Summary of the License Renewal Environmental Audit for LaSalle County Station, Units 1 and 2 (TAC Nos. MF5567 and MF5568)
ML15132A674
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/20/2015
From: Brian Wittick
License Renewal Projects Branch 2
To: Gallagher M
Exelon Generation Co
Drucker D, 415-6223
References
TAC MF5567, TAC MF5568
Download: ML15132A674 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 20, 2015 Mr. Michael P. Gallagher Vice President, License Renewal Projects Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348

SUBJECT:

SUMMARY

OF THE LICENSE RENEWAL ENVIRONMENTAL AUDIT FOR LASALLE COUNTY STATION, UNITS 1 AND 2 (TAC NOS. MF5567 AND MF5568)

Dear Mr. Gallagher:

From May 5-7, 2015, a review team consisting of staff from the U.S. Nuclear Regulatory Commission (NRC or the staff) participated in a site audit at LaSalle County Station (LSCS),

Units 1 and 2, as part of the license renewal application environmental review. The goal of the audit was to review documentation and gather information to ensure that the environmental requirements for license renewal, as codified in Title 10 of the Code of Federal Regulations Part 51 were met. A letter dated April 28, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15106A392) was sent to you containing an audit plan (ML15105A381). The enclosure is a list of representatives from the NRC and Exelon Generation Company, LLC (Exelon) who participated in the audit.

An entrance meeting was held on May 5, 2015, to introduce participants and discuss audit logistics. Following the entrance meeting, the environmental review team participated in a general site tour of LSCS. The general site tour provided an overview and orientation of the site areas relevant to the environmental review.

During the remainder of the site audit, the environmental review team examined data used by Exelon in preparation of the environmental report and met in smaller groups with Exelon representatives to address the staff-specific audit needs identified in the audit plan. These groups participated in various activities, including documentation review, area focused tours, and interviews with cognizant personnel. Specific tours were conducted for air emissions, noise sources, cultural resources, surface water and groundwater resources, radiological and non-radiological waste, terrestrial ecology, aquatic ecology, special status species and habitats, and radiological monitoring.

The environmental review team members also met with the NRC resident inspectors and offsite with local officials from the Illinois Historic Preservation Agency, for information gathering purposes to assist the staff in developing the draft Supplemental Environmental Impact Statement (DSEIS) for LSCS.

M. Gallagher At the conclusion of the site audit, the NRC staff summarized the status of the review with Exelon representatives during the exit meeting. Most of the team's questions identified in the audit plan or during the audit were answered through the conduct of the audit. Those that were not will be answered by Exelon, as it responds to a request for additional information (RAI) letter to be issued subsequently. The RAl letter will also contain documents requested by the team during the site audit. These documents will be made publicly available in ADAMS at http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC's Public Document Room staff at 800-397-4209 (or 301-415-4737) or by e-mail at pdr.resource@nrc.gov.

While the NRC review team did not identify any significant environmental issues during its site audit or during the meetings with other participants, the team indicated that the environmental review was ongoing and that any additional information necessary to support the review would be formally requested via the RAI process, during the course of the review.

Sincerely,

/RA/

Brian D. Wittick, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374

Enclosure:

As stated cc w/encl: Listserv

ML15132A674 (Letter) *concurred via e-mail OFFICE LA:DLR:RPB2* PM:RPB2:DLR BC:RPB2:DLR NAME SWoods DDrucker BWittick DATE 5/15/2015 5/20/2015 5/20/15

Letter to Michael Gallagher from Brian D. Wittick dated May 20, 2015

SUBJECT:

SUMMARY

OF THE LICENSE RENEWAL ENVIRONMENTAL AUDIT FOR LASALLE COUNTY STATION, UNITS 1 AND 2 (TAC NOS. MF5567 AND MF5568)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMLaSalle Resource


J. Mitchell R. Plasse Y. Diaz-Sanabria D. Drucker B. Wittick J. Wachutka, OGC D. McIntyre, OPA M. Kunowski, RIII V. Mitlyng, RIII P. Chandrathil, RIII H. Logaras, RIII C. Lipa, RIII S. Sheldon, RIII J. Robbins, RIII R. Ruiz, RIII

LASALLE COUNTY STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION REVIEW ENVIRONMENTAL AUDIT May 5-7, 2015 PARTICIPANT ORGANIZATION David Drucker U.S. Nuclear Regulatory Commission (NRC)

Brian Wittick NRC Nancy Martinez NRC Bill Rautzen NRC Michelle Moser NRC Bill Ford NRC Kevin Folk NRC Briana Grange NRC Bob Hoffman NRC Russ Chazell NRC Mike Gallagher Exelon Generation Company, LLC (Exelon)

Peter Karaba Exelon Nancy Ranek Exelon Christine Kinkead Exelon Cortney Scheidt Exelon John Keenan Exelon Mohamad Fakhreddine Exelon Rachael Conley Exelon John Kowalski Exelon Guy Ford Exelon Harold Vinyard Exelon Kevin Hersey Exelon Nick DeFisher Exelon Heather Meyer Exelon Bill Buinickas Exelon Lisa Matis Exelon ENCLOSURE