Notice of Violation from Insp on 810428-0501
ML15224A403
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/02/1981
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML15224A400 List:
References
50-269-81-08, 50-269-81-8, 50-270-81-08, 50-270-81-8, 50-287-81-08, 50-287-81-8, NUDOCS 8108040325
Download: ML15224A403 (1)


Text

APPENDIX A NOTICE OF VIOLATION Duke Power Company Docket Nos. 50-269, -270 & -287 Oconee 1, 2, & 3 License Nos. DPR-38, -47 & -55 As a result of the inspection conducted on April 28 - May 1, 1981, and in accord ance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified.

10 CFR 50, Appendix B, Criterion V as implemented by Topical Report Duke 1-A, Section 17.1.5 requires in part that activities affecting quality shall be accomplished in accordance with the requirements imposed by instructions, procedures and drawings. Paragraph 10 of Procedure MO IP/O/A/3010/04 Change 2, requires the documentation of welding filler material - type and heat number on designated forms or on work requests.

Contrary to the above, activities affecting quality were not being accomp lished in accordance with procedures in that welding on two cable support

.type hangers No.

HSF-13 and HSF-14 on drawing No.

0944B inside the Safe Shutdown Facility building had been performed and completed on the previous day, April 30, 1981, without documenting the welding filler material on the appropriate forms.

This is a Severity Level VI Violation (Supplement I.E).

Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within twenty-five days of the date of this Notice, a written state ment or explanation in reply, including: (1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.