ML14191B102
| ML14191B102 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 04/06/1989 |
| From: | Verrelli D NRC/IE, NRC/RGN-II |
| To: | Eury L Carolina Power & Light Co |
| Shared Package | |
| ML14191B103 | List: |
| References | |
| NUDOCS 8904200175 | |
| Download: ML14191B102 (3) | |
See also: IR 05000261/1989007
Text
ACCELERATED
DISTPJBUT0]N
DEMONSTRATION
SYS-TEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:8904200175
DOC.DATE: 89/04/06 NOTARIZED: NO
DOCKET #
ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
VERRELLI,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
EURY,L.W.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/89-07 on 890211-0310 & notice of
violation.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
S
RECIPIENT
COPIES
RECIPIENT
COPIES
/
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
A
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
D
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB 11
1
1
D
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OE-LIEBERMAN,J
1
1
OGC/HDS1
1
1
R
FI
02
1
1
RGN2
FILE
01
1
1
ERNAL: LPDR
1
1
NRC PDR
1
1
1
1
S
D
D
NOTE 10 ALL "RIDS" RECIPIENTS:
S
PLEASE HELP US TO REDXCE WASTE! CMCT THE DDCUMErT ONTIROL DESK,
ROOM P1-37 (EXT.
20079) TIO ELflI
YOUR NANE Flo
DISTRIBUTICN
LISTS FOR DOCUMTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
23
Docket No:
50-261
License No:
Carolina Power and Light Company
ATTN:
Mr. L. W. Eury
Executive Vice President
Power Supply
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/89-07)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
L. W. Garner on February 11 - March 10, 1989. The inspection included a review
of activities authorized for your H. B. Robinson facility. At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel,
and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements. The violation, references to pertinent requirements,
and
elements to be included in your response are described in the enclosed Notice
of Violation.
In Accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
8904200175 890406
ADOCK 05000261
Carolina Power and Light Company
2
APR 0
Should you have any questions concerning this letter, please contact us.
Sincerely,
OR!C1NALSINED SY
DAV'ID MA. VR
L
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosures:
2. NRC Inspection Report
cc w/encls:
C. R. Dietz, Manager Robinson
Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encls:
NRC Resident Inspector
Document Control Desk
DRS Technical Assistant
RII
RI
&
RCarroll
HDance
04/6 /89
04/6 /89