Shine Medical Technologies V. 0 - Chapter 14 - Technical Specifications
ML15092A336
Person / Time
Site: SHINE Medical Technologies
Issue date: 03/23/2015
From: Bynum R
Shine Medical Technologies
To:
Office of Nuclear Reactor Regulation
Lynch S
References
SHINE, SHINE.SUBMISSION.10, SHN.PSAR.P, SHN.PSAR.P.4
Download: ML15092A336 (30)


Text

Chapter 14 - Technical Specifications Table of Contents CHAPTER 14 TECHNICAL SPECIFICATIONS Table of Contents Section Title Page 14a1 HETEROGENEOUS REACTOR TECHNICAL SPECIFICATIONS .............14a1-1 14a2 IRRADIATION FACILITY TECHNICAL SPECIFICATIONS.........................14a2-1 14a

2.1 INTRODUCTION

.........................................................................................14a2-2 14a2.2 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS................14a2-3 14a2.3 LIMITING CONDITIONS FOR OPERATION ...............................................14a2-4 14a2.4 SURVEILLANCE REQUIREMENTS............................................................14a2-5 14a2.5 DESIGN FEATURES ...................................................................................14a2-6 14a2.6 ADMINISTRATIVE CONTROLS ..................................................................14a2-7 14a

2.7 REFERENCES

............................................................................................14a2-18 14b TECHNICAL SPECIFICATIONS OF PROCESSES OUTSIDE THE IRRADIATION FACILITY .............................................................................14b-1 14b.1 INTRODUCTION .........................................................................................14b-1 14b.2 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS................14b-2 14b.2.1 SAFETY LIMITS FOR PROCESSING IRRADIATED SPECIAL NUCLEAR MATERIAL OUTSIDE OF THE REACTOR ...............................14b-2 14b.2.2 SAFETY LIMITS FOR PROCESSING UNIRRADIATED SPECIAL NUCLEAR MATERIAL OUTSIDE OF THE IRRADIATION FACILITY ........14b-2 14b.2.3 SAFETY LIMITS FOR RADIOCHEMICAL PROCESSING ..........................14b-2 14b.2.4 SAFETY LIMITS FOR CHEMICAL PROCESSING .....................................14b-2 14b.2.5 LIMITING SAFETY SYSTEM SETTINGS....................................................14b-2 14b.3 LIMITING CONDITIONS FOR OPERATION ...............................................14b-3 14b.3.1 PRIMARY PROCESS COMPONENTS AND SYSTEMS.............................14b-3 14b.3.2 CONTAINMENT AND CONFINEMENT.......................................................14b-3 14b.3.3 VENTILATION SYSTEMS ...........................................................................14b-3 14b.3.4 EMERGENCY ELECTRICAL POWER ........................................................14b-3 14b.3.5 RADIATION MONITORING SYSTEMS AND EFFLUENTS ........................14b-3 14b.4 SURVEILLANCE REQUIREMENTS............................................................14b-4 14b.5 DESIGN FEATURES ...................................................................................14b-5 14b.6 ADMINISTRATIVE CONTROLS ..................................................................14b-6 14b.7 REFERENCES ............................................................................................14b-7 SHINE Medical Technologies 14-i Rev. 0

Chapter 14 - Technical Specifications List of Tables List of Tables Number Title 14a2-1 SHINE Facility Proposed Parameters for Technical Specifications SHINE Medical Technologies 14-ii Rev. 0

Chapter 14 - Technical Specifications List of Figures List of Figures Number Title None SHINE Medical Technologies 14-iii Rev. 0

Chapter 14 - Technical Specifications Acronyms and Abbreviations Acronyms and Abbreviations Acronym/Abbreviation Definition 10 CFR Title 10 of the Code of Federal Regulations ANS American Nuclear Society ANSI American National Standards Institute IF irradiation facility IROFS item relied on for safety ISA Integrated Safety Analysis IU irradiation unit LCO limiting condition of operation LSSS limiting safety system setting LWPS light water pool system NGRS noble gas removal system PCLS primary closed loop cooling system PSB primary system boundary PVVS process vessel vent system RCA radiologically controlled area RPF radioisotope production facility RVZ1 RCA ventilation system Zone 1 RVZ2 RCA ventilation system Zone 2 SHINE SHINE Medical Technologies, Inc.

