Letter Sequence Other |
---|
|
Results
Other: CP-201600814, and ISFSI - Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments (CPNPP Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89)), CP-201600932, & ISFSI - Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments, CP-201600933, and Independent Spent Fuel Storage Installation, Submittal of Additional Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments, CP-201600934, Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments (CPNPP Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89)), CP-201600936, Independent Spent Fuel Storage Installation, Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments, CP-201601011, Submittal of Amendment No. 13 to Indemnity Agreement No. B-96, CP-201700082, Independent Spent Fuel Storage Installation (Isfsi), - Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments, ML15351A050, ML15351A053, ML16032A349, ML16076A163
|
MONTHYEARCP-201500264, Decommissioning Report2015-03-31031 March 2015 Decommissioning Report Project stage: Request CP-201501062, ISFSI - Application for Order Approving Transfer of Licenses and Conforming License Amendments2015-11-12012 November 2015 ISFSI - Application for Order Approving Transfer of Licenses and Conforming License Amendments Project stage: Request CP-201501130, ISFSI - Transmittal of Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments2015-12-0909 December 2015 ISFSI - Transmittal of Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments Project stage: Request ML15348A0182015-12-14014 December 2015 NRR E-mail Capture - Acceptance Review - Application for Order Approving Transfer of Licenses and Conforming License Amendments - CACs MF7075 and MF7076 Project stage: Acceptance Review ML15351A0572016-01-19019 January 2016 Request for Withholding Information from Public Disclosure, Affidavit Dated 12/9/15 Executed by T. Mccool, Luminant Generation Company LLC Balance Sheets (CAC MF7075-MF7076) Project stage: Withholding Request Acceptance ML15351A0502016-01-27027 January 2016 Independent Spent Fuel Storage Installation - Letter, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendment, and Opportunity for a Hearing Project stage: Other ML15351A0532016-01-27027 January 2016 Independent Spent Fuel Storage Installation - FRN, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendment, and Opportunity for a Hearing Project stage: Other ML16032A3492016-02-0202 February 2016 Independent Spent Fuel Storage Installation - Correction Letter, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendments, and Opportunity for a Hearing (CAC MF7075-MF7076) Project stage: Other ML16034A1962016-02-0808 February 2016 Independent Spent Fuel Storage Installation - Request for Additional Information, Application for Order Approving Transfer of Facility Operating Licenses and Conforming Amendment Project stage: RAI CP-201600136, and Independent Spent Fuel Storage Installation (Isfsi), Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments2016-03-14014 March 2016 and Independent Spent Fuel Storage Installation (Isfsi), Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments Project stage: Request ML16076A1632016-03-14014 March 2016 Balance Sheets Project stage: Other CP-201600328, Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments (CPNPP Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89))2016-03-29029 March 2016 Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments (CPNPP Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89)) Project stage: Request ML16085A1482016-04-0606 April 2016 Request for Withholding Information from Public Disclosure - 3/14/16 Affidavit Executed by T. Mccool, Luminant Generation Company LLC Balance Sheets (Proprietary) Project stage: Withholding Request Acceptance CP-201600411, and Independent Spent Fuel Storage Installation - Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments2016-04-20020 April 2016 and Independent Spent Fuel Storage Installation - Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments Project stage: Request ML16130A6492016-05-0606 May 2016 ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments Project stage: Draft Other ML16096A2552016-05-0606 May 2016 Order Approving Transfer of Licenses and Approving Conforming Amendments Project stage: Request ML16096A2642016-05-0606 May 2016 Draft Conforming Amendments, Application for Order Approving Direct and Indirect Transfer of Licenses and Conforming License Amendments Project stage: Draft Other ML16096A2662016-05-0606 May 2016 Redacted Letter, Order, Safety Evaluation, and Draft Conforming Amendments, Application for Order Approving Direct and Indirect Transfer of Licenses and Conforming License Amendments Project stage: Draft Approval NRC-2016-0020, ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments (CAC Nos. MF7075 and MF7076)2016-05-0606 May 2016 ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments (CAC Nos. MF7075 and MF7076) Project stage: Draft Other CP-201600814, and ISFSI - Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments (CPNPP Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89))2016-08-16016 August 2016 and ISFSI - Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments (CPNPP Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89)) Project stage: Other CP-201600932, & ISFSI - Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments2016-09-16016 September 2016 & ISFSI - Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments Project stage: Other CP-201600933, and Independent Spent Fuel Storage Installation, Submittal of Additional Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments2016-09-21021 September 2016 and Independent Spent Fuel Storage Installation, Submittal of Additional Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments Project stage: Other CP-201600934, Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments (CPNPP Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89))2016-09-29029 