ML14191B122
| ML14191B122 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 06/26/1989 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Eury L CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14191B123 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, RTR-REGGD-01.033, RTR-REGGD-1.033 NUDOCS 8907100029 | |
| Download: ML14191B122 (3) | |
See also: IR 05000261/1989009
Text
r ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8907100029
DOC.DATE: 89/06/26 NOTARIZED: NO
DOCKET
CIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power &.Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
REYES,L.A.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
EURYL.W.
Carolina Power & Light Co.
R
SUBJECT: Forwards Insp Rept 50-261/89-09 on 890418-0510 & notice of
violation.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR L ENCL
SIZE:
+ID
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation isponse
S
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
A
PD2-1 PD
1
1
LO,R
1
1
D
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
AEOD/TPAD
1
1
DEDRO
1
1
D
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB
1
1
NRR/DOEA DIR 11
1
1
5
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OE LIE-BEPy
J
1
1
OGC/HDS1
1
.1
RGFIE
4
1
1
RES MORISSEAU,D
1
1
RGN2
FILE
01
1
1
AL: LPDR
1
1
NRC PDR
1
1
AW
- NSIC
1
1
D
Nor 'IO ALL "RIDS" RECIPENT:
S
PLEASE WEL
US 'IO IEDUC11ASTUM!
CDN=C MHE DMENT CONIRL DESK,
RO0CM P1-37 (EXT. 20079) 'T0 ELIMN'I
YOURn
NAM10 DISTRIUaTION
LIST
FOR DOCOMENTB YOU DON'T NEEDI
AL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
23
JUN 2 6 988
Docket No:
50-261
License No:
Carolina Power and Light Company
ATTN:
Mr. Lynn W. Eury
Executive Vice President
Power Supply
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/89-09
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
L. W. Garner on April 18 - May 10, 1989.
The inspection included a review of
activities authorized for your H. B. Robinson facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified 'in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records,
interviews with personnel,
and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violations, references to pertinent requirements,
and
elements to be included in your response are described in the enclosed Notice
of Violation.
Violation A of the enclosed Notice concerns a residual heat
removal system design criteria deficiency which you identified during your
Design Basis Reconstitution Project review.
We are encouraged by the
conservative actions you took upon discovery of this design deficiency;
however,
we underscore the necessity of ensuring reliability and total
confidence in the emergency core cooling systems.
We support your efforts
in implementing the long-term corrective action in this instance and your
continuing efforts in the Design Basis Reconstitution Project.
Your attention is invited to the unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
.
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
8907100029 8906.26
ADOCK 05000261
P DC
Carolina Power and Light Company
2
JUN 2 6 1989
Should you' have any questions concerning this letter, please contact us.
Sincerely,.
(Original signed by LAReyes)
Luis A. Reyes, Director
Division of Reactor Projects
Enclosures:
2. NRC Inspection Report
cc w/encls:
C. R. Dietz, Manager Robinson
Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encls:
NRC Resident Inspector
Document Control Desk
RI
RII
RI
IRH
roll
anceDVerrelli
Jenk ns
MLErnst
56/ /89
06//89
(R67 5 /89
64$./89
/89 6/3/89
RII
RII
RII
B arroll
HDance
DVerre111
06/K6/89
06/t/89
06/A4/89