14-0512 Safety and Seismic Classification of the DG/RF and DG/RV Relays 0
SCR-14-0542 RHRSW and Emergency Service Water TS Bases Changes
SCR-14-0591 Fuel Oil Separation 4
SCR-14-0593 Revise Calculation 94-086 on SRV Accumulation Allowable 0
Leakage Rates
SCR-15-0093 EDG ESW Basket Strainer Modification
SCR-15-0115 C.4-B.09.02.A Revision to Resolve CAP AR 01465720 1
SCR-15-0193 Room Heat Up Calculation Revisions for SBO
SCR-15-0291 Revise Maximum Volume of EDG Base Tank in 90-023 0
SCR-15-0292 Diesel Pump House Heat Up Calculation 0
CALCULATIONS
Number Description or Title Revision
03-089 Inservice Testing Acceptance Criteria 3
09-106 CSP Motor-Oil and Bearing Operating Temperatures without 1
Cooling Water
09-176 Evaluation for Debris Disposition in Supply Pipe and Motor Cooler 0
Tube
09-178 Time to reach the RHRSW Pump Motor Cooling Line Strainer 0
Limiting Pressure Differential
14-025 Instrument Setpoint Calculation - Time Delay for Transfer to EDG 0
on Loss of Voltage
90-023 EC 23085 - EDG Fuel Oil Train Separation 3
92-224 Emergency Diesel Generator Loading 6A
94-086 Max Allowed Leakage Rates and Test Acceptance Criteria for SRV 5
2
CORRECTIVE ACTION PROGRAM DOCUMENTS INITIATED DURING INSPECTION
Number Description or Title Date
1510936 Incomplete EC Record Copy 02/03/2016
1514133 Clarification for USAR Section 8.4.1.3 03/01/2016
1514202 Page missing from WO 00491265 Record 03/02/2016
1514369 Screening SCR 14-0421 Answered Question Incorrectly 03/03/2016
1514464 EDG Building Roof FOI 91-0265 03/03/2016
1515054 Bases for Procedure A.6 Contain Incorrect Statements 03/09/2016
1515688 Signs of Leakage around FO-11-3 03/15/2016
1515716 NRC not Provided with Latest Copy of EC23085 03/15/2016
1515907 Formal Evaluation for HPCI Drain Line Bypass Flow 03/16/2016
1515939 Question Raised on CRD 46-19 03/16/2016
1516098 Actions for when LCO 3.4.8, RA A.1 not met Unclear 03/17/2016
1516101 Core Spray Motor Cooling Design Basis Question 03/17/2016
1516105 HPCI SR Test Inconsistent with TS Bases 03/17/2016
1516106 RCIC Surveillance Required Test Inconsistent with TS Bases 03/17/2016
CORRECTIVE ACTION PROGRAM DOCUMENTS REVIEWED
Number Description or Title Date
952310 M91064A Quarterly Backflushing of Residual Heat Removal 07/27/1991
system and Core Spray Pump Motors
01196451 CDBI EDG Base Tank Volume Calculation CA 90-023 09/03/2003
01355853 Update UFSAR for External Flooding Description Discrepancy 10/22/2012
01414416 Diesel Fuel Oil Temperature in Fuel Oil Transfer House is not 12/17/2013
Known
01420875-03 Condition Evaluation on EDG Base Tank Level Issues 04/04/2014
01424477 Appendix R Fire Strategy for Fire Area XII incorrect 03/27/2014
1478798 EG Transfer Relay not Classified as Safety Related 05/13/2015
1484554 RHRSW-29-2 Handwheel/Stem Sheared off 06/29/2015
1502700 Catastrophic fail of MO-1900 11/19/2015
DRAWINGS
Number Description or Title Revision
NF-36175 Single Line Diagram - Station Connections 85
104B2506 Connection Diagram - Control Rod Drive Position Indicator Probe
NH-46250 P&ID - High Pressure Coolant Injection System 83
NE-36399-9 Essential Bus Transfer Circuit - Division I 77
NE-36399-9B Essential Bus Transfer Circuits - Division II 78
NF-36061 Equipment Location - Turbine Building EL 951-0 76
NF-36750 Standby Diesel Generator Building 8
NH-36241-1 Reactor Pressure Relief P&ID 78
NH-36051 P&ID Diesel Oil System 85
NH-178639-1 Levee Alignment and Bin Wall Plan 4
NF-119034-1 #11/#12 DG Fuel Oil System Isometric 78
NH-36253 P&ID Standby Liquid Control System 80
NH-36249 P&ID (Steam Side) High Pressure Coolant Injection System 82
NX-13142-42 Primary Steam & HPCI System 78
3
MODIFICATIONS
