Docket No:
50-261
License No:
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC
27602
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/88-10)
This refers to the Nuclear Regulatory Commission (NRC)
inspection conducted
by L. W. Garner on May 11 -
June 9.
The inspection included a review of
activities authorized for your H. B. Robinson facility.
At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records,
interviews with personnel,
and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements. The violation, references to pertinent requirements,
and
elements to be included in your response are described in the enclosed Notice
of Violation.
In Accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
07120483 8806A2:3V
ADOCK 0500026.1
Q
PEIC
Carolina Power and Light Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosures:
2. NRC Inspection Report
cc w/encls:
G. P. Beatty, Jr., Vice President
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
bcc w/encls:
NRC Resident Inspector
.DRS,
Technical Assistant
Document Control Desk
State of South Carolina
O RH
4
PFredri ckon
67!-
/88