|
---|
Category:Letter type:PNP
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2024-003, License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-24024 May 2024 License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-025, Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 02024-05-23023 May 2024 Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 0 PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-008, Annual Radioactive Effluent Release Report2024-04-23023 April 2024 Annual Radioactive Effluent Release Report PNP 2024-009, Annual Radiological Environmental Operating Report2024-04-23023 April 2024 Annual Radiological Environmental Operating Report PNP 2024-017, 2023 Annual Non-Radiological Environmental Operating Report2024-04-23023 April 2024 2023 Annual Non-Radiological Environmental Operating Report PNP 2024-016, Notice of Intent to Pursue Subsequent License Renewal2024-04-18018 April 2024 Notice of Intent to Pursue Subsequent License Renewal PNP 2024-006, Notification of Changes in Accordance with 10 CFR 50.82(a)(7)2024-04-0909 April 2024 Notification of Changes in Accordance with 10 CFR 50.82(a)(7) PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-033, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-021, Ventilated Storage Cask Inspection Summary Report2023-08-16016 August 2023 Ventilated Storage Cask Inspection Summary Report PNP 2023-023, Special Report – High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report – High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link 2024-08-02
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARPNP 2016-013, Closure Notification - Cyber Security Violations Documented in Inspection of Implementation of Interim Cyber Security Milestones 1-7 Inspection Report2016-03-24024 March 2016 Closure Notification - Cyber Security Violations Documented in Inspection of Implementation of Interim Cyber Security Milestones 1-7 Inspection Report ML16057A0702016-02-26026 February 2016 Submittal of 10-Day Response to Apparent Violations in IR 05000255/2015013; EA-15-039 PNP 2016-014, Ltr 10-Day Response to Apparent Violations in IR 2015013; EA-15-039 Palisades Nuclear Plant2016-02-26026 February 2016 Ltr 10-Day Response to Apparent Violations in IR 2015013; EA-15-039 Palisades Nuclear Plant PNP 2015-093, Response to Non-Cited Violation Dated October 30, 20152015-11-30030 November 2015 Response to Non-Cited Violation Dated October 30, 2015 PNP 2015-088, Reply to an Apparent Violation in Inspection Report 2015012; EA-15-171, Revision 12015-10-28028 October 2015 Reply to an Apparent Violation in Inspection Report 2015012; EA-15-171, Revision 1 PNP 2015-078, Reply to an Apparent Violation in Inspection Report 2015012; EA-15-1712015-10-17017 October 2015 Reply to an Apparent Violation in Inspection Report 2015012; EA-15-171 PNP 2015-077, Submittal of 10-Day Response to an Apparent Violation in IR 2015012; EA-15-1712015-09-26026 September 2015 Submittal of 10-Day Response to an Apparent Violation in IR 2015012; EA-15-171 PNP 2015-020, Reply to a Notice of Violation, EA-14-1682015-03-25025 March 2015 Reply to a Notice of Violation, EA-14-168 PNP 2014-069, Reply to Inspection Report 05000255/20140072014-07-18018 July 2014 Reply to Inspection Report 05000255/2014007 PNP 2014-056, Reply to Non-Cited Violation, Failure to Complete Volumetric Examinations for DM Butt Welds in Branch Connections, 05000255/2014002-022014-06-0606 June 2014 Reply to Non-Cited Violation, Failure to Complete Volumetric Examinations for DM Butt Welds in Branch Connections, 05000255/2014002-02 ML0905601882009-02-23023 February 2009 Reply to Notice of Violation EA-08-322 ML0816900512008-06-16016 June 2008 30 Day Response to IR 05000255-08-002, on 05/15/2008 for Palisades Nuclear Plant ML18344A1801998-07-24024 July 1998 Responding to Inspection Report 50-255/98009, Which Recommended Broad Examination of Radiological Protection Program. Advising of Instituted Corrective Actions & Management Is Continuing to Positively Reinforce ML18344A1831998-01-20020 January 1998 Responding to Notice for Three Violations Identified in Inspection Report 50-255/97015(DRS), Letter Submits Attachments 1, 2, 3 to Reply Violations of 97015-01, 97015-02, 97015-03 Respectively ML18344A4131979-12-0606 December 1979 12/06/1979 Letter Notice of Proposed Imposition of Civil Penalties Due to Noncompliance of Containment Isolation ML18344A4121979-11-29029 November 1979 11/29/1979 Letter Notice of Proposed Imposition of Civil Penalties Due to Noncompliance of Containment Isolation ML18344A4111979-11-29029 November 1979 Response to Notice of Violation on Noncompliance of Containment Isolation 2016-03-24
[Table view] |
Text
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 269.764.2000 Anthony J. Vitale Site Vice President PNP 2015-020 March 25, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Reply to a Notice of Violation, EA-14-168 Palisades Nuclear Plant Docket 50-255 License No. DPR-20
Dear Sir or Madam:
By letter dated February 23, 2015, the Nuclear Regulatory Commission issued notice of violation (NOV) EA-14-168 to Entergy Nuclear Operations, Inc. (ENO). The letter documents a violation of the requirements of 10 CFR 20.1201 (c) and a violation of Technical Specification 5.4.1.a.
