UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 29, 1999 LICENSEES: Baltimore Gas and Electric (BGE) Company and Duke Energy Corporation (Duke)
FACILITIES: Calvert Cliffs Nuclear Power Plant, (CCNPP) Unit Nos. 1 and 2 and Oconee Nuclear Station, (ONS) Unit Nos. 1, 2, and 3
SUBJECT:
SUMMARY
OF AUGUST 20, 1999, MEETING WITH BGE AND DUKE REGARDING LICENSE RENEWAL ACTIVITIES FOR CCNPP AND ONS On August 20, 1999, the U. S. Nuclear Regulatory Commission (NRC) staff held a public meeting with representatives of BGE and Duke at Rockville, Maryland, to discuss open item 3.0-1 in the BGE and Duke safety evaluation report (SER) written by the staff for their respective license renewal applications (LRA). Enclosure 1 to this meeting summary provides a list of the meeting attendees. Enclosure 2 provides a list of meeting objectives. Enclosure 3 contains the handouts provided by BGE during the meeting.
The NRC opened the meeting stating that the staff had invited both BGE and Duke to come in and share their perspectives regarding the process for updating the final safety analysis report (FSAR) supplements that were submitted with their LRAs to reflect the results of the staff's review and changes to the LRA so that there are appropriate controls over the pertinent information relied on by the staff to support their ability to make a 10 CFR 54.29 finding.
Mr. Matthews explained that the staff believes that, in providing a recommendation to the Commission regarding the issuance of a renewed license, the staff has an obligation to explain what information would ultimately be included as part of the updated FSAR that would be controlled by the processes established by 10 CFR 50.59.
BGE stated that their position regarding the need to update the FSAR supplement was the following:
.BGE felt that it met the requirements of Part 54 with respect to submittal of the FSAR supplement with its LRA That 54.29 conclusion did not require the FSAR supplement to be updated Finding for demonstration of aging management with respect to the integrated plant assessment was not predicated on updating the FSAR supplement Commitment processes provide configuration control on credited aging management programs BGE will update the FSAR in accordance with 50.71(e) to reflect changes due to 10 CFR Part 54 commitments.
Duke stated that it attended the meeting to gather information to resolve the open item in the SER for Oconee. Duke's FSAR supplement is different from that of BGE's. Therefore, Duke may not necessarily resolve the issue in accordance with BGE's position.
9910050005 990929 PDR ADOCK 05000269 P
-2 At the conclusion of the meeting the staff stated that it would bring the issues discussed at this meeting to an internal license renewal steering committee meeting held the following week. The NRC added that the results of these discussions would be shared with each applicant during the next monthly management meeting scheduled for August 27, 1999, and at that time the next step in reaching resolution of this open item would be discussed. Subsequent to the meeting the issue was discussed during the August 27, 1999, management meeting. See the meeting summary dated September 7, 1999, for further details regarding the resolution of this issue.
David L. Solorio, Project Manager License Renewal and Standardization Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Joseph M. Sebrosky, Project Manager License Renewal and Standardization Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 (BGE) 50-269, 50-270, and 50-287 (Duke)
Enclosures:
- 1. List of Attendees
- 2. Meeting Slides
- 3. BGE handout cc w/ encis: See next page DISTRIBUTION: See next page DOCUMENT NAME: G:\\RLSB\\SOLORIO\\JULY28TH 1999 BGE& DUKE MONTHLY MANAGEMENT MEETING SUM ARY.WPD See previous concurrence OFFICE LA RLSB RLSB RLSB:C DRIP:D NAME E Hylton
- DL Solorio
- JM Sebrosky
- Cl Grimes DB Matthews DATE 9/20/99 9/20/99 9/20/99 9/24/99 91"/99 OFFICIAL RECORD COPY
K, 0
-2 At the conclusion of the meeting the staff stated that it would bring the issWe<'discussed at this meeting to an internal license renewal steering committee meeting heldtAfe following week. The NRC added that the results of these discussions would be shared wi each applicant during the next monthly management meeting scheduled for August 27, 199, and at that time the next step in reaching resolution of this open item would be discusse. Subsqequent to the meeting the issue was discussed during the August 27, 1999, managem t meeting. See the meeting summary dated September 7, 1999, for further details reg ding the resolution of this issue.
