Rafael Flores Luminant Power Senior Vice President P 0 Box 1002 0-1
& Chief Nuclear Officer 6322 North FM 56 Rafael.Flores@Luminant.com Glen Rose, TX 76043 Luminant T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-201500032 Ref. # 10CFR50.55a Log # TXX-15007 January 8, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NO. 50-446 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOR RELIEF REQUESTS B-7, B-12, AND B-13 (TAC NO. MF4752)
REFERENCES:
- 1. Letter logged TXX-14103 dated August 27, 2014 from Rafael Flores to the NRC submitting Unit 2 Relief Requests Nos. B-7, B-12 and B-13 for the Second 10-Year ISI Interval (Second Interval Start Date: August 3, 2004; Second Interval End Date August 2, 2014).
- 2.
Email dated December 16, 2014 from Balwant Singal of the NRC to Timothy Hope of Luminant Power requesting additional information regarding Relief Requests ((RRs)
B-7, B-12, and B-13 (TAC No. MF4752).
Dear Sir or Madam:
Per reference 1, Luminant Generation Company, LLC (Luminant Power) submitted Relief Requests B-7, B-12, and B-13 for Comanche Peak Unit 2 for the second ten year inservice inspection interval. Per reference 2, the NRC provided a request for additional information regarding the subject relief requests.
The request was to confirm that no Nickel Alloy weld metals (182 and 82) were used in the Category B-B, Item B.40 SG Head-to-Tubesheet Welds.
Luminant Power has confirmed that no Nickel Alloy weld metals (182 and 82) were used in the Category B-B, Item B.40 SG Head-to-Tubesheet Welds.
This communication contains no new commitments regarding Comanche Peak Unit 2.
Should you have any questions, please contact Mr. Jack Hicks at (254) 897-6725.
Ao04-1-teL.
U. S. Nuctear Regulatory Commission TXX-15007 Page 2 of 2 01/08/2015 Sincerely, Luminant Generation Company LLC Rafael Flores By:
4"J d
Sred W. Madden Director, External Affairs c -
Marc L. Dapas, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak Jack Ballard, ANII, Comanche Peak Robert Free Environmental Monitoring & Emergency Response Manager Texas Department of State Health Services Mail Code 1986 P.O. Box 149347 Austin, TX 78714-9347