MONTHYEARAEP-NRC-2024-62, Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask2024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring IR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump 2024-08-08
[Table view] |
Text
INDIANA Indiana Michigan Power MICHIGAN Cook Nuclear Plant pOWeR lOne Cook Place A unt o Amricn Elctrc PwerBridgman, MI 491106 A unt o Amnca Elctrc PwerIndianaMichigan Powercorn December 14, 2015 AEP-NRC-201 5-117 10 CFR 50.4 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Commitment to Maintain Severe Accident Management Guidelines
Dear Sir or Madam:
The Nuclear Energy Institute Nuclear Strategic Issues Advisory Committee recently approved an Industry Initiative to implement and maintain Severe Accident Management Guidelines (SAMGs).This letter establishes commitments related to SAMGs for Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant. These guidelines would be used by emergency response personnel during accident conditions that progress beyond the mitigation capabilities described in Emergency Operating Procedures.
SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.The new SAMG commitments are listed in the Enclosure.
It is expected that U. S. Nuclear Regulatory Commission (NRC) staff personnel will conduct periodic inspection of our SAMGs and performance deficiencies, if any, will be assessed using the Reactor Oversight Process. We also understand that inspection activities will not extend to NRC review and approval of SAMG strategies, or the use of equipment described in the SAMGs.Should you have any questions concerning the content of this letter, please contact Mr. Michael K. Scarpello at (269) 466-2649.Sincerely Joel P. Gebbie Site Vice President
Enclosure:
Regulatory Commitments U. S. Nuclear Regulatory Commission AEP-NRC-2015-1 17 Page 2 c: R. J. Ancona- MPSC A. W. Dietrich -NRC Washington, DC MDEQ -RMD/RPS NRC Director, NRR NRC Resident Inspector C. D..Pederson
-NRC Region IlI A. J. Williamson
-AEP Ft. Wayne, w/o enclosure D. L. Young -NEI, dly~nei.org Enclosure to AEP-NRC-2015-117 REGULATORY COMMITMENTS The following table identifies an action committed to by Indiana Michigan Power Company (l&M)in this document.
Any other actions discussed in this submittal represent intended or planned actions by l&M. They are described to the U. S. Nuclear Regulatory Commission (NRC) for the NRC's information and are not regulatory commitments.
Commitment Type Scheduled (Check One) Completion Date One- Continuing Time Compliance Action Donald C. Cook Nuclear Plant's (CNP) X October 31, 2016 Severe Accident Management Guidelines (SAMGs) will be considered within plant configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time.CNP's SAMGs will be updated to future X Within two refueling revisions of the Pressurized Water Reactor outages or Owners' Group generic severe accident three years of the technical guidelines, and the SAMGs will be publication date of integrated with other emergency response the guidelines, guideline sets and symptom-based whichever is greater.Emergency Operating Procedures, and validated, using the guidance in NEI 14-01, Emergency Response Procedures and Guidelines for Beyond Design Bases Events and Severe Accidents.
INDIANA Indiana Michigan Power MICHIGAN Cook Nuclear Plant pOWeR lOne Cook Place A unt o Amricn Elctrc PwerBridgman, MI 491106 A unt o Amnca Elctrc PwerIndianaMichigan Powercorn December 14, 2015 AEP-NRC-201 5-117 10 CFR 50.4 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Commitment to Maintain Severe Accident Management Guidelines
Dear Sir or Madam:
The Nuclear Energy Institute Nuclear Strategic Issues Advisory Committee recently approved an Industry Initiative to implement and maintain Severe Accident Management Guidelines (SAMGs).This letter establishes commitments related to SAMGs for Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant. These guidelines would be used by emergency response personnel during accident conditions that progress beyond the mitigation capabilities described in Emergency Operating Procedures.
SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.The new SAMG commitments are listed in the Enclosure.
It is expected that U. S. Nuclear Regulatory Commission (NRC) staff personnel will conduct periodic inspection of our SAMGs and performance deficiencies, if any, will be assessed using the Reactor Oversight Process. We also understand that inspection activities will not extend to NRC review and approval of SAMG strategies, or the use of equipment described in the SAMGs.Should you have any questions concerning the content of this letter, please contact Mr. Michael K. Scarpello at (269) 466-2649.Sincerely Joel P. Gebbie Site Vice President
Enclosure:
Regulatory Commitments U. S. Nuclear Regulatory Commission AEP-NRC-2015-1 17 Page 2 c: R. J. Ancona- MPSC A. W. Dietrich -NRC Washington, DC MDEQ -RMD/RPS NRC Director, NRR NRC Resident Inspector C. D..Pederson
-NRC Region IlI A. J. Williamson
-AEP Ft. Wayne, w/o enclosure D. L. Young -NEI, dly~nei.org Enclosure to AEP-NRC-2015-117 REGULATORY COMMITMENTS The following table identifies an action committed to by Indiana Michigan Power Company (l&M)in this document.
Any other actions discussed in this submittal represent intended or planned actions by l&M. They are described to the U. S. Nuclear Regulatory Commission (NRC) for the NRC's information and are not regulatory commitments.
Commitment Type Scheduled (Check One) Completion Date One- Continuing Time Compliance Action Donald C. Cook Nuclear Plant's (CNP) X October 31, 2016 Severe Accident Management Guidelines (SAMGs) will be considered within plant configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time.CNP's SAMGs will be updated to future X Within two refueling revisions of the Pressurized Water Reactor outages or Owners' Group generic severe accident three years of the technical guidelines, and the SAMGs will be publication date of integrated with other emergency response the guidelines, guideline sets and symptom-based whichever is greater.Emergency Operating Procedures, and validated, using the guidance in NEI 14-01, Emergency Response Procedures and Guidelines for Beyond Design Bases Events and Severe Accidents.