David L. Solorio, Project Manager License Renewal and Standardization Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Joseph M. Sebrosky, Project Manager License Renewal and Standardization Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-317'and 50-318 (BGE) 50-269, 50-270, and 50-287 (Duke)
Enclosures:
- 1. List of Attendees
- 2. Meeting Slides
- 3. BGE handout cc w/ encs: See next page DISTRIBUTION: See next page Dcu NT NAME: GRLS\\SLRI'UULY28TH 1999 BGE& DUKE MONTHLY MANAGEMENT MEETING
SUMMARY
.WPD DOFICE LA RLSB RLSB RLSB:D AME n
DLSolorio JMSebrosky ClGrimes DATE 9/99
/iw9 9P/99
/ /99
[
OFFICIAL RECORD COPY
cb:
President Mr. Joseph H. Walter, Chief Engineer Calvert County Board of Public Service Commission of Commissioners Maryland 175 Main Street Engineering Division Prince Frederick, MD 20678 6 St. Paul Centre Baltimore, MD 21202-6806 James P. Bennett, Esquire Counsel Kristen A. Burger, Esquire Baltimore Gas and Electric Company Maryland People's Counsel P.O. Box 1475 6 St. Paul Centre Baltimore, MD 21203 Suite 2102 Baltimore, MD 21202-1631 Jay E. Silberg, Esquire Shaw, Pittman, Potts, and Trowbridge Patricia T. Birnie, Esquire 2300 N Street, NW Co-Director Washington, DC 20037 Maryland Safe Energy Coalition P.O. Box 33111 Mr. Bruce S. Montgomery, Director Baltimore, MD 21218 NRM Calvert Cliffs Nuclear Power Plant Mr. Loren F. Donatell 1650 Calvert Cliffs Parkway NRC Technical Training Center Lusby, MD 20657-4702 5700 Brainerd Road Chattanooga, TN 37411-4017 Resident Inspector U.S. Nuclear Regulatory Commission David Lewis P.O. Box 287 Shaw, Pittman, Potts, and Trowbridge St. Leonard, MD 20685 2300 N Street, NW Washington, DC 20037 Mr. Richard i. McLean Nuclear Programs Carl J. Yoder Power Plant Research Program Baltimore Gas and Electric Company Maryland Dept. of Natural Resources Calvert Cliffs Nuclear Power Plant Tawes State Office Building, B3 1650 Calvert Cliffs Parkway Annapolis, MD 21401 NEF 1st Floor Lusby, Maryland 20657 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. Charles H. Cruse, Vice President 475 Allendale Road Nuclear Energy Division King of Pruss-, PA 19406 Baltimore Gas and Electric Company 1650 Calvert Cliffs Parkway National Whistleblower Center Lusby, MD 20657-4702 3233 P Street, N.W.
Washington, DC 20007 6-St.-aul-entr
cc:
Ms. Lisa F. Vaughn Mr. Larry E. Nicholson Duke Energy Corporation Compliance Manager 422 South Church Street Duke Energy Corporation Mail Stop PB-05E Oconee Nuclear Site Charlotte, North Carolina 28201-1006 P. 0. Box 1439 Seneca, South Carolina 29679 Anne W. Cottingham, Esquire Winston and Strawn Ms. Karen E. Long 1400 L Street, NW.
Assistant Attorney General Washington, DC 20005 North Carolina Department of Justice P.O0. Box 629 Mr. Rick N. Edwards Raleigh, North Carolina 27602 Framatome Technologies Suite 525 L. A. Keller 1700 Rockville Pike Manager - Nuclear Regulatory Licensing Rockville, Maryland 20852-1631 Duke Energy Corporation 526 South Church Street Manager, LIS Charlotte, North Carolina 28201-1006 NUS Corporation 2650 McCormick Drive, 3rd Floor Mr. Richard M. Fry, Director Clearwater, Florida 34619-1035 Division of Radiation Protection North Carolina Department of Senior Resident Inspector Environment, Health, and U. S. Nuclear Regulatory Commission Natural Resources 7812B Rochester Highway 3825 Barrett Drive Seneca, South Carolina 29672 Raleigh, North Carolina 27609-7721 Regional Administrator, Region II Gregory D. Robison U. S. Nuclear Regulatory Commission Duke Energy Corporation Atlanta Federal Center Mail Stop EC-12R 61 Forsyth Street, SW, Suite 23T85 P. 0. Box 1006 Atlanta, Georgia 30303 Charlotte, North Carolina 28201-1006 Virgil R. Autry, Director Robert L. Gill Jr.