September 2016 Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments (CPNPP Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89)) Project stage: Other CP-201600936, Independent Spent Fuel Storage Installation, Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments2016-10-13013 October 2016 Independent Spent Fuel Storage Installation, Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments Project stage: Other CP-201601011, Submittal of Amendment No. 13 to Indemnity Agreement No. B-962016-10-19019 October 2016 Submittal of Amendment No. 13 to Indemnity Agreement No. B-96 Project stage: Other CP-201700082, Independent Spent Fuel Storage Installation (Isfsi), - Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments2017-01-30030 January 2017 Independent Spent Fuel Storage Installation (Isfsi), - Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments Project stage: Other 2016-02-08
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML23312A0292023-11-0808 November 2023 Federal Register Notice: Comanche Peak Draft Supplemental Environmental Impact Statement Comment Period Correction ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23124A0772023-05-17017 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (FRN) ML23039A0532023-02-16016 February 2023 FRN - Comanche Peak Second Notice of Intent to Prepare EIS and to Conduct EIS Scoping ML22299A1792022-12-0808 December 2022 FRN - Comanche Peak Notice of Intent to Prepare EIS and to Conduct EIS Scoping ML22297A0062022-11-28028 November 2022 Notice of Acceptance and Opportunity for Federal Register Notice ML22285A0742022-10-26026 October 2022 LRA - Receipt and Availability FRN ML21147A5192021-06-24024 June 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding Various Parts of 10 CFR Issued in May 2021 ML21060A5962021-03-0909 March 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding 10 CFR Part 26 for February 2021 ML20255A1002020-10-0707 October 2020 Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Test Program Interval for Certain Check and Relief Valves (EPID L-2020-LLR-0061 and EPID L-2020-LLR-0062 (COVID-19)) ML20101P5592020-04-13013 April 2020 Public Notice of Application for Amendment to Facility Operating License ML20035C4082020-02-18018 February 2020 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 02/25/2020 ML20015A0542020-02-14014 February 2020 Federal Register Notice - Individual Notice of Consideration of Issuance of Amendments to Adopt TSTF-513, Revision 3 ML20015A3962020-02-14014 February 2020 Letter - Individual Notice of Consideration of Issuance of Amendments to Adopt TSTF-513, Revision 3 ML19122A1572019-05-15015 May 2019 Federal Register Notice: Comanche Peak Independent Spent Fuel Storage Installation - Environmental Assessment and Finding of No Significant Impact; Issues NRC-2018-0287, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/20192019-01-0202 January 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/2019 ML18351A0022019-01-0202 January 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/2019 ML18295A7442018-10-25025 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18 NRC-2018-0205, FRN - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery2018-10-0404 October 2018 FRN - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18276A0262018-10-0404 October 2018 Letter - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18276A0292018-10-0404 October 2018 FRN - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18254A0162018-09-13013 September 2018 FRN, Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise Technical Specification (TS) 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18173A1792018-08-0707 August 2018 OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan C ML17198A3292017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement Letter, Paul Gunter, Beyond Nuclear, Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Jap ML17200A0652017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement FRN, Paul Gunter, Beyond Nuclear, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and ML16300A1772016-10-27027 October 2016 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Consideration; Correction to Notice Published October 25, 2016 NRC-2016-0214, Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Consideration; Correction to Notice Published October 25, 20162016-10-27027 October 2016 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Consideration; Correction to Notice Published October 25, 2016 NRC-2016-0020, ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments (CAC Nos. MF7075 and MF7076)2016-05-0606 May 2016 ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments (CAC Nos. MF7075 and MF7076) ML16130A6492016-05-0606 May 2016 ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments ML16032A3492016-02-0202 February 2016 Independent Spent Fuel Storage Installation - Correction Letter, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendments, and Opportunity for a Hearing (CAC MF7075-MF7076) ML15351A0532016-01-27027 January 2016 Independent Spent Fuel Storage Installation - FRN, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendment, and Opportunity for a Hearing ML15351A0502016-01-27027 January 2016 Independent Spent Fuel Storage Installation - Letter, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendment, and Opportunity for a Hearing ML15218A6252015-08-14014 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13210A2782013-08-0606 August 2013 FRN, Withdrawal of Amendment Request, Revise Technical Specification (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML13210A2772013-08-0606 August 2013 Letter, Withdrawal of Amendment Request, Revise Technical Specification (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML13064A4302013-03-12012 March 2013 Correction FRN, Correct Date of Safety Evaluation in One Column; Order Approving the Proposed Internal Restructuring and Indirect Transfer of License NRC-2012-0310, FRN, Order