Number Description or Title Revision
EC-14065 RHRSW Motor Cooler Strainers 1
EC-20887 LT-5200 River Level Setpoint Change for Upper Value
EC-21934 Evaluation of Corrosion Found in the 11 EDG Coolant 0
Expansion Tank
EC-21999 Equivalency Evaluation: RHRSW-17 is the emergency injection 0
check valve for the RHR to RSW crosstie
EC-22008 Monticello 125V #12 Battery Modified Performance Test Profile 0
EC-22414 SQUG Evaluation of Diesel Oil Service Pump P-77 0
EC-23085 EDG Fuel Oil Train Separation 0
EC-23272 Revise EDG Base Tank Fuel Oil Level Calc 90-023
EC-23616 Revise Setpoints for Relays 97-29 and 97-31 0
EC-23857 Recirc Pump Seal Water Piping 0
EC-25889 Operating with HPCI CV-2043 (Steam Trap Bypass) Open 0
EC-25266 EDG Fuel Oil Separation 0
OTHER DOCUMENTS
Date or
Number Description or Title Revision
10040-A-020 Technical Specification for Steel Roof Deck 2
FOI 91-0265 Qualification of the EDG Building Roof for Accumulated Snow 04/18/1994
Load
FG-E-SE-03 50.59 Resource Manual 5
WO 00505386-30 EC23085 Pre-Op Testing Division I 05/06/2015
WO 00505386-29 EC23085 Pre-Op Testing Division II 04/26/2015
257HA354 Technical Specification for High Pressure Coolant Injection 2
System
G-EK-1-45 Cold Shutdown Capability Report 04/22/1981
SRI 95-002 Core Spray Pump Motor Without Water Cooling 09/28/1995
EE 25506 RFO27 Decay Heat Evaluation
PROCEDURES
Number Description or Title Revision
0075 Control Rod Drive Coupling Test 19
C.06-006-C-01 Diesel Oil Storage Tank T-44 Hi Low Level 6
C.06-006-C-02 Diesel Oil Storage Tank T-44 Low-Low Level 6
C.06-006-C-03 Division 1 EDG P-160A & P-160C Not Running 6
C.06-006-C-06 Diesel Gen Tank T-160A Level/Flow Low 4
2014-02 Turbine Building Outside 27
A.6 Acts of Nature 53
0255-17-ID-1 Master Alternate Nitrogen System Tests 25
0255-17-ID-15 SRV RV-71D and RV-2-71G Pneumatic Supply Leakage Test 13
Ops Man Loss of Normal Shutdown Cooling 15
C.4-B.03.04.A
1339 ECCS Pump Motor Cooler Flush 35
9111-01 Shutdown Cooling Division I Protected System Ticket Checklist 6
2270 Critical Safety System Checklist 11
OWI-02.03 Operator Rounds, Turbine Building West 64
Ops Man B. Core Spray Cooling System 42
03.01-05
0255-05-1A-1-2 B RHR SW Quarterly Pump and Valve Test 82
4
April 19, 2016
Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362-9637
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - EVALUATIONS OF CHANGES, TESTS,
AND EXPERIMENTS AND PERMANENT PLANT MODIFICATIONS BASELINE
INSPECTION REPORT 05000263/2016008
Dear Mr. Gardner:
On March 24, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an Evaluations of
Changes, Tests, and Experiments and Permanent Plant Modifications inspection at your Monticello
Nuclear Generating Plant. The enclosed inspection report documents the inspection results which were
discussed on March 24, 2016, with Mr. M. Lingenfelter and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance
with the Commissions rules and regulations and with the conditions of your license. The inspectors
reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections,
Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its
enclosure, and your response (if any) will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
Enclosure:
cc: Distribution via LISTSERV
DISTRIBUTION:
Jeremy Bowen Darrell Roberts DRPIII
RidsNrrPMPalisades Resource Richard Skokowski DRSIII
RidsNrrDorlLpl3-1 Resource Allan Barker Jim Clay
RidsNrrDirsIrib Resource Carole Ariano Carmen Olteanu
Cynthia Pederson Linda Linn ROPreports.Resource@nrc.gov
ADAMS Accession Number ML16113A346
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII RIII RIII
NAME ADahbur:cl RDaley
DATE 04/19/16 04/19/16
OFFICIAL RECORD COPY