NL-15-0979, E.I. Hatch - Registration of Spent Fuel Cask Use

From kanterella
(Redirected from ML15155B500)
Jump to navigation Jump to search
E.I. Hatch - Registration of Spent Fuel Cask Use
ML15155B500
Person / Time
Site: Hatch, 07200036, Holtec  Southern Nuclear icon.png
Issue date: 06/04/2015
From: Pierce C
Southern Co, Southern Nuclear Operating Co
To:
Document Control Desk, NRC/NMSS/SFST
References
NL-15-0979
Download: ML15155B500 (2)


Text

Charles R. Pierce Southern Nuclear Regulatory Affairs Director Operating Company, Inc.

40 Inverness Center Parkway A

Post Office Box 1295 Birmingham, AL 35242 Tel 205.992.7872 Fax 205.992.7601 SOUTHERN OMPANY June 4, 2015 Docket Nos.: 50-321 NL-15-0979 50-366 72-36 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Registration of Spent Fuel Cask Use Ladies and Gentlemen:

Southern Nuclear Operating Company (SNC) operates the Edwin I. Hatch Nuclear Plant (Hatch) Independent Spent Fuel Storage Installation (ISFSI) in accordance with the general license provisions of 10 CFR 72.210. The requirements of 10 CFR 72.212(b)(2} include the registration of a spent fuel cask within 30 days of using a cask for the storage of spent nuclear fuel. Accordingly, SNC provides the following registration information associated with the HI-STORM 100 spent fuel cask systems recently placed into storage.

Cask Certificate: 72-1014, Amendment 9 Cask Model: HI-STORM 1OOS, Version 8 MPC Serial Number: 465 Overpack Serial Number: 827 Number of Fuel Bundles: 68 Placed in Service: May 22,2015 The addition of the above cask results in the following totals for the Hatch ISFSI:

3 HI-STAR 100 Cask Systems 59 HI-STORM 100 Cask Systems

U.S. Nuclear Regulatory Commission NL-15-0979 Page2 This letter contains no NRC commitments. If you have any questions, please contact Greg Johnson at (912) 537-5874 C. R. Pierce Regulatory Affairs Director CRP/cdp/lac cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bast, Executive Vice President & Chief Nuclear Officer Mr. D. R. Vineyard, Vice President- Hatch Mr. M. D. Meier, Vice President- Regulatory Affairs Mr. D. R. Madison, Vice President- Fleet Operations Mr. B. J. Adams, Vice President- Engineering Mr. G. L. Johnson, Regulatory Affairs Manager- Hatch RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager - Hatch Mr. D. H. Hardage, Senior Resident Inspector- Hatch