ML14282A094

From kanterella
Jump to navigation Jump to search

Request to Withdraw Documents Related to the License Amendment Request to Revise the Ultimate Heat Sink Temperature
ML14282A094
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/22/2014
From: Blake Purnell
Plant Licensing Branch III
To: Pacilio M
Exelon Generation Co
Blake Purnell, NRR/DORL 415-1380
References
TAC ME9076, TAC ME9077
Download: ML14282A094 (3)


Text

Mr. Michael J. Pacilio Senior Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 22, 2014 Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2-REQUEST TO WITHDRAW DOCUMENTS RELATED TO THE LICENSE AMENDMENT REQUEST TO REVISE THE ULTIMATE HEAT SINK TEMPERATURE LIMITS (TAC NOS.

ME9076 AND ME9077)

Dear Mr. Pacilio:

By application dated July 12, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12200A330), Exelon Generation Company, LLC (EGC) submitted a license amendment request (LAR) for LaSalle County Station, Units 1 and 2, to revise Technical Specification 3.7.3, "Ultimate Heat Sink [UHS]." EGC provided supplemental information to the U.S. Nuclear Regulatory Commission (NRC) for the LAR by letter dated October 4, 2013 (ADAMS Accession No. ML13282A339). By letter dated February 20, 201L (ADAMS Accession No. ML14066A250), EGC stated that proprietary information was inadvertently provided in the following attachments to the Oc~ct*er 4, 2013, ~etter*

  • : UHS Calculation (Design Analysis L-002457, Revision 8)
  • : UHS Heat Load Calculation (Design Analysis L-002453, Revision 4)

The February 20, 2014, letter included a request to withdraw Attachments 3 and 5 of the October 4, 2013, letter. The February 20, 2014, letter also included a request to withhold information included in the attachments that will be considered separately.

The February 20, 2014, letter provided proprietary and nonproprietary versions of the UHS Calculation and UHS Heat Load Calculations which were originally provided with the October 4, 2013, letter. The proprietary versions were marked on each page where proprietary information was included. EGC did not identify any changes to these documents other than marking the proprietary information. The NRC staff compared the documents provided on February 20, 2014, with those provided on October 4, 2013, and noted that the identification numbers, revision numbers, and signature dates are the same. Thus, removal of Attachment 3 and 5 of the October 4, 2013, letter from NRC records would not actually remove any information that the NRC staff is considering as part of its LAR review.

The NRC staff has reviewed EGC's request to withdraw Attachments 3 and 5 to the October 4, 2013, letter in accordance with Title 10 of the Code of Federal Regulations ( 10 CFR),

Section 2.390(c)(3) and concludes that the request can be granted. Therefore, the requested documents will be removed from NRC records.

If you have any questions regarding this matter, I may be reached at 301-415-1380.

Docket No. 50-373 and 50-37 4 cc:

Mr. Peter M. Yandow Sincerely, Blake Purnell, Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Vice President, Nuclear Plant Projects/Services Licensing, Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28402 Distribution via ListServ

  • ML14282A094 RidsNrrDssSbpb RidsNrrDssSnpb RidsNrrDssScvb RidsNrrDssSrxb RidsNrrDssArcb MHamm, NRR OFFICE LPL3-2/PM LPL3-2/LA OGC LPL3-2/BC LPL3-2/PM NAME BPurnell SRohrer SUttal TTate BPurnell DATE 10/9/14 10/9/14 10/10/14 10/16/14 10/22/14