SL safety limit SNM special nuclear material TOGS TSV off-gas system TSV target solution vessel SHINE Medical Technologies 14-iv Rev. 0

Chapter 14 - Technical Specifications Heterogeneous Reactor Technical Specifications CHAPTER 14 TECHNICAL SPECIFICATION 14a1 HETEROGENEOUS REACTOR TECHNICAL SPECIFICATIONS The SHINE Medical Technologies, Inc. (SHINE) facility is not a heterogeneous reactor facility; therefore, this section does not apply.

SHINE Medical Technologies 14a1-1 Rev. 0

Chapter 14 - Technical Specifications Irradiation Facility Technical Specifications 14a2 IRRADIATION FACILITY TECHNICAL SPECIFICATIONS This section encompasses the technical specifications for the processes involving special nuclear material (SNM), radioisotopes, and chemicals inside the irradiation facility (IF).

In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.34 (a)(5), this section identifies the variables and conditions that will likely be the subjects of technical specifications for the SHINE facility. These may change with the operating license application. These variables and conditions are based on the preliminary design of the SHINE facility. The technical specifications will be submitted with the operating license application.

These proposed variables have been identified on the premise that this material presents a sound framework upon which a final, complete set of technical specifications can be provided with the operating license application.

SHINE Medical Technologies 14a2-1 Rev. 0

Chapter 14 - Technical Specifications Introduction 14a

2.1 INTRODUCTION

The format and content of the technical specifications will be written with the guidance provided in American National Standards Institute (ANSI)/American Nuclear Society (ANS) 15.1, The Development of Technical Specifications for Research Reactors (ANSI/ANS, 2007). The technical specifications for non-power reactors include the categories in 10 CFR 50.36 for production and utilization facilities.

Normal operation of the SHINE facility within the limits of technical specifications will not result in off-site radiation exposure in excess of 10 CFR 20 guidelines.

SHINE Medical Technologies 14a2-2 Rev. 0

Chapter 14 - Technical Specifications Safety Limits and Limiting Safety System Settings 14a2.2 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS Safety limits (SLs) will be placed on important process variables as necessary to reasonably preserve the integrity of the primary system boundary (PSB) and prevent the uncontrolled release of radioactivity. For the SHINE IF, the PSB is the target solution vessel (TSV), TSV dump tank, TSV off-gas system (TOGS), and associated piping and components. SLs may also be established for the character and quality of the target solution.

Limiting safety system settings (LSSSs) are settings for automatic protective devices related to those variables having significant safety functions. These settings ensure that automatic protective action will correct the abnormal situation before an SL is exceeded.

Refer to Table 14a2-1 for the SLs and LSSSs associated with the PSB. The justifications for the variables chosen are given in the section/subsection listed in the Table 14a2-1.

SHINE Medical Technologies 14a2-3 Rev. 0

Chapter 14 - Technical Specifications Limiting Conditions for Operation 14a2.3 LIMITING CONDITIONS FOR OPERATION Limiting conditions of operations (LCOs) are derived from the safety analyses and are implemented administratively or by control and monitoring circuitry to ensure safe operation of the irradiation facility. The LCOs are the lowest functional capability or performance level required for safe operation of the irradiation facility.

Table 14a2-1 shows LCOs associated with the irradiation facility. The justifications for the variables chosen are given in the sections listed in the table.

SHINE Medical Technologies 14a2-4 Rev. 0

Chapter 14 - Technical Specifications Surveillance Requirements 14a2.4 SURVEILLANCE REQUIREMENTS Surveillance requirements will be provided in the technical specifications.

SHINE Medical Technologies 14a2-5 Rev. 0

Chapter 14 - Technical Specifications Design Features 14a2.5 DESIGN FEATURES Design features that will be provided in the technical specifications are the features of the SHINE facility, such as materials of construction and geometric arrangements that would have a significant effect on safety if these features were altered or modified. The requirements of 10 CFR 50.36(c)(4) are specified here as they pertain to the above referenced processes (see Table 14a2-1).

