ML14184A195
| ML14184A195 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 01/21/1980 |
| From: | Bryant J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14184A192 | List: |
| References | |
| NUDOCS 8003270301 | |
| Download: ML14184A195 (2) | |
See also: IR 05000261/1979029
Text
o
UNITED STATES
S0
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
JAN 2 1 1980
In Reply Refer To:
RII:WHM
50-261/79-29
Carolina Power and Light Company
ATTN: Mr. J. A. Jones
Senior Executive Vice President and
Chief Operating Officer
411 Fayetteville Street
Raleigh, N C 27602
Gentlemen:
This refers to the inspection conducted by W. H. Miller, Jr. of this office on
December 10-14, 1979, of activities authorized by NRC Operating License No. DPR-23
for the H. B. Robinson facility, and to the discussion of our findings held with
R. B. Starkey, Jr. at the conclusion of the inspection.
Areas examined during this inspection included fire protection and prevention.
Within these areas, the inspection consisted of selective examinations of proce
dures and representative records, interviews with personnel, and observations by
the inspector.
Three new unresolved items resulted from this inspection and are discussed in
the enclosed report. These items will be examined during subsequent inspections.
Within the scope of this inspection, no items of noncompliance were disclosed.
During the .inspection it was found that certain activities under your license
appear to deviate from commitments to the Commission and have safety significance.
This item is identified in the Notice of Deviation enclosed herewith as Appendix A.
Please provide us in writing within 20 days of your receipt of this letter your
comments including a description of corrective actions that have been or will be
taken, corrective actions which will be taken to avoid further deviations, and
the date corrective actions were or will be completed.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
8003 270act
Carolina Power and Light
-2-JAN
Company
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
Bryan , Acting Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1. Appendix A, Notice of Deviation
2.
Inspection Report No. 50-261/79-29
cc w/encl:
R. B. Starkey, Jr., Plant Manager
P. 0. Box 790
Hartsville, S. C. 29550