ENO acknowledges the violations and has taken corrective steps to avoid further violations. ENO's reply to NOV EA-14-168 is attached.
This letter contains one new commitment listed in Attachment 2 and no revisions to existing commitments.
Sincerely, AJV/tad
Attachment:
- 1. Reply to a Notice of Violation, EA-14-168
- 2. Summary of Commitments cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
Attachment 1 Reply to a Notice of Violation, EA-14-168 RESTATEMENT OF VIOLATIONS
- 1. Title 10 of the Code of Federal Regulations (10 CFR) Section 20. 120 1(c) requires, in part, that, when the external exposure is determined by measurement with an external personal monitoring device, the deep-dose equivalent (DOE) must be used in place of the effective dose equivalent (EDEX),
unless the EDEX is determined by a dosimetry method approved by the NRC.
The assigned DOE must be for the part of the body receiving the highest exposure.
Contrary to the above, between February 6 and March 8, 2014, during control rod drive housing replacement work activities at the Palisades Nuclear Plant, the licensee did not use the DOE and the EDEX was not determined by a dosimetry method approved by the NRC. Specifically, the licensee failed to ensure that radiation worker dosimeters (calibrated to the DOE) were located at the highest exposed portion of the respective compartment, a condition of the NRC-approved method for determining EDEX.
- 2. Technical Specification 5.4. 1.a. states, in part, that "written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978."
NRC Regulatory Guide 1.33, Appendix A, Section 7 addresses "Procedures for Control of Radioactivity (For Limiting Materials Released to Environment and Limiting Personnel Exposure)," Section 7.e, addresses "Radiation Protection Procedures," and Subsection 7.e.(7) discusses procedures for personnel monitoring.
Radiation protection procedure EN-RP-204, "Special Monitoring Requirements,"
Revision 6, provides instructions and requirements for the relocation of whole body dosimeters and the use and issuance of dosimeters for EDEX monitoring.
Contrary to the above, between February 6 and March 8, 2014, the licensee failed to establish a procedure for personnel monitoring covering all practical worker positions and shielding geometries prior to implementation during control rod drive housing replacement work activities at the Palisades Nuclear Plant.
Specifically, EN-RP-204 did not require locating the dosimeter at the highest exposed portion of the respective body, as required by 10 CFR 20. 120 1(c), nor did it account for the shielding effects caused by use of tungsten vests.
Page 1 of 3
Attachment 1 Reply to a Notice of Violation, EA-14-168 REPLY FOR VIOLATION 1 REASON FOR THE VIOLATION Entergy Nuclear Operations, Inc. (ENO) Fleet Procedure EN-RP-204, "Special Monitoring Requirements," lacked pertinent information and restrictions contained in Regulatory Guide 8.40, "Methods for Measuring Effective Dose Equivalent from External Exposure," (EDEX). EN-RP-204 did not contain adequate guidance for determining and validating use of a chest dosimeter as a representative dose for the combined thorax/abdomen compartment.
CORRECTIVE STEPS THAT HAVE BEEN TAKEN A re-calculation of dose to the affected workers was performed using a NRC approved method.
ENO updated the dose exposure records, notified the affected workers, and notified other nuclear power plants of the increased dose assigned to those workers.