SHINE Medical Technologies 14a2-6 Rev. 0

Chapter 14 - Technical Specifications Administrative Controls 14a2.6 ADMINISTRATIVE CONTROLS Administrative controls will be provided in the technical specifications.

Examples of the proposed subjects of administrative controls are provided below:

Procedures Written procedures shall be established, implemented, and maintained covering activities described in the following Programs.

Programs

  • Criticality-safety
  • ALARA (includes use of accelerator and hot cell audible and visual warnings)
  • Procurement and use of transport and waste containers
  • Fire protection (includes installed and transient combustible loading, performance of hot work, deuterium source vessel integrity, fire watch requirements, use and storage of flammable and combustible liquids and gasses)
  • Solvent control (includes control of process residence times, solvent quality control, and solvent solution sampling and analysis)
  • Tritium control (includes inventory control and sampling)
  • Light water coolant activity monitoring
  • Chemical control SHINE Medical Technologies 14a2-7 Rev. 1

Chapter 14 - Technical Specifications Introduction Table 14a2-1 SHINE Facility Proposed Parameters for Technical Specifications (Sheet 1 of 10)

Chapter/

Section/

Subsection Reference per ANSI/ANS-1 5.1-2007 Section Name SLs and LSSS Basis 2 SLs and LSSS 2.1 SLs

  • TSV power 13a2.1.8/13a2.2.8 Large undamped power oscillations
  • Uranium concentration 13a2.1.2/13a2.2.2 Insertion of excess reactivity
  • Uranium enrichment 13a2.1.11/13a2.2.11 PSB System interaction events
  • Quantities of radioactive materials 13b.2.4 Critical equipment malfunction 13b.2.5 Inadvertent nuclear criticality in the radioisotope production facility 13b.2.6 Radioisotope production facility fire 2.2 Limiting Safety
  • TSV LSSS 13a2.1.2/13a2.2.2 Excess reactivity System a. TSV cover gas hydrogen 13a2.1.8/13a2.2.8 Large undamped power oscillations Settings concentration high 13a2.1.9/13a2.2.9 Detonation and deflagration in primary system boundary
b. TSV neutron flux high, source range
c. TSV neutron flux high, high range SHINE Medical Technologies 14a2-8 Rev. 1

Chapter 14 - Technical Specifications Introduction Table 14a2-1 SHINE Facility Proposed Parameters for Technical Specifications (Sheet 2 of 10)

Chapter/

Section/

Subsection Reference per ANSI/ANS-1 5.1-2007 Section Name LCO or Condition Basis 3 LCOs 3.1 TSV and

  • Target solution parameters: 13a2.1.2/13a2.2.2 Excess reactivity Target a. Precipitation catalyst 13a2.1.8/13a2.2.8 Large undamped power oscillations Solution concentration 13a2.1.11/13a2.2.11 Primary system boundary interaction Parameters events
b. Uranium concentration
c. Uranium enrichment
d. Fission product activity based on the maximum number of cycles prior to target solution cleanup
  • TSV parameters and 13a2.1.2/13a2.2.2 Excess reactivity operational constraints: 13a2.1.3/13a2.2.3 Reduction of cooling
a. High fill flow rate 13a2.1.8/13a2.2.8 Large undamped power oscillations
b. Maximum bulk temperature
c. Minimum bulk temperature
d. Void coefficient design value
e. Temperature coefficient design value SHINE Medical Technologies 14a2-9 Rev. 0

Chapter 14 - Technical Specifications Introduction Table 14a2-1 SHINE Facility Proposed Parameters for Technical Specifications (Sheet 3 of 10)

Chapter/

Section/

Subsection Reference per ANSI/ANS-1 5.1-2007 Section Name LCO or Condition Basis 3.2 TSV Control