Division of Radioactive Waste Management Duke Energy Corporation Bureau of Land and Waste Management Mail Stop EC-12R Department of Health and P. 0. Box 1006 Environmental Control Charlotte, North Carolina 28201-1006 2600 Bull Street RLGILL@DUKE-ENERGY.COM Columbia, South Carolina 29201-1708 W. R. McCollum, Jr., Vice President Chattooga River Watershed Coalition Oconee Site P. 0. Box 2006 Duke Energy Corporation Clayton, GA 30525 P. 0. Box 1439 Seneca, SC 29679
cc:
Douglas J. Walters Nuclear Energy Institute 1776 1 Street, NW Suite 400 Washington, DC 20006-3708 Mr. David Lochbaum Union of Concerned Scientists 1616 P. St., NW Suite 310 Washington, DC 20036-1495
NRC Management Meeting to Discuss Status of BGE & Duke LRA Review July 28, 1999 Name Organization
- 1. Joe Sebrosky NRC/NRR/DRIP/RLSB
- 2. P. T. Kuo NRC/NRR/DRIP/RLSB
- 3. Sam Lee NRC/NRR/DRIP/RLSB
- 4. Janice Moore NRC/OGC
- 5. Jit Vora NRC/RES/DET/MEB
- 6. Christopher Gratton NRC/NRR/DSSA/SPLB
- 7. Jake Zimmerman NRC/NRR/DRIP/RLSB
- 8. Roger Huston Licensing Support Services
- 9. A. H. Hsa NRC/NRR/DE
- 10. Doris A. Martin NRC/OIG
- 11. Melvin Frank NUIS
- 12. M. Callahan GSI
- 13. Will Kenvorthy GSI
- 14. Jim Lang EPRI
- 15. Doug Walters NEI
- 16. Don Ferraro Winston & Strawn
- 17. Bill Cobbin Virginia Power
- 18. L. N. Hartz Virginia Power
- 19. Raymond D. Baker Southern Company
- 20. Charles R. Pierce Southern Nuclear
- 21. Ward Sproat PECO Energy
- 22. Fred Polaski PECO Energy
- 23. Nancy Chapman SERCH/Bechtel
- 25. Garry G. Young Entergy Operations
- 26. Louis Long Southern Nuclear
- 27. Raj Kundalkar Florida Power & Light
- 28. Steve Hale Florida Power & Light
- 29. Greg Robison Duke Energy Corporation
- 30. David Lewis Shaw Pittman
- 31. Don Shaw Baltimore Gas & Electric
- 32. Carl Yoder Baltimore Gas & Electric
- 33. Barth Doroshuk Baltimore Gas & Electric
- 34. David Matthews NRC/NRR/DRIP
Meeting Objective Statement Primary Objectives of this Meeting Are:
- 1.
To explore approaches with BGE & Duke to'most effectively address changes to the FSAR supplement, since the FSAR supplement was submitted to NRC, that have resulted from the staffs review of their LRAs, as well as, subsequent changes they have made to their current licensing basis so that there will be a clear understanding of the expectations between the NRC staff and the applicants that can be relied upon for the resolution of the open items and explanation to the Commission.
- 2.
To discuss the timing for incorporating changes to the FSAR.
- 3.
