ML15139A338

From kanterella
Jump to navigation Jump to search
Submittal of Updated Final Safety Analysis Report - Unit 4 Cycle 27 Update and License Renewal 10 CFR 54.37(b) Report
ML15139A338
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/22/2015
From: Kiley M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15139A340 List:
References
L-2015-138
Download: ML15139A338 (3)


Text

0 FPL 10 CFR §50.71(e)L-2015-138 April 22, 2015 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Updated Final Safety Analysis Report -Unit 4 Cycle 27 Update and License Renewal 10 CFR 54.37(b) Report Florida Power & Light Company (FPL) has completed the Unit 4 Cycle 27 (4C27) update of the Turkey Point Units 3 and 4 Updated Final Safety Analysis Report (UFSAR) and its review of design activities to identify any new systems, structures, and components for potential impact on its license renewal aging management programs.

This letter submits both the periodic update of the UFSAR and the results of the license renewal review in accordance with the requirements of 10 CFR 50.71(e) and 10 CFR 54.37(b), respectively.

The enclosed DVD accurately reflects plant changes made since the previous update (Unit 4 Cycle 26). This update incorporates changes for the period covering April 17, 2013 through October 22, 2014. Miscellaneous user comments obtained during this period have also been incorporated.

The Turkey Point UFSAR is maintained as an electronic "living" document.

Changes are made as they meet appropriate incorporation requirements enhancing our ability to maintain the Turkey Point licensing basis current. This UFSAR update is a snapshot of our continually revised UFSAR. Accordingly, Turkey Point identifies periodic UFSAR updates required by 10 CFR 50.71(e) as Unit 4 cycle-specific updates, consistent with our existing UFSAR update commitment linked to completion of each Unit 4 refueling outage (10 CFR 50.71(e)(4) exemption dated July 16, 1998). Revised pages are annotated in the lower right comer by dates ranging throughout the update period, based on the date the changes on each page were incorporated.

The cycle designator (C27) is provided with the revision bar to identify changed portions.A single DVD containing this document is submitted in lieu of hard copies, consistent with Florida Power & Light Company if 9760 SW 3 4 4 th St., Florida City, FL 33035 Florida Power & Light Company Turkey Point Nuclear Plant L-2015-138 UFSAR Update Unit 4 Cycle 27 Page 2 of 3 previous UFSAR updates (last submitted on October 16, 2013 and resubmitted on December 19, 2013). This UFSAR supersedes all previous copies of the document.

It is labeled "Turkey Point UFSAR 4C27." File counts are as follows: 22 UFSAR Files (includes Start file), publicly available.

The UFSAR Data files are itemized as follows: LOEP.pdf 001CHAPTER_1 .pdf 002CHAPTER_2.pdf 003CHAPTER_3.pdf 004CHAPTER_4.pdf 005CHAPTER_5.pdf 006CHAPTER_6.pdf 007CHAPTER_7.pdf 008CHAPTER_8.pdf 009CHAPTER_9.pdf 010CHAPTER_10.pdf 011CHAPTER_1l.pdf 012CHAPTER_12.pdf 013CHAPTER_13.pdf 014CHAPTER_14.pdf 015 CHAPTER_14AG.pdf 016CHAPTER_15.pdf 017CHAPTER_

16.pdf 018AA.pdf 019AB.pdf App9.6a.pdf Start.pdf 119 KB 3,634 KB 2,304 KB 14,081 KB 2,292 KB 39,392 KB 2,643 KB 6,934 KB 1,310 KB 2,706 KB 202 KB 1,597 KB 67 KB 18 KB 30,262 KB 5,662 KB 13 KB 181 KB 68 KB 31 KB 1,101 KB 9,970 KB The entire UFSAR is PDF Normal; therefore, the full text index should be considered highly reliable.

It is recommended that the UFSAR be opened via launching the "start.pdf' file.Thereafter, all chapter navigation can be done within Acrobat Reader.Also enclosed is another DVD that contains the drawings referenced in the UFSAR. This DVD is submitted for information only and is not part of the update required by 10 CFR 50.71(e) and it is labeled "Turkey Point Drawings Referenced in UFSAR 4C27". The included drawings are a mixture of PDF Normal and Scanned Image PDF. There are eleven (11) drawing files plus an index.

Florida Power & Light Company L-2015-138 Turkey Point Nuclear Plant UFSAR Update Unit 4 Cycle 27 Page 3 of 3 License Renewal 10 CFR 54.37(b) Report The license renewal review addressed the requirements of 10 CFR 54.3 7(b) for the period current UFSAR Update period April 17, 2013 through October 22, 2014. The review effort included items noted in the NRC Regulatory Issue Summary (RIS) 2007-16, Revision 1,"Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses," as well as UFSAR revised text, plant changes/modifications installed, and item equivalency evaluations.

This review did not result in any newly identified systems, structures, and components per the requirements of 10 CFR 54.37(b).If you have any questions, please contact Mr. Mitch Guth at 305-246-6698.

Very truly yours, Michael Kiley Vice President Turkey Point Nuclear Plant

Enclosures:

DVD, Turkey Point UFSAR 4C27 DVD, Turkey Point Drawings Referenced in UFSAR 4C27 (For Information Only)cc: Regional Administrator

-USNRC Region II (letter only)USNRC Senior Resident Inspector

-Turkey Point (letter only)USNRC Project Manager -Turkey Point