  • TRPS: Required channels 13a2.1.2/13a2.2.2 Excess reactivity and Safety operable per Table 3.2.1 13a2.1.3/13a2.2.3 Reduction of cooling Systems Table 3.2.1 (Channel monitored, 13a2.1.8/13a2.2.8 Large undamped power oscillations number of channels required, allowable value, nominal setpoint, 13a2.1.9/13a2.2.9 Detonation and deflagration in primary permissible bypass or other system boundary conditions)
a. TSV cover gas hydrogen concentration high
b. TSV neutron flux high, source range
c. TSV neutron flux high, high range
d. Loss of PCLS flow
e. High PCLS temperature
f. Primary closed loop cooling system (PCLS) low temperature
g. ESFAS
h. Manual SHINE Medical Technologies 14a2-10 Rev. 0

Chapter 14 - Technical Specifications Introduction Table 14a2-1 SHINE Facility Proposed Parameters for Technical Specifications (Sheet 4 of 10)

Chapter/

Section/

Subsection Reference per ANSI/ANS-1 5.1-2007 Section Name LCO or Condition Basis 3.2 TSV Control and

  • TOGS 13a2.1.5/13a2.2.5 Loss of off-site power (contd) Safety Systems a. TOGS operable and in operation 13a2.1.11/13a2.2.11 Primary system boundary interaction (operable includes blowers, events recombiner beds, and interlock with 13b.2.1 Maximum hypothetical accident in the radioisotope noble gas removal system [NGRS])

production facility (RPF)

b. Hydrogen monitoring indication
c. Hydrogen concentration within limits
  • Safety system equipment 13a2.1.2/13a2.2.2 Excess reactivity
a. TSV dump valves 13a2.1.3/13a2.2.3 Reduction of cooling
b. Neutron driver circuit breakers 13a2.1.8/13a2.2.8 Large undamped power oscillations
c. Neutron driver interlock with TSV fill 13a2.1.9/13a2.2.9 Detonation and deflagration in primary system operation boundary
d. Dump tank empty during startup and irradiation
e. Fill valves 3.3 Coolant
  • Light water pool system (LWPS) 13a2.1.2/13a2.2.2 Excess reactivity Systems a. Temperature upper limit and 13a2.1.3/13a2.2.3 Reduction of cooling temperature lower limit 13a2.1.11/13a2.2.11 Primary system boundary interaction
b. Level events SHINE Medical Technologies 14a2-11 Rev. 0

Chapter 14 - Technical Specifications Introduction Table 14a2-1 SHINE Facility Proposed Parameters for Technical Specifications (Sheet 5 of 10)

Chapter/

Section/

Subsection Reference per ANSI/ANS-1 5.1-2007 Section Name LCO or Condition Basis 3.4 Containment

  • Tritium purification system (TPS) 13a2.1.7/13a2.2.7 Mishandling or malfunction of equipment or glove box system or confinement affecting the PSB Confinement
  • IU and TOGS shielded cell 13a2.1.12.2/13a2.2.12.2 Irradiation facility fires confinement isolation valves
  • RPF confinement isolation valves 3.5 Ventilation
  • Ventilation systems (RCA ventilation 13a2.1.4/13a2.2.4 Mishandling or malfunction of target solution Systems system Zone 1 [RVZ1]/RCA 13a2.1.7/13a2.2.7 Mishandling or malfunction of equipment ventilation system Zone 2 [RVZ2])

affecting the PSB

a. Isolation dampers 13a2.1.12.3/13a2.2.12.3 TPS design basis accident
b. Filters 13b.2.4 Critical equipment malfunction
  • Process vessel vent system (PVVS): 13a2.1.5/13a2.2.5 Loss of off-site power Blowers operable 13a2.1.11/13a2.2.11 Primary system boundary interaction events 3.6 Emergency
  • Emergency power system operable 13a2.1.5/13a2.2.5 Loss of off-site power Power 13a2.1.11/13a2.2.11 Primary system boundary interaction events SHINE Medical Technologies 14a2-12 Rev. 0

Chapter 14 - Technical Specifications Introduction Table 14a2-1 SHINE Facility Proposed Parameters for Technical Specifications (Sheet 6 of 10)