Approving Indirect License Transfer Regarding the Proposed Energy Future Holdings Corporate Internal Restructuring (TAC Nos. ME9767 and ME9768)2013-02-22022 February 2013 FRN, Order Approving Indirect License Transfer Regarding the Proposed Energy Future Holdings Corporate Internal Restructuring (TAC Nos. ME9767 and ME9768) ML13022A3342013-02-22022 February 2013 FRN, Order Approving Indirect License Transfer Regarding the Proposed Energy Future Holdings Corporate Internal Restructuring ML12292A2022013-01-0202 January 2013 ISFSI - Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing; Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction NRC-2012-0301, ISFSI - FRN, Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing - Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction2012-12-26026 December 2012 ISFSI - FRN, Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing - Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction ML12292A2092012-12-26026 December 2012 ISFSI - FRN, Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing - Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1126504892011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations NRC-2011-0230, FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations2011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations ML1126306232011-09-20020 September 2011 Commission Meetings - FRN ML1021403872010-07-30030 July 2010 Nuclear Regulatory Commission Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations - Publication Date of August 10, 2010 NRC-2009-0510, Environment Assessment and Finding of No Significant Impact (TAC Nos. ME0643 and ME0644)2009-11-17017 November 2009 Environment Assessment and Finding of No Significant Impact (TAC Nos. ME0643 and ME0644) 2023-09-29
[Table view] Category:Letter
MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 IR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) ML24024A2102024-01-29029 January 2024 Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24025A0052024-01-25025 January 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23159A2082023-12-20020 December 2023 Request for Withholding Information from Public Disclosure ML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23348A2392023-12-19019 December 2023 Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 ML23333A0872023-12-13013 December 2023 Transmittal of Dam Safety Inspection Report - Public CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23291A4382023-11-30030 November 2023 Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal Applica ML23325A0182023-11-30030 November 2023 Schedule Revision for the License Renewal Application Review IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation ML23308A0032023-11-17017 November 2023 Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact Statement ML23308A0022023-11-17017 November 2023 Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact Statement ML23317A3002023-11-13013 November 2023 Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2972023-11-13013 November 2023 Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2872023-11-13013 November 2023 Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2832023-11-13013 November 2023 Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2852023-11-13013 November 2023 Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23306A0302023-11-13013 November 2023 Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2902023-11-13013 November 2023 Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2982023-11-13013 November 2023 Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2842023-11-13013 November 2023 Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2822023-11-13013 November 2023 Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2962023-11-13013 November 2023 Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2812023-11-13013 November 2023 Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2862023-11-13013 November 2023 Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3032023-11-13013 November 2023 Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2882023-11-13013 November 2023 Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3012023-11-13013 November 2023 Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2792023-11-13013 November 2023 Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3022023-11-13013 November 2023 Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2892023-11-13013 November 2023 Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23360A6312023-10-26026 October 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023 CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23263A0242023-09-21021 September 2023 Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application 2024-01-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 2, 2016 Mr. Ken J. Peters Senior Vice President and Chief Nuclear Officer (Acting)
Attention: Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION-CORRECTION LETTER- NOTICE OF CONSIDERATION OF APPROVAL OF TRANSFER OF FACILITY OPERATING LICENSES AND CONFORMING AMENDMENTS, AND OPPORTUNITY FOR A HEARING (CAC NOS. MF7075 AND MF7076)
Dear Mr. Peters:
Enclosed is a copy of a corrected Notice of Consideration of Approval of Transfer of Facility Operating License Nos. NPF-87 and NPF-89 and Conforming Amendments, and Opportunity for a Hearing for Comanche Peak Nuclear Power Plant, Units 1 and 2 (CPNPP), respectively, and Independent Spent Fuel Storage Installation (ISFSI), requested by Luminant Generation Company LLC (Luminant Power) by letter dated November 12, 2015, as supplemented by letter dated December 9, 2015. The following corrections have been made to the notice transmitted by letter dated January 27, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15351A050):
- The notice summary erroneously identified CPNPP as "Boiling Water Reactor" design. It has been corrected to state "Pressurized Water Reactor" design.
