ML14191B023
| ML14191B023 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 11/10/1988 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14191B024 | List: |
| References | |
| NUDOCS 8811280081 | |
| Download: ML14191B023 (3) | |
See also: IR 05000261/1988028
Text
ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYS7TEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION-NBR;8811280081
DOC.DATE: 88/11/10 NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
UTH.NAME
AUTHOR AFFILIATION
RRELLI,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/88-28 on 880911-1010 & notice of
violation.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL
t SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
INTERNAL: AEOD
1
1
DEDRO
1
1
NRR MORISSEAU,D
1.
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OE LIEBERMAN,J
1
1
OGC/HDS1
1
1
FL
02
1
1
RGN2
FILE
01
1
1
.
RNAL: LPDR
1
1
NRC PDR
1
1
1
1
RESL MARTIN,D
1
1
D
NOTE TO ALL "RIDS" RECIPIENTS:
S
PLEASE HP
US TO REIUCE UASTE!
00NTACT THE DOCMENT CDNTROL DESK,
ROOM P1-37 (EXT. 20079) To ELIMNTE OUR NAM FRC
DISTRIBUTIONI
LISTS RQR DOCUMENTS YOU DON'T NEEDI
TOTAL NUMBER OF COPIES REQUIRED:. LTTR
22
ENCL
22
NOV 1 0 1988
Docket No:
50-261
License No:
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/88-28)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
L. W. Garner on September 11 - October 10,
1988.
The inspection included a
review of activities authorized for your H. B. Robinson facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel,
and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements. Two violations, references to pertinent requirements,
and
elements to be included in your response are described in the enclosed Notice
of Violation. A third violation involving transportation of licensed material
is also described in the enclosed Notice of Violation. As this violation is of
minor safety concern for which, by the end of the inspection, you had already
taken or were in the process of taking adequate corrective actions to prevent
recurrence, you are not required to address this violation in your response.
Your attention is invited to the unresolved items identified in the inspection
report. These matters will be pursued during.future inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
881128,008
881110
ADOCK 05000261
PMRI
Carolina Power and Light Company
2
NOV 1 019g
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original signed by P. Fredrickson
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report
cc w/encls:
x/C. R. Dietz, Manager
Robinson Nuclear Project Department
/R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encls:
,,,NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
RII
RI
RII
- ro:ser
PF
ickson
CHosY
11/0/88
11a /88
11/c, /88