ML14191B114

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/89-08 on 890311-0417 & Notice of Violation
ML14191B114
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/18/1989
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
Shared Package
ML14191B115 List:
References
NUDOCS 8906050174
Download: ML14191B114 (3)


See also: IR 05000261/1989008

Text

ACCELERATED

DISTRIBUTION

DEMONSTATION

SYS7TEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8906050174

DOC.DATE: 89/05/18 NOTARIZED: NO

DOCKET #

FACIL-: 0-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

AUTH.NAME

AUTHOR AFFILIATION

VERRELLI,D.M.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

EURY,L.W.

Carolina Power & Light Co.

SUBJECT: Forwards Notice of Violation & insp rept.

DISTRIBUTION CODE: IE01D

COPIES RECEIVED:LTR /

ENCL L SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 PD

1

1

LO,R

1

1

INTERNAL: AEOD

1

1

AEOD/DEIIB

1

1

AEOD/TPAD

1

1

DEDRO

1

1

NRR SHANKMAN,S

1

1

NRR/DEST DIR

1

1

NRR/DLPQ/PQEB

1

1

NRR/DOEA DIR 11

1

1

NRR/DREP/EPB 10

1

1

NRR/DREP/RPB 10

2

2

NRR/PMAS/ILRB12

1

1

NUDOCS-ABSTRACT

1

1

RMAN,J

1

1

OGC/HDS1

1

1

REG FILE

02

1

1

RGN2

FILE

01

1

1

EXTERNAL: LPDR

1

1

NRC PDR

1

1

NSIC

1

1

I

NOrE TO ALL "RIDS" RECIPIE IS:

PEAPSE HEP US TO FEDU2 MAUM!

OawECT THE DOaMUW

OWMnL DESK,

ROM P1-37 (EXTr.

20079) TO ELIMINAT

WMEI

INE F"c

DISTRIBOTON

LIST

OR DOCUMENIS YOU

IWT NEEDI

TOTAL NUMBER OF COPIES REQUIRED: LTTR

22

ENCL

-22

Docket No:

50-261

License No:

DR-23

Carolina Power and Light Company

ATTN:

Mr. Lynn W. Eury

Executive Vice President

Power Supply

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

NRC INSPECTION REPORT NO. 50-261/89-08

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

L. W. Garner on March 11 - April 17, 1989.

The inspection included a review of

activities authorized for your.H. B. Robinson facility.

At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel,

and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

The violation, references to pertinent requirements,

and

elements to be included in your response are described in the enclosed Notice

of Violation.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy.of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

8906050174 890518

PDR

ADOCK 05000261

PNU

Carolina Power and Light Company

2

MAY 18 1989

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by HCDance/for)

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2.

NRC Inspection Report

cc w/encls:

C. R. Dietz,.Manager Robinson

Nuclear Project

R. E. Morgan, Plant General Manager

bcc w/encls:

NRC Resident Inspector

Document Control Desk

DRS Technical Assistant

M. Hodges, NRR.

HDance

S

O5//f /89

05/ /89