Independent Spent Fuel Storage Installation
ML14329A059
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/20/2014
From: Brabec R
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
Download: ML14329A059 (1)


Text

'N\\

SOUTHERN CALIFORNIA

! EDISON S

I.S'ON INTERN,4TIONAL'E Company Richard C. Brabec Principal Manager, Nuclear Regulatory Affairs and Emergency Planning SAFEGUARDS INFORMATION 10 CFR 50.54(p)

November 20, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington D.C. 20555-0001

Subject:

Docket Nos. 50-361, 50-362 and 72-41 San Onofre Nuclear Generating Station, Units 2 and 3 and Independent Spent Fuel Storage Installation

Dear Sir or Madam:

Southern California Edison (SCE) has made changes to the Physical Security Plan and the Safeguards Contingency Plan for San Onofre Nuclear Generating Station (SONGS). SCE has determined these changes do not decrease the safeguards effectiveness of these plans.

In accordance with 10 CFR 50.54(p)(2), a report containing a description of these changes is enclosed for your information and a record of the changes has been made and is available for inspection at SONGS.

There are no new regulatory commitments made by this letter or its enclosures.

Note that the enclosures to this letter contains Safeguards Information. This letter may be decontrolled upon separation from its enclosures.

If there are any questions or if additional information is needed, please contact Ms. Andrea Enclosures (SGI) cc:

Mark Dapas, Regional Administrator, NRC Region IV W. C. Allen NRC Project Manager, San Onofre ISFSI G. G. Warrick, NRC Senior Resident Inspector, San Onofre Units and 2 (w/o enclosures)

SAFEGUARDS INFORMATION NOTICE: Decontrolled upon separation from the enclosure P.O. Box 128 San Clemente, CA 92672 (949) 368-7418 PAX 87418 Fax: (949) 368-7575 fohn.Brabec@sce.com S~:iYoi