To discuss issues related to the content of FSAR supplement changes such as:
Level of detail of UFSAR update - should be adequately explained by 50.71(e) guidance How best to capture commitments made by applicants that the staff relied on'for making safety findings
Certain Baltimore Gas and Electric Company License Renewal Correspondence 4/8/98 Application for License Renewal 7/9/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated July 9, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Commodity Report for Cables" 7/30/98 Responses to Requests for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Reports for the Feedwater System and Diesel Fuel Oil System 8/6/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated August 6, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for Radiation Monitoring System" 8/11/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated August 11, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Component Cooling System" 8/21/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated August 21,1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Compressed Air System" 8/21/98 Letter from Mr. David L. Solorio (NRC) to Mr. Charles H. Cruse (BGE), dated August 21, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Auxiliary Feedwater System" 8/26/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated August 26, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Commodity Report for the Fuel Handling Equipment and Other Heavy Load Handling Cranes" 8/26/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated August 26, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 & 2, Integrated Plant Assessment Report for the Reactor Pressure Vessels and Control Element Drive Mechanism/Electrical" 8/27/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated August 27, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 & 2, Integrated Plant Assessment Report for the Emergency Diesel Generator System" 8/27/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated August 27, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment for the Component Cooling System" 8/27/98 Letter from Mr. D. L. Solorid (NRC) to Mr. C. H. Cruse (BGE), dated August 27, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment on Water Chemistry Program"
Certain Baltimore Gas and Electric Company License Renewal Correspondence 8/27/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated August 27, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for Scoping" 8/28/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated August 28, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Reports for the Saltwater Cooling System" 8/28/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated August 28, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report" 9/1/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 1, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Main Steam, Steam Generator Blowdown, Extraction Steam, and Nitrogen and Hydrogen Systems" 9/1/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 1, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. I & 2, Integrated Plant Assessment Report for the Feedwater System" 9/1/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 1, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 & 2, Integrated Plant Assessment Report for the Auxiliary Building Heating and Ventilation System, and the Control Room and Diesel Generator Buildings' Heating, Ventilation, and Air Conditioning System" 9/1/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 1, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 & 2, Integrated Plant Assessment Reports for the Auxiliary Feedwater System" 9/1/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 1, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Spent Fuel Pool Cooling System" 9/2/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 2, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment on Metal Fatigue" 9/2/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 2, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 & 2, Integrate Plant Assessment Reports for the Containment Isolation Group, Containment Spray System, and Primary Containment Heating and Ventilation System" 9/2/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 2, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for Fire Protection System"
Certain Baltimore as and Electric Company License inewal Correspondence 9/2/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 2, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Time-Limited Aging Analyses" 9/2/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 2, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Safety Injection System" 9/2/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 2, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Reactor Coolant System" 9/3/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 3, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 & 2, Integrated Plant Assessment Report for Reactor Vessel Internals Systems" 9/3/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 3, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 & 2, Integrate Plant Assessment Reports for the Containment Spray System" 9/3/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 3, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 & 2, Integrated Plant Assessment Report for the Service Water System" 9/3/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 3, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment for the Reactor Coolant System" 9/3/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 3, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment, Sections 4.1, 4.2, 5.2, 5.7, 5.15, and 5.16" 9/4/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 4, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment for Fire Protection System" 9/4/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 4, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment on Generic Safety Issues" 9/4/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 4, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. I & 2, Integrated Plant Assessment for Heating and Ventilation Systems" 9/7/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 7, 1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Sections 3.3A, 3.3B, 3.3C, 3.3D, 3.3E, and 6.2"
Certain Baltimore Gas and Electric Company License Renewal Correspondence 9/7/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 7, 1998, "Clarification Regarding Selected. Feedwater and Diesel Fuel Oil Requests for Additional Information Resulting from May 6, 1998, Meeting with:Baltimore Gas and Electric Company"~