- The notice summary previously stated, in part, that "ISFSI is also located within the protected area of the existing units." The statement has been corrected to state, "ISFSI is also located within a separate protected area collocated at the CPNPP site."
The Enclosure to this letter supersedes the notice enclosed with the letter dated January 27, 2016, in its entirety.
K. Peters This notice is being forwarded to the Office of the Federal Register for publication.
Sincerely,
~ ~~ b-~1~f'~
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445, 50-446, and 72-74
Enclosure:
Federal Register Notice cc w/encl: Distribution via Listserv
ENCLOSURE CORRECTED FEDERAL REGISTER NOTICE DATED JANUARY 27, 2016
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-445,50-446, and 72-74; NRC-2016-0020]
Comanche Peak Nuclear Power Plant, Units 1 and 2, and Independent Spent Fuel Storage Installation Consideration of Approval of Transfer of Licenses and Conforming Amendments AGENCY: Nuclear Regulatory Commission.
ACTION: Application for direct transfer of licenses; opportunity to comment, request a hearing, and petition for leave to intervene.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of a direct license transfer application filed by Luminant Generation Company, LLC (Luminant Power) on November 12, 2015, and supplemented by letter dated December 9, 2015.
The application seeks NRC approval of the direct transfer of Facility Operating License Nos.
NPF-87 and NPF-89 for Comanche Peak Nuclear Power Plant, Units 1 and 2 (CPNPP), and general license for independent spent fuel storage installation (ISFSI) from the current holder, Luminant Power, to as yet unnamed companies, herein identified as Comanche Peak LLC (CP LLC), as owner, and Operating Company LLC (OpCo LLC), as operator. Both the units are Pressurized Water Reactor design, 3612 megawatts thermal units, located in Somervell County, Texas. ISFSI is also located within a separate protected area collocated at the CPNPP site.
The NRC is also considering amending the facility operating licenses for administrative purposes to reflect the proposed transfer.
DATES: Comments must be filed by [INSERT DATE 30 DAYS FROM DATE OF PUBLICATION IN THE FEDERAL REGISTER]. A request for a hearing must be filed by
[INSERT DATE 20 DAYS FROM DATE OF PUBLICATION IN THE FEDERAL REGISTER].
ADDRESSES: You may submit comments by any of the following methods (unless this document describes a different method for submitting comments on a specific subject):
- Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2016-0020. Address questions about NRC dockets to Carol Gallagher; telephone: 301-415-3463; e-mail: Carol.Gallagher@nrc.gov. For technical questions contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- E-mail comments to: Hearingdocket@nrc.gov. If you do not receive an automatic e-mail reply confirming receipt, then contact us at 301-415-1677.
- Fax comments to: Secretary, U.S. Nuclear Regulatory Commission at 301-415-1101.
- Mail comments to: Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Rulemakings and Adjudications Staff.
- Hand deliver comments to: 11555 Rockville Pike, Rockville, Maryland 20852, between 7:30 a.m. and 4:15 p.m. (Eastern Time) Federal workdays; telephone: 301-415-1677.
For additional direction on obtaining information and submitting comments, see "Obtaining Information and Submitting Comments" in the SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Balwant K. Singal, Office of the Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone:
301-415-3016, e-mail: Balwant.Singal@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC-2016-0020 when contacting the NRC about the availability of information for this action. You may obtain publicly-available information related to this action by any of the following methods:
- NRC's Agencywide Documents Access and Management System (ADAMS):
You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The application for direct transfer of the licenses dated November 12 and December 9, 2015, is available in ADAMS under Accession Nos. ML15320A093 and ML15345A048, respechvely.
- NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments.
Please include Docket ID NRC-2016-0020 in the subject line of your comment submission.
The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.
II. Introduction The NRC is considering the issuance of an order under§ 50.80 of title 10 of the Code of Federal Regulations (10 CFR), approving the direct transfer of control of CPNPP and ISFSI, Facility Operating License Nos. NPF-87 and NPF-89, currently held by Luminant Power.