Chapter/

Section/

Subsection Reference per ANSI/ANS-1 5.1-2007 Section Name LCO or Condition Basis 3.7 Radiation

  • Noble gas storage tank activity 13b.2.4 Critical equipment malfunction Monitoring
  • Target solution transfer decay time Systems and
  • Radiation monitoring systems 13a2.1.4/13a2.2.4 Mishandling or malfunction of target solution Effluents a. Channels and interlocks with 13a2.1.7/13a2.2.7 Mishandling or malfunction of equipment ventilation systems affecting the PSB
b. Monitoring equipment operable 13a2.1.12.3/13a2.2.12.3 TPS design basis accident 3.8 Experiments N/A N/A 3.9 Facility
  • Criticality-safe sumps 13b.2.5 Inadvertent nuclear criticality in the radioisotope Specific LCOs a. Sump pump operable production facility
b. Sump level detectors operable
  • Radiological Integrated Control Sys- 13b.2.4 Critical Equipment Malfunction tem (RICS)

SHINE Medical Technologies 14a2-13 Rev. 1

Chapter 14 - Technical Specifications Introduction Table 14a2-1 SHINE Facility Proposed Parameters for Technical Specifications (Sheet 7 of 10)

Chapter/

Section/

Subsection Reference per ANSI/ANS-1 5.1-2007 Section Name Design Features Basis 5 Design Features 5.1 Site and Facility

  • Building design to resist external event 13a2.1.4/13a2.2.4 Mishandling or malfunction of target solution Description such as airplane crash, tornados and 13a2.1.6/13a2.2.6 External events tornado missiles, high winds, floods, seismic events 13a2.1.11/13a2.2.11 Primary system boundary interaction
  • Robust design of IU and TOGS events shielded cells 13a2.1.12.1/13a2.2.12.2 Inadvertent exposure to neutrons from
  • the neutron driver 13b.2.3 External events
  • Pipe trench seals to mitigate the conse- 13b.2.4 Critical equipment malfunction quences of spills or leaks
  • NGRS noble gas decay tank storage 13a2.1.11/13a2.2.11 Primary system boundary interaction cell designed to mitigate the events consequences of leaks; NGRS 13b.2.4 Critical equipment malfunction backflow preventer design; NGRS and gas decay tanks integrity SHINE Medical Technologies 14a2-14 Rev. 0

Chapter 14 - Technical Specifications Introduction Table 14a2-1 SHINE Facility Proposed Parameters for Technical Specifications (Sheet 8 of 10)

Chapter/

Section/

Subsection Reference per ANSI/ANS-1 5.1-2007 Section Name Design Features Basis 5.1 (contd) Site and

  • Facility berms, cell, and vault configu- 13b.3 Analysis of accidents with hazardous chemicals Facility ration for chemical storage and pro-Description cesses
  • TPS cell volume combined with TPS 13a2.1.7/13a2.2.7 Mishandling or malfunction of equipment tritium inventory sufficient to maintain affecting the PSB less than LFL assuming a tritium leak
  • Robust TPS confinement system 13a2.1.12.2/13a2.2.12.2 Irradiation facility fires design; tritium transport containers
  • Fire resistant construction of 13b.2.6 Radioisotope production facility fire supercells, hot cells, tank enclosures, and process enclosures; three hour fire-rated barriers that separate fire areas
  • Production facility biological shield; 13b.2.4 Critical equipment malfunction irradiation facility biological shield SHINE Medical Technologies 14a2-15 Rev. 0

Chapter 14 - Technical Specifications Introduction Table 14a2-1 SHINE Facility Proposed Parameters for Technical Specifications (Sheet 9 of 10)

Chapter/

Section/

Subsection Reference per ANSI/ANS-1 5.1-2007 Section Name Design Features Basis 5.1 (contd) Site and