9/7/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 7,1998, "Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 & 2, Commodity Reports for Component Supports and Piping Segments that Provide Structural Support" 9/17/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Commodity Report for Cables 9/24/98 Response to Request for Additional Information for the Review'of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Radiation Monitoring System 9/24/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated September 24, 1998, "Renumbering of NRC Requests for Additional Information on Calvert Cliffs Nuclear Power Plant License Renewal Application Submitted by the Baltimore Gas and Electric Company"~
10/2/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated November 2, 1998, "Clarification Regarding Selected Requests for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2, Integrated Plant Assessment on Metal Fatigue" 11/2/98 Responses to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment Report for the Compressed Air System 11/2/98 Responses to Requests for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment Report for the Auxiliary Feedwater System 11/2/98 Responses to Requests for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment for Scoping 11/2/98 Responses to Requests for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant Units 1.& 2, Integrated Plant Assessment Report for the Component Cooling System 11/2/98 Responses to Requests for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Reactor Coolant System 11/2/98 Responses to Requests for Additional Information, and Errata, for the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment Report for the Diesel Fuel Oil System 111/2/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment Report for the Saltwater System
Certain Baltimore Gas and Electric Company License Renewal Correspondence 11/2/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated November 2, 1998, "Clarification Regarding Selected Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 & 2, Integrated Plant Assessment on Metal Fatigue" 11/4/98 Responses to Requests for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Time-Limited Aging Analyses 11/4/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Diesel Fuel Oil System 11/4/98 Responses to Requests for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Containment Spray System 11/4/98 Response to Request for Additional Information, and Errata, for the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Chemical and Volume Control System 11/4/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Emergency Diesel Generator System 11/4/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment Report for the Fuel Handling Equipment and Other Heavy Load Handling Cranes 11/4/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment, Water Chemistry Program 11/4/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Safety Injection System 11/9/98 Responses to Requests for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Safety Injection System 11/9/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Containment Spray System, and Errata 11/12/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Containment Isolation Group 11/12/98 Responses to Power Plant, Units I & 2, Integrated Plant Assessment Report for the Saltwater System Requests for Additional Information, and Errata, for the Calvert Cliffs Nuclear 11/12/98 Responses to Requests for Additional Information, and Errata, for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment Report for the Feedwater System
Certain Baltimoretas and Electric Company License fnewal Correspondence 11/12/98 Responses to Requests for Additional Information, and Errata, for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Auxiliary Feedwater System 11/12/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Component Cooling System 11/12/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment, Generic Areas 11/13/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated November 13, 1998, "Clarification of Several NRC Requests for Additional Information on Calvert Cliffs Nuclear Power Plant License Renewal Application Submitted by the Baltimore Gas and Electric Company" 11/16/98 Responses to Requests for Additional Information, and Errata, for the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Main Steam, Steam Generator Blowdown, Extraction Steam, and Nitrogen and Hydrogen Systems 11/16/98 Response to Request for Additional Information for the Review of the Calvert iffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Fire Protection System, and Errata 11/16/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment Report for the Service Water System, and Errata 11/16/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Feedwater System 11/16/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Reports for Heating, Ventilation, and Air Conditioning Systems 11/17/98 Responses to Requests for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment Report for the Spent Fuel Pool Cooling System 11/18/98 Letter from Mr. D. L. Solorio (NRC) to Mr. C. H. Cruse (BGE), dated November 18, 1998, "Clarification of NRC Requests for Additional Information on Calvert Cliffs Nuclear Power Plant License Renewal Application Submitted by the Baltimore Gas and Electric Company s
11/19/98 Responses to Requests for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment on Metal Fatigue 11/19/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment on Generic Safety Issues 11/19/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Reactor Coolant System
Certain Baltimoro as and Electric Company License enewal Correspondence 11/19/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Reports for Component Supports and Piping Segments that Provide Structural Support, and Errata 11/19/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment Reports for the Reactor Coolant System and for the Reactor Pressure Vessels and Control Element Drive Mechanisms/Electrical System 11/19/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant Units 1 & 2, Integrated Plant Assessment Report for the Reactor Pressure Vessels and Control Element Drive Mechanism/Electrical System, and Errata 11/19/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant Units 1 & 2, Integrated Plant Assessment Report for the Reactor Vessel Internals System 11/19/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units I & 2, Integrated Plant Assessment Reports for Structures and Electrical Commodities, and Errata.