Luminant Power is owned by Energy Future Competitive Holdings Company LLC (EFCH),
through its wholly owned subsidiaries. The EFCH is a direct wholly owned subsidiary of Energy Future Holdings Corporation (EFH). According to the application, the current and intended ownership structure of the facility is depicted in simplified organization charts provided in
Exhibits A and B of the letter dated November 12, 2015. As a result of the proposed transactions and consistent with Exhibit B, EFH and EFCH will no longer ultimately own the facility. Rather, at the emergence from the bankruptcy, Reorganized Texas Competitive Electric Holdings (TCEH) Corporation (Reorganized TCEH), the ultimate parent company of CP LLC, will be ultimately owned by numerous and diverse set of independent and unaffiliated stockholders. No single entity is expected to own a majority of, or exercise control over Reorganized TCEH or its board of directors. The licenses will be transferred from Luminant Power to CP LLC, as owner, and OpCo LLC, as operator. Luminant Power has committed to inform the NRC staff of the final legal entity names and submit updated operating license revision pages, as and when, the final legal names are selected before the issuance of the license transfer. The NRC is also considering amending the facility operating licenses for administrative purposes to reflect the proposed transfer.
Following approval of the proposed direct transfer of control of the license, CP LLC would acquire ownership of the facility. OpCo LLC would be responsible for the operation and maintenance of CPNPP and ISFSI. Current Luminant Power nuclear management and technical personnel will be employed by OpCo LLC. Accordingly, there will be no change in management and/or technical qualifications, and OpCo LLC will continue to be technically qualified to operate the facility.
No physical changes to the CPNPP and ISFSI or operational changes are being proposed in the application.
The NRC's regulations at 10 CFR 50.80 state that no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the license, unless the Commission gives its consent in writing. The Commission will approve an application for the direct transfer of a license if the Commission determines that the proposed transferee is
qualified to hold the license, and that the transfer is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission.
Before issuance of the proposed conforming license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (AEA), and the Commission's regulations.
As provided in 10 CFR 2.1315, unless otherwise determined by the Commission with regard to a specific application, the Commission has determined that any amendment to the license of a utilization facility or to the license of an ISFSI, which does no more than conform the license to reflect the transfer action, involves no significant hazards consideration and no genuine issue as to whether the health and safety of the public will be significantly affected. No contrary determination has been made with respect to this specific license amendment application. In light of the generic determination reflected in 10 CFR 2.1315, no public comments with respect to significant hazards considerations are being solicited, notwithstanding the general comment procedures contained in 10 CFR 50. 91.
Ill. Opportunity to Comment Within 30 days from the date of publication of this notice, persons may submit written comments regarding the license transfer application, as provided for in 10 CFR 2.1305. The Commission will consider and, if appropriate, respond to these comments, but such comments will not otherwise constitute part of the decisional record. Comments should be submitted as described in the ADDRESSES section of this document.
IV. Opportunity to Request a Hearing and Petition for Leave to Intervene Within 20 days after the date of publication of this notice, any person(s) whose interest may be affected by this action may file a request for a hearing and a petition to intervene with respect to issuance of the amendment to the subject facility operating license or combined license. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's "Agency Rules of Practice and Procedure" in 10 CFR part 2. Interested person(s) should consult a current copy of 10 CFR 2.309, which is available at the NRC's PDR, located at One White Flint North, Room 01-F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. The NRC's regulations are accessible electronically from the NRC Library on the NRC's Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition for leave to intervene is filed within 20 days, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements: (1) the name, address, and telephone number of the requester or petitioner; (2) the nature of the requester's/petitioner's right under the Act to be made a party to the proceeding; (3) the nature and extent of the requester's/petitioner's property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be
entered in the proceeding on the requester's/petitioner's interest. The petition must also set forth the specific contentions which the requester/petitioner seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the requester/petitioner shall provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the requester/petitioner intends to rely in proving the contention at the hearing. The requester/petitioner must also provide references to those specific sources and documents of which the petitioner is aware and on which the requester/petitioner intends to rely to establish those facts or expert opinion. The petition must include sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the requester/petitioner to relief. A requester/petitioner who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing with respect to resolution of that person's admitted contentions, including the opportunity to present evidence and to submit a cross-examination plan for cross-examination of witnesses, consistent with NRC regulations, policies and procedures.
Petitions for leave to intervene must be filed no later than 20 days from the date of publication of this notice. Requests for hearing, petitions for leave to intervene, and motions for leave to file new or amended contentions that are filed after the 20-day deadline will not be
entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1 )(i)-(iii).
