ML15112A686
| ML15112A686 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/20/1998 |
| From: | Joseph Sebrosky NRC (Affiliation Not Assigned) |
| To: | Mccollum W DUKE POWER CO. |
| References | |
| NUDOCS 9811250122 | |
| Download: ML15112A686 (4) | |
Text
November 20, 19 Mr. William R. McCollum, Jr.
Vice President, Oconee Nuclear Site Duke Energy Corporation P. 0. Box 1439 Seneca, SC 29679
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION
Dear Mr. McCollum:
By letter dated July 6, 1998, Duke Energy Corporation (Duke) submitted for the Nuclear Regulatory Commission's (NRC's) review an application pursuant to 10 CFR Part 54, to renew the operating licenses for the Oconee Nuclear Station (Oconee), Units 1, 2, and 3. Exhibit A to the application is the Oconee Nuclear Station License Renewal Technical Information Report (OLRP-1 001), which contains the technical information required by 10 CFR Part 54. The NRC staff is reviewing the information contained in OLRP-1001 and has identified, in the enclosure, areas where additional information is needed to complete its review. Specifically, the enclosed questions are from the Mechanical Engineering Branch regarding Sections 3.4.4 and 3.5.5 of OLRP-1001.
Please provide a schedule by letter, electronic mail, or telephonically for the submittal of your responses within 30 days of the receipt of this letter. Additionally, the staff would be willing to meet with Duke prior to the submittal of the responses to provide clarifications of the staff's requests for additional information.
Sincerely, original signed by:
Joseph M. Sebrosky, Project Manager License Renewal Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION: See next page DOCUMENT NAME:G:\\SEBROSKY\\RAI9.WPD OFFICE LA PM:PDLR PDLR:D NAME LBerry JSebrosky ClGrimes DATE 11/1/98 11/ t 198 11/7o/98 OFFICIAL RECORD COPY 9811250122 981120 PDR ADOCK 05000269 P
POR
Oconee Nuclear Station (License Renewal) cc:
Paul R. Newton, Esquire Duke Energy Corporation Mr. J. E. Burchfield 422 South Church Street Compliance Manager Mail Stop PB-05E Duke Energy Corporation Charlotte, North Carolina 28201-1006 Oconee Nuclear Site P. 0. Box 1439 J. Michael McGarry, Ill, Esquire Seneca, South Carolina 29679 Anne W. Cottingham, Esquire Winston and Strawn Ms. Karen E. Long 1400 L Street, NW.
Assistant Attorney General Washington, DC 20005 North Carolina Department of Justice P. 0. Box 629 Mr. Rick N. Edwards Raleigh, North Carolina 27602 Framatome Technologies Suite 525 L. A. Keller 1700 Rockville Pike Manager - Nuclear Regulatory Licensing Rockville, Maryland 20852-1631 Duke Energy Corporation 526 South Church Street Manager, LIS Charlotte, North Carolina 28201-1006 NUS Corporation 2650 McCormick Drive, 3rd Floor Mr. Richard M. Fry, Director Clearwater, Florida 34619-1035 Division of Radiation Protection North Carolina Department of Senior Resident Inspector Environment, Health, and U. S. Nuclear Regulatory Commission Natural Resources 7812B Rochester Highway 3825 Barrett Drive Seneca, South Carolina 29672 Raleigh, North Carolina 27609-7721 Regional Administrator, Region II Gregory D. Robison U. S. Nuclear Regulatory Commission Duke Energy Corporation Atlanta Federal Center Mail Stop EC-12R 61 Forsyth Street, SW, Suite 23T85 P. 0. Box 1006 Atlanta, Georgia 30303 Charlotte, North Carolina 28201-1006 Virgil R. Autry, Director Robert L. Gill, Jr.
Division of Radioactive Waste Management Duke Energy Corporation Bureau of Land and Waste Management Mail Stop EC-12R Department of Health and P. 0. Box 1006 Environmental Control Charlotte, North Carolina 28201-1006 2600 Bull Street RLGILL@DUKE-ENERGY.COM Columbia, South Carolina 29201-1708 Douglas J. Walters County Supervisor of Oconee County Nuclear Energy Institute Walhalla, South Carolina 29621 1776 I Street, NW Suite 400 Washington, DC 20006-3708 Chattooga River Watershed Coalition DJW@NEI.ORG P. 0. Box 2006 Clayton, GA 30525
REQUEST FOR ADDITIONAL INFORMATION OCONEE NUCLEAR STATION, UNITS 1. 2. AND 3 LICENSE RENEWAL APPLICATION, EXHIBIT A OLRP-1001 Section No.
3.4.4 Pressurizer 3.4.4-1 Section 3.4.3 of the license renewal application references report BAW-2243A.
Section 3.4.4 references BAW-2244A. These reports do not address specific time limited aging analyses for the reactor coolant system piping or for the pressurizer. It is left up to the individual plant to address this issue. Therefore, for Oconee Units 1, 2, and 3, we request that you provide a demonstration that the ASME Code Section III cumulative usage factor for all Reactor Coolant System Piping and Pressurizer Class 1 components will be less than or equal to 1.0 for 60 years of plant operation.
3.5.5 Emergency Core Cooling Systems 3.5.5-1 Show that the ASME Code Section III cumulative usage factor for all High Pressure Injection (HPI) System Class 1 piping and components in Oconee Units 1, 2, and 3, will be less than or equal to 1.0 for 60 years of plant operation, considering the thermal cycling effects of the following events:
- a. Unanticipated outleakage in HPI/El (emergency injection) lines, described in NRC Bulletin 88-08.
- b. "Warming" make-up flow in HPI/NMU (normal makeup) lines, described in NRC Information Notice 97-46.
Enclosure
DISTRIBUTION: Hard copy Docket File PUBLIC PDLR RF M. EI-Zeftawy ACRS T2E26 E-mail:
F. Miraglia M. Hartzman J. Roe D. Matthews C. Grimes T. Essig G. Lainas J. Strosnider G. Bagchi H. Brammer T. Hiltz G. Holahan S. Newberry C. Gratton L. Spessard R. Correia R. Latta J. Peralta J. Moore R. Weisman M. Zobler E. Hackett A. Murphy T. Martin D. Martin W. McDowell S. Droggitis PDLR Staff M. Banic G. Hornseth H. Berkow D. LaBarge L. Plisco C. Ogle R. Trojanowski M. Scott C. Julian R. Architzel J. Wilson R. Wessman E. Sullivan R. Gill, Duke D. Walters, NEI