11/19/98 Request for an Extension of Response Dateto NRC Request for Additional Information Regarding Generic Letter 97-01, "Degradation of Control Rod Drive Mechanism Nzl and Other Vessel Closure Head Penetrations" Nzl 12/10/98 Response to Clarification Regarding Selected Requests for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Unit Nos. I & 2, Integrated Plant Assessment, Regarding Metal Fatigue 12/17/98 Response to Request for Additional Information for the Review of the Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for Como Reat PrSuprtees and ontr Elegmenht Drivie Mtrcta Suppcrcate, and Errata InformationpNeededfoResponse to Eva uftion oo Additional Infifation for License Renewal Apicto N e a
to te P l at,n i f ne at l Assessm ent Reports 12/10/98 Colamnta ystemonde fo the usio o
.. 2;Sse Reaoprsueesln otl ELmene DRenea Meplchainm/lcrclSse 2/19/9 Response to Request for Additional Information for the Review of the Calvert Ciffs Nuclear Power Plant, Units 1 & 2, Integrated Plant Assessment Report for the Reactor Pressure Vessels and Control Element Drive Mechanism/Electrical System, and Errata Re9 pmayon eenc toe all t l
Request for Additional Information for t es nse 3/0/99 PCoaert eAplUiation epor o nte Benew A
s 2/9/9Response to Request for Addciion Information dfor the Reve oftEvalertioCiff Enuclroer Puliatint 1o &ies 2,
eneate lan sesetRprsfrSrcuen 3//07questr or aonfextensio ofl Reons DateriNR Request for A dd1
- ,111:li i1 ii l inomtiona Information 9
ReSoneto Cvlarfation ReardiongSlceReussfrAdtoaInrminfr the GLR
Certain Baltimore Gas and Electric Company License Renewal Correspondence 3/11/99 Revision 1 for License Renewal Application Section 6.2, Electrical Commodities 3/19/99 Summary of February 10, 1999, Meeting with Baltimore Gas and Electric Company (BGE)
Regarding License Renewal Activities for Calvert Cliffs.Nuclear Power Plant, Unit Nos. 1 and 2 3/19/99 Summary of February 16 and18, 1999, Meetings with Baltimore Gas and Electric Company (BGE) Regarding License Renewal Activities for Calvert Cliffs Nuclear Power Plant (CCNPP), Unit Nos. I and 2 4/2/99 First Annual Amendment to Application for License Renewal 5/18/99 Summary of May 5, 1999, and May 10, 1999, Telephone Calls Between the U. S. Nuclear Regulatory Commission (NRC) Staff and BGE Representatives to Discuss the BGE License Renewal Application Regarding Metal Fatigue 6/14/99 Summary of May 12 1999, Meeting with Baltimore Gas and Electric Company (BGE)
Regarding License Renewal Activities for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 6/24/99 Summary of December 16, 1998 Meeting with Baltimore Gas and Electric Company (BGE)
Regarding License Renewal Activities for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 6/24/99 Summary of December 3, 1998,Meeting with Baltimore Gas and Electric Company (BGE)
Regarding Evaluation of Cast Austenitic Stainless Steel Components to Support License Renewal Application for Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2 7/1/99 Summary of March 30, 1999 Meeting with Baltimore Gas and Electric Company (BGE)
Regarding License Renewal Activities for Calvert Cliffs Nuclear Power Plant Unit Nos. 1 and 2 7/1/99 Summary of January 14, 1999, Meeting with Baltimore Gas and Electric Company (BGE)
Regarding License Renewal Activities for Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2 G9 Response to License Renewal Safety Evaluation Report Response to License Renewal Safety Evaluation Report - Review Comments
DISTRIBUTION:
Hard Copy (Docket File LPUBLIC RLSB R/F N. Dudley, ACRS - T2E26 E. Hylton E-mail R. Zimmerman M. Evans D. Matthews R. Bores S. Newberry S. Stewart,.
C. Grimes F. Bower C. Carpenter B. Latta B. Zalcman M. Modes J. Strosnider R. Emch R. Wessman D. LaBarge E. Imbro L. Plisco W. Bateman C. Ogle J. Calvo R. Trojanowski R. Weisman D. Billings T. Hiltz C. Julian G. Holahan J. Peralta T. Collins J. Wilson C. Gratton C. Sochor B. Boger M. Shannon J. Rutberg R. Correia D. Walters, NEI J. Moore R. Gill, Duke M. Mayfield S. Bahadur N. Chokshi J. Vora A. Murphy D. Martin W. McDowell S. Droggitis RLSB Staff S. Bajwa A. Dromerick T. Kenyon K. Leigh W. Cook