  • RVZ1 ductwork robust design 13a2.1.4/13a2.2.4 Mishandling of target solution Facility 13a2.1.7/13a2.2.7 Mishandling or malfunction of equipment Description affecting the PSB 5.2 TSV Coolant
  • Robust design of the TSV, TOGS, 13a2.1.2/13a2.2.2 Excess reactivity System dump tank, piping and valves; and Design light water pool; dump tank elevation 13a2.2.1 Target solution spill in the irradiation operations area relative to the TSV 13a2.1.4/13a2.2.4 Mishandling or malfunction of target solution 13a2.1.5/13a2.2.5 Loss of off-site power 13a2.1.7 / 13a2.2.7 Mishandling or malfunction of equipment affecting the PSB 13a2.1.9 / 13a2.2.9 Detonation and deflagration in primary system boundary 5.3 Irradiation Unit
  • Neutron driver access door interlock 13a2.1.12.1/13a2.2.12.2 Inadvertent exposure to neutrons from switch; thick walls in IU cell and the neutron driver shield plug SHINE Medical Technologies 14a2-16 Rev. 0

Chapter 14 - Technical Specifications Introduction Table 14a2-1 SHINE Facility Proposed Parameters for Technical Specifications (Sheet 10 of 10)

Chapter/

Section/

Subsection Reference per ANSI/ANS-15.

1-2007 Section Name Design Feature Basis 5.4 Fissionable

  • Criticality safety design - TSV dump 13a2.1.2/13a2.2.2 Excess reactivity Material Storage tank and RPF tanks; uranium storage; neutron absorber in tanks; 13b.2.5 Inadvertent nuclear criticality in the radioisotope criticality-safe containers, racks, production facility sumps, vessels; concrete vault walls SHINE Medical Technologies 14a2-17 Rev. 0

Chapter 14 - Technical Specifications References 14a

2.7 REFERENCES

ANSI/ANS, 2007. The Development of Technical Specifications for Research Reactors, American National Standards Institute, ANSI/ANS-15.1, 2007.

SHINE Medical Technologies 14a2-18 Rev. 0

Chapter 14 - Technical Specifications Introduction 14b TECHNICAL SPECIFICATIONS OF PROCESSES OUTSIDE THE IRRADIATION FACILITY This section encompasses the technical specifications for the processes involving special nuclear material (SNM), radioisotopes, and chemicals outside the IF produced from licensed materials.

In accordance with the requirements of 10 CFR 50.34 (a)(5), this section identifies the variables and conditions that will likely be the subjects of technical specifications for the SHINE facility.

These may change with the operating license application. These variables and conditions are based on the preliminary design of the SHINE facility. The technical specifications will be submitted with the operating license application.

These proposed technical specifications have been formulated on the premise that this material presents a sound framework upon which a final, complete set of specifications can be developed with the operating license application.

14b.1 INTRODUCTION The format and content of the Technical Specifications will be written with the guidance provided in ANSI/ANS 15.1 (ANSI/ANS 2007), NUREG-1537, and the Final ISG Augmenting NUREG-1537. The technical specifications for the facility outside the IF will comply with the regulations in 10 CFR 50.36 pertaining to a fuel reprocessing facility, as required by the Final ISG Augmenting NUREG-1537.

SHINE Medical Technologies 14b-1 Rev. 1

Chapter 14 - Technical Specifications Safety Limits and Limiting Safety System Settings 14b.2 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS 14b.2.1 SAFETY LIMITS FOR PROCESSING IRRADIATED SPECIAL NUCLEAR MATERIAL OUTSIDE OF THE REACTOR For irradiated SNM outside of the TSV, SLs are derived for criticality accident prevention based on the Nuclear Criticality Safety Program, and also from an Integrated Safety Analysis (ISA).

Limits are specified, using the double-contingency principle, to avoid a criticality accident. Limits are set with a conservative margin.

For irradiated SNM outside of the TSV, appropriate limits are imposed pursuant to 10 CFR 50.36(c)(1) to ensure that fission products will be controlled to prevent excessive releases from the containment components, systems, or structures, particularly those structures, systems, and components containing large inventories of byproduct material.

14b.2.2 SAFETY LIMITS FOR PROCESSING UNIRRADIATED SPECIAL NUCLEAR MATERIAL OUTSIDE OF THE IRRADIATION FACILITY Limits are specified, using the double-contingency principle, to avoid a criticality accident. Limits are set with a conservative margin.

