ML14191B096
| ML14191B096 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 03/07/1989 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14191A973 | List: |
| References | |
| NUDOCS 8903240150 | |
| Download: ML14191B096 (3) | |
See also: IR 05000261/1989001
Text
ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSfTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8903240150
DOC.DATE: 89/03/07
NOTARIZED: NO
DOCKET #
FACIL:50-261H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
0
UTH.NAME
AUTHOR AFFILIATION
LIAN,C.A.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/89-01 on 890109-13 & notice of
violation.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL I SIZE:
.
4-1
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
1
1
OGC/HDS1
1
1
REG FILE
02
1
1
RGN2
FILE
01
1
1
RNAL: LPDR
1
1
NRC PDR
1
1
1
1
I
D
S
A
NorE 'IO ALL "RIDS" RECIPIENS:
S
WSTE!
00NrACT THE DOMEfr ODIOL DESK,
ROCM P1-37 (EXT. 20079) TO ELINATZ YMOt NAME F1CM DISTRI
LISTS MOR DOCUMEWNS YOU DON'T NEEI
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
23
MAR 0 7 1989
l
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NO. 50-261/89-01)
This refers to the Nuclear Regulatory Commission (NRC)
inspection conducted by
S. Tingen on January 9 -
13,
1989.
The inspection included a review of
.activities
authorized for your H. B. Robinson facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records,
interviews with personnel,
and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violation, references to pertinent requirements, and
elements to be included in your response are described in the enclosed Notice
of Violation.
The enclosed Inspection Report documents an oral commitment (see paragraph 2.c.
and 3.b.(2))
made by a licensee representative and discussed in the exit
interview. If your understanding of this commitment differs from the report
statements, please inform this office promptly.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
8903240150 890307
ADOCK 05000261
G
PNU
Carolina -Power and Light Company
2
MAR 07 1989
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Caud1
A. Julian, Chief
Engineering Branch
Division of Reactor Safety
Enclosures:
2. NRC Inspection Report
cc w/encls:
C. R. Dietz, Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encls:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
RH
RI Tj
RII
STingen:sda
G elisle
PFredrickson
01/ )/ 8 9
O1,\\
/89
01
/89