Text
0
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION il
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
In Reply Refer To:
FEB 2 0 1980
RII:FJ
50-269/80-5
50-270/80-4
50-287/80-4
Duke Power Company
ATTN: W. 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by F. Jape of this office on January 7-31,
1980, of activities authorized by NRC Operating License Nos. DPR-38, DPR-47 and
DPR-55 for the Oconee facility, and to the discussion of our findings held with
J. E. Smith at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection it was found that certain activities under your license
appear to deviate from commitments to the Commission and have safety significance.
This item is identified in the Notice of Deviation enclosed herewith as Appendix A.
Please provide us in writing within 20 days of your receipt of this letter your
comments including a description of corrective actions that have been or will be
taken, corrective actions which will be taken to avoid further deviations, and
the date corrective actions were or will be completed.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you (or your contractor) believe to be
proprietary, it is pecessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
A004250
Duke Power Company
-2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Deviation
2.
Inspection Report Nos. 50-269/80-5,
50-270/80-4 and 50-287/80-4
cc w/encl:
J. E. Smith, Station Manager
P. 0. Box 1175
Seneca, SC 29678