14b.2.3 SAFETY LIMITS FOR RADIOCHEMICAL PROCESSING Safety limits for radiochemical processing are developed to maintain operations within limits pursuant to 10 CFR 50.36 to protect the staff and the public. The amount of radiation is limited so as not to exceed the shielding and confinement capabilities of the systems and components in which the materials are processed or stored.

14b.2.4 SAFETY LIMITS FOR CHEMICAL PROCESSING Safety limits for chemical processing with hazardous chemicals that are conducted coincident to operations with SNM or radioactive material are developed in accordance with 10 CFR 50.36.

14b.2.5 LIMITING SAFETY SYSTEM SETTINGS For each process variable or parameter for which a SL is specified, and for which monitoring instruments are used, a protective operating limit is set to avoid exceeding the SL. This LSSS is calculated to provide a conservative margin below the SL and to account for overall measurement uncertainty, operating characteristics of control systems, and accuracy of control instrumentation. LSSSs will be established, as much as possible, to ensure adequate safety margins for each of the processes described above.

Refer to Table 14a2-1 for the SLs and LSSSs associated with the processes outside the irradiation facility.

SHINE Medical Technologies 14b-2 Rev. 1

Chapter 14 - Technical Specifications Limiting Conditions for Operation 14b.3 LIMITING CONDITIONS FOR OPERATION LCOs are derived from the ISA and are administrative or engineered controls in addition to LSSSs that are put in place to ensure that operations are maintained within safe limits.

The LCOs will include the features discussed in the following subsections as appropriate. Refer to Table 14a2-1 for the LCOs associated with the processes outside the irradiation facility.

14b.3.1 PRIMARY PROCESS COMPONENTS AND SYSTEMS Processing SSCs and procedures that are designed and constructed to ensure that processing is conducted safely will have LCOs established for each of the processes defined in Section 14b.2 above.

14b.3.2 CONTAINMENT AND CONFINEMENT A confinement system is required as a result of the ISA and is defined as an LCO, pursuant to 10 CFR 50.36(c)(1).

14b.3.3 VENTILATION SYSTEMS The ISA prescribes the need for certain ventilation configurations, they are listed as an LCO pursuant to 10 CFR 50.36(c)(1).

14b.3.4 EMERGENCY ELECTRICAL POWER The ISA prescribes the need for emergency electrical power, the power supply is listed as an LCO pursuant to 10 CFR 50.36(c)(1).

14b.3.5 RADIATION MONITORING SYSTEMS AND EFFLUENTS Radiation monitoring systems and limits on effluents are specified as they pertain to the above-referenced processes, pursuant to 10 CFR 50.36(c)(1).

SHINE Medical Technologies 14b-3 Rev. 0

Chapter 14 - Technical Specifications Surveillance Requirements 14b.4 SURVEILLANCE REQUIREMENTS Surveillance requirements will be provided in the technical specifications.

SHINE Medical Technologies 14b-4 Rev. 0

Chapter 14 - Technical Specifications Design Features 14b.5 DESIGN FEATURES Design features that will be provided in the technical specifications are the features of the SHINE facility, such as materials of construction and geometric arrangements that would have a significant effect on safety if these features were altered or modified. The requirements of 10 CFR 50.36(c)(4) are specified here as they pertain to the above referenced processes. Refer to Table 14a2-1 for the design features associated with the processes outside the irradiation facility SHINE Medical Technologies 14b-5 Rev. 0

Chapter 14 - Technical Specifications Administrative Controls 14b.6 ADMINISTRATIVE CONTROLS See Section 14a2.6 for examples of Administrative Controls that will be in use at the SHINE Facility.

The remaining administrative controls will be provided in the technical specifications.

SHINE Medical Technologies 14b-6 Rev. 1

Chapter 14 - Technical Specifications References 14b.7 REFERENCES ANSI/ANS, 2007. The Development of Technical Specifications for Research Reactors, American National Standards Institute, ANSI/ANS-15.1, 2007 SHINE Medical Technologies 14b-7 Rev. 0