As a result of NRC Inspection Report, 05000255/2014010, containing notification of a preliminary white finding, revision 7 of ENO Fleet Procedure EN-RP-204 was published on February 16, 2015. Revision 7 established guidance for implementing a NRC-approved method for measuring EDEX. However, revision 7 contains guidance that is contrary to a NRC position stated in Notice of a Violation, EA-14-168, received on February 23, 2015. Specifically, revision 7 of EN-RP-204 states if an evaluation of the work in-progress indicates a dose gradient across the compartment of more than 1.5 times the dosimeter placement location, then the dosimeter should be relocated to the highest indicated location within the respective compartment. In the Notice of a Violation, EA-14-168, the NRC did not agree that the use of the 1.5 gradient in this manner was an acceptable practice. Therefore, EN-RP-204 requires a revision to remove this guidance.
CORRECTIVE STEPS THAT WILL BE TAKEN TO AVOID FUTURE VIOLATIONS Revision 8 of ENO Fleet Procedure EN-RP-204 will be implemented that will add guidance to meet a NRC-approved method for determining EDEX. Specifically, ensuring radiation worker dosimeters, calibrated to the deep-dose equivalent (DOE), are located at the highest exposed portion of the respective compartment in accordance with Regulatory Guide 8.40.
Lessons-learned as a result of the NRC violations will be incorporated into radiation protection pre-outage and continuing training modules. Key learnings topics include:
- Methods for determining EDEX
- Radiation protection field oversight required to reinforce fundamental standards
- Validating assumptions made during the work planning process with respect to worker body positioning DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance will be achieved by June 9, 2015, with the implementation of revision 8 of ENO Fleet Procedure EN-RP-204, "Special Monitoring Requirements."
Page 2 of 3
Attachment 1 Reply to a Notice of Violation, EA-14-168 REPLY FOR VIOLATION 2 REASON FOR THE VIOLATION Entergy Nuclear Operations, Inc. (ENO) Fleet Procedure EN-RP-204, "Special Monitoring Requirements," failed to establish adequate guidance for monitoring personnel for all practical worker positions and shielding geometries. Specifically, EN-RP-204 did not require locating the dosimeter at the highest exposed portion of the respective body, in accordance with regulatory requirements, nor did it account for the shielding effects caused by use of tungsten vests.
CORRECTIVE STEPS THAT HAVE BEEN TAKEN A re-calculation of dose to the affected workers was performed using a NRC approved method.
ENO updated the dose exposure records, notified the affected workers, and notified other nuclear power plants of the increased dose assigned to those workers.
As a result of NRC Inspection Report, 05000255/2014010, containing notification of a preliminary white finding, revision 7 of ENO Fleet Procedure EN-RP-204 was published on February 16, 2015. Revision 7 established guidance for implementing a NRC-approved method for measuring EDEX. However, revision 7 contains guidance that is contrary to a NRC position stated in Notice of a Violation, EA-14-168, received on February 23, 2015. Specifically, revision 7 of EN-RP-204 states if an evaluation of the work in-progress indicates a dose gradient across the compartment of more than 1.5 times the dosimeter placement location, then the dosimeter should be relocated to the highest indicated location within the respective compartment. In the Notice of a Violation, EA-14-168, the NRC did not agree that the use of the 1.5 gradient in this manner was an acceptable practice. Therefore, EN-RP-204 requires a revision to remove this guidance.
CORRECTIVE STEPS THAT WILL BE TAKEN TO AVOID FUTURE VIOLATIONS Revision 8 of ENO Fleet Procedure EN-RP-204 will be implemented that will add guidance to adequately monitor personnel. Specifically, ensuring dosimetry is located at the highest exposed portion of the respective body, in accordance with regulatory requirements, and account for the shielding effects caused by use of tungsten vests.
Lessons-learned as a result of the NRC violations will be incorporated into radiation protection pre-outage and continuing training modules. Key learnings topics include:
- Methods for determining EDEX
- Radiation protection field oversight required to reinforce fundamental standards
- Validating assumptions made during the work planning process with respect to worker body positioning DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance will be achieved by June 9, 2015, with the implementation of revision 8 of ENO Fleet Procedure EN-RP-204, "Special Monitoring Requirements."
Page 3 of 3
Attachment 2 Summary of Commitments This table identifies actions discussed in this letter for which Entergy Nuclear Operations, Inc. (ENO) commits to perform. Any other actions discussed in this submittal are described for the NRC's information and are not commitments.
TYPE (Check one) SCHEDULED ONE- COMPLETION CONTINUING COMMITMENT TIME DATE COMPLIANCE ACTION (If Required)
ENO will revise EN-RP-204 to add guidance to meet a NRC-approved method X June 9, 2015 for determining EDEX and account for the shielding effects caused by use of tungsten vests.
Page 1 of 1