Letter Sequence ' |
|---|
|
|
MONTHYEARIR 05000269/19950201995-11-0101 November 1995 Insp Repts 50-269/95-20,50-270/95-20 & 50-287/95-20 on 950910-1007.No Violations Noted.Major Areas Inspected: Plant Operation,Maint & Surveillance Testing Project stage: Request ML16141A9851995-12-22022 December 1995 Forwards RAI to Clarify Issues Re Emergency Electrical Sys at Plant & Results of Plant Reliability Analysis.Nrc Has Attempted to Identify Questions That Util Should Place Higher Priority When Allocating Resources Project stage: RAI ML15117A3431996-06-21021 June 1996 Requests Encl Matl Be Placed in Public Document Files for Plant,Units 1,2 & 3 Project stage: Other ML15117A3501996-07-0101 July 1996 Requests That Attached Documents Be Place in PDR File for Plant Units 1,2 & 3 Project stage: Other ML15118A4421996-07-0808 July 1996 Forwards Draft Analyses by NRR & AEOD on Design & Operational Characteristics of Emergency Electrical Supply Sys for Plants.Meeting to Discuss Comments Will Be Scheduled within 60 Days of Ltr,To Be Followed by Final Rept ML15117A3521996-07-0909 July 1996 Forwards Chart of Unresolved Items to Be Inserted Into Public Docket File Project stage: Other IA-94-002, Informs of Closeout of TIA-94-002, Review of Oconee Emergency Electrical Power Sys Probabilistic Risk Assessment Model Analysis1996-07-17017 July 1996 Informs of Closeout of TIA-94-002, Review of Oconee Emergency Electrical Power Sys Probabilistic Risk Assessment Model Analysis Project stage: Approval ML15118A4481996-09-26026 September 1996 Summary of Meeting W/Dpc on 960919 at Oconee Nuclear Station Re Emergency Electrical Distribution Sys Draft Repts Prepared by NRR & Aeod.List of Attendees Encl ML15238A3681997-02-18018 February 1997 Discusses Status of Preparation of Emergency Power Sys Repts for Plant,Units 1,2 & 3 Project stage: Other ML20137Z5171997-04-22022 April 1997 Forwards RAI Re Plants Response to NRR Draft Rept on Plant Emergency Power Sys Project stage: Draft RAI IR 05000269/19970031997-05-22022 May 1997 Insp Repts 50-269/97-03,50-270/97-03 & 50-287/97-03 on 970421-24.No Violations Noted.Major Areas Inspected:Plant Support Project stage: Request ML15112A5491998-01-15015 January 1998 Forwards RAI Re Oconee Emergency Electrical Distribution Sys Rept.Info Requested within 30 Days of Date of Ltr Project stage: RAI ML15112A5541998-01-22022 January 1998 Forwards RAI Re Util Response to NRR Draft Rept on Plant Emergency Power Sys.Response Requested within 30 Days of Receipt of Ltr Project stage: Draft RAI ML15112A5581998-01-26026 January 1998 Forwards RAI Re 961031 Response to NRR Draft Rept on Plant Emergency Power Sys, .Response Requested within 30 Days of Receipt of Ltr Project stage: Draft RAI ML15113A4401998-03-17017 March 1998 Discusses DPC 961031 Response to NRR 960708 Draft Rept on ONS Emergency Eletrical Sys & Results of Tests Conducted by DPC of EP & Engineered Safeguards Sys.Forwards Interim Rept on ONS Emergency Electrical Power Sys & Related Matters Project stage: Draft Other 1996-09-26
[Table View] |
"Draft Meeting" is not in the list (Request, Draft Request, Supplement, Acceptance Review, Meeting, Withholding Request, Withholding Request Acceptance, RAI, Draft RAI, Draft Response to RAI, ...) of allowed values for the "Project stage" property.
Text