ML15224A402
| ML15224A402 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/02/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML15224A400 | List: |
| References | |
| NUDOCS 8108040320 | |
| Download: ML15224A402 (2) | |
See also: IR 05000269/1981008
Text
e ftg REG(Z o"
UNITED STATES
OFFICIAL COPY
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
JUN
2 1981
Duke Power Company
ATTN:
Mr. W. 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
Charlotte, NC
28242
Gentlemen:
Subject: Report Nos. 50-269/81-08, 50-270/81-08 and 50-287/81-08
This refers to the routine safety inspection conducted by Mr. N. Economos of
this office on April 28 - May 1, 1981, of activities authorized by NRC Operating
License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee facility. Our preliminary
findings were discussed with Mr. J. E. Smith, Station Manager, at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas,
the inspection consisted of
selective examinations of procedures and representative records, interviews with
.
personnel, and observations by the inspector.
During the inspection, it
was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen
dix A. Elements to be included in your response are delineated in Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from disclo
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telephone within ten days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five days from the date
of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven days
are available for your review, please notify this office promptly so that a new
due date may be established. Consistent with section 2.790(b)(1), such applica
tion must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part thereof sought to be withheld, and a full
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure.
This section further requires the
statement to address with specificity the considerations listed in 10 CFR
810804032 0 810721
PDR ADOCK 05000269
Q
JUN
21981
Duke Power Company
2
2.790(b)(4). The information sought to be withheld shall be incorporated as far
as possible into a separate part of the affidavit. If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. ewis, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Appendix A, Notice of Violation
cc w/encl:
J. E. Smith, Station Manager