ML15118A442

From kanterella
Jump to navigation Jump to search

"Draft Meeting" is not in the list (Request, Draft Request, Supplement, Acceptance Review, Meeting, Withholding Request, Withholding Request Acceptance, RAI, Draft RAI, Draft Response to RAI, ...) of allowed values for the "Project stage" property.

Forwards Draft Analyses by NRR & AEOD on Design & Operational Characteristics of Emergency Electrical Supply Sys for Plants.Meeting to Discuss Comments Will Be Scheduled within 60 Days of Ltr,To Be Followed by Final Rept
ML15118A442
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/08/1996
From: Russell W
NRC (Affiliation Not Assigned)
To: Hampton J
DUKE POWER CO.
Shared Package
ML15118A443 List:
References
TAC-M86217, TAC-M86218, TAC-M86219, TAC-M93550, NUDOCS 9607150174
Download: ML15118A442 (143)


Text