If a hearing is requested, and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, then any hearing held would take place before the issuance of any amendment unless the Commission finds an imminent danger to the health or safety of the public, in which case it will issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, Federally-recognized Indian Tribe, or agency thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(h)(1 ).
The petition should state the nature and extent of the petitioner's interest in the proceeding.
The petition should be submitted to the Commission by [INSERT DATE 20 DAYS FROM THE DATE OF PUBLICATION IN THE FEDERAL REGISTER]. The petition must be filed in accordance with the filing instructions in the "Electronic Submissions (E-Filing)" section of this document, and should meet the requirements for petitions for leave to intervene set forth in this section, except that under§ 2.309(h)(2) a State, local governmental body, or Federally-recognized Indian Tribe, or agency thereof does not need to address the standing requirements in 10 CFR 2.309(d) if the facility is located within its boundaries. A State, local governmental body, Federally-recognized Indian Tribe, or agency thereof may also have the opportunity to participate under 10 CFR 2.315(c).
If a hearing is granted, any person who does not wish, or is not qualified, to become a party to the proceeding may, in the discretion of the presiding officer, be permitted to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a). A person making a limited appearance may make an oral or written statement of position on the issues, but may not otherwise participate in the proceeding. A limited appearance may be made at any session of the hearing or at any prehearing conference, subject to the limits and conditions as may be imposed by the presiding officer. Persons desiring to make a limited appearance are requested to inform the Secretary of the Commission by [INSERT DATE 20 DAYS FROM DATE OF PUBLICATION IN THE FEDERAL REGISTER].
V. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC's E-Filing rule (72 FR 49139; August 28, 2007). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by telephone at 301-415-1677, to request (1) a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign
documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counsel or representative, already holds an NRC-issued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is available on the NRC's public Web site at http:llwww.nrc.gov!site-he/p/e-submittalslqetting-started.htm/. System requirements for accessing the E-Submittal server are detailed in the NRC's "Guidance for Electronic Submission," which is available on the agency's public Web site at http:llwww.nrc.gov!site-helple-submittals.html. Participants may attempt to use other software not listed on the Web site, but should note that the NRC's E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using unlisted software.
If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRC's online, Web-based submission form. In order to serve documents through the Electronic Information Exchange System, users will be required to install a Web browser plug-in from the NRC's Web site.
Further information on the Web-based submission form, including the installation of the Web browser plug-in, is available on the NRC's public Web site at http:llwww.nrc.gov/site-helple-submittals. html.
Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit a request for hearing or petition for leave to intervene.
Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC's public Web site at http://www.nrc.gov!site-he/ple-submittals.html. A
filing is considered complete at the time the documents are submitted through the NRC's E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11 :59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The E-Filing system also distributes an e-mail notice that provides access to the document to the NRC's Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/petition to intervene is filed so that they can obtain access to the document via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-Filing system may seek assistance by contacting the NRC Meta System Help Desk through the "Contact Us" link located on the NRC's public Web site at http://www.nrc.govlsite-he/p/e-submitta/s.lttml, by e-mail to MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format.
Such filings must be submitted by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555
Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff.
Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the NRC's electronic hearing docket which is available to the public at http:llehd1.nrc.govlehdl, unless excluded pursuant to an order of the Commission, or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. However, in some instances, a request to intervene will require including information on local residence in order to demonstrate a proximity assertion of interest in the proceeding. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission.
The Commission will issue a notice or order granting or denying a hearing request or intervention petition, designating the issues for any hearing that will be held and designating the Presiding Officer. A notice granting a hearing will be published in the Federal Register and served on the parties to the hearing.
For further details with respect to this application, see the letters dated November 12 and December 9, 2015.
Dated at Rockville, Maryland, this 271h day of January 2016.
For the Nuclear Regulatory Commission.
- D~~,vJ~
Balwant K. Singal, Senior Project Manager, Plant Licensing Branch IV-1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
LTR: ML16032A349 FRN: ML15351A053 OFFICE NRR/DORL/LPL4-1/PM NRR/DORL/LPL4-1/LA NRR/DORL/LPL4-1/BC NRR/DORL/LPL4-1/PM NAME BSingal JBurkhardt RPascarelli BSingal DATE 2/01/2016 2/01/2016 2/02/2016 2/02/2016