Forwards Insp Rept 50-261/98-03 on 980105-09 & Notice of Violation.Four Apparent Violations Identified.Staff Failed to Implement Corrective Actions to Resolve Instrument Slope Line Deficiencies
ML14181A979
Person / Time
Site: Robinson 
Issue date: 02/06/1998
From: Jaudon J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Keenan J
CAROLINA POWER & LIGHT CO.
Shared Package
ML14181A980 List:
References
50-261-98-03, 50-261-98-3, EA-98-043, EA-98-43, NUDOCS 9802170031
Download: ML14181A979 (5)


See also: IR 05000261/1998003

Text

CATEGOK1 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9802170031

DOC.DATE: 98/02/06 NOTARIZED: NO

DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

UTH.NAME

AUTHOR AFFILIATION

UDON,J.P.

Region 2 (Post 820201)

RECIP.NAME

RECIPIENT AFFILIATION

KEENAN,J.S.

Carolina Power & Light Co.

SUBJECT: Forwards insp rept 50-261/98-03 on 980105-09 & notice of

violation.Four apparent violations identified.Staff failed

to implement corrective actions to resolve instrument slope

L

line deficiencies.

DISTRIBUTION CODE: IE01F COPIES RECEIVED:LTR I ENCL

SIZE: q

T

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response

E

NOTES:

G

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

0

PD2-1 PD

1

1

SHEA,J W

1

1

R

INTERNAL: AEOD/SPD/RAB

1

1

1

1

DEDRO

1

1

F

1

1

NRR/DRCH/HHFB

1

1

W

1

1

NRR/DRPM/PERB

1

1

NUDOCS-ABSTRACT

1

1

OE DIR

1

1

OGC/HDS3

1

1

RGN2

FILE

01

1

1

RNAL: LITCO BRYCE,J H

1

1

NOAC

1

1D

NRC PDR

1

1

NUDOCS FULLTEXT

1

1

0

C

U

E

N

T

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION,

CONTACT THE DOCUMENT CONTROL

DESK (DCD) ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES REQUIRED: LTTR

17

ENCL

17

February 6, 1998

EA 98-043

Carolina Power & Light Company

ATTN:

Mr. J. S. Keenan

Vice President

H. B. Robinson Steam Electric Plant Unit 2

3581 West Entrance Road

Hartsville, SC 29550

SUBJECT:

NOTICE OF VIOLATION AND NRC INSPECTION REPORT NO. 50-261/98-03

Dear Mr. Keenan:

This refers to the inspection~conducted on January 5-9, 1998, at the Robinson

Steam Electric Plant facility. The purpose of the inspection was to follow up

on the inspection findings from the NRC Design Inspection which was conducted

on April 7 - May 23, 1997. The enclosed report presents the results of this

inspection.

O

Based on the results of the. inspection, four violations were identified. We

are concerned that for Violation A your staff failed to implement corrective

actions to resolve the instrument slope line deficiencies, which had been

previously identified by NRC as violations in NRC Inspection Reports Number

50-261/94-17 and 50-261/95-30.. We are also concerned about Violations B and C

which were identified because of failure of your engineering staff to perform

an adequate 10 CFR 50.59 safety evaluation and failure to report changes in

peak cladding temperature as required by 10 CFR 50.46. Violation D was

identified for failure to provide accurate information to the Commission

regarding cable separation and redundancy in.

design of the safety inspection

pump.

These violations are cited in the enclosed Notice of Violation, and-the

circumstances surrounding the violations are described in detail in the

enclosed report. Please note that you are required to respond to this letter

and should follow the instructions specified in the enclosed Notice when

preparing your response. The NRC will use your response, in pa.rt, to

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements.

In addition, two apparent violations were identified and are being considered

for escalated enforcement action in accordance with the "General Statement of

Policy and Procedures for NRC Enforcement Actions" (Enforcement Policy),

NUREG-1600. The apparent violations involve the large number of calculation

deficiencies identified during the NRC Design Inspection which appear to be

indicative of a programmatic problem in the design control process, and the

9802170031 980206

511111111 I .

11111111

PDR

ADOCK 05000261

1 5

3

0

PDR

f~,

CP&L

2

potential inoperability of Safety Injection Pumps B and C due to insufficient

net positive suction head resulting from a modification implemented in.March,

1988. Accordingly, no Notice of Violation is presently being issued for these

inspection findings. In addition, please be advised that the number and

characterization of apparent violations described in the enclosed inspection

report may change as a result of further NRC review.

A predecisional enforcement conference to discuss these apparent violations

has been scheduled for February 19, 1998 at 1:30 p.m. in the Regional Office.

The decision to hold a predecisional enforcement conference does not mean that

the NRC has determined that a violation has occurred or that enforcement

action will be taken. This conference is being held to obtain information to

enable the NRC to make an enforcement decision, such as a common understanding

of the facts, root causes, missed opportunities to identify the apparent

violation sooner, corrective actions, significance of the issues and the need

for lasting and effective corrective action. In particular, we expect you to

address the common threads and root causes which resulted in the numerous

design calculation errors, and the inconsistencies in the UFSAR concerning

changes to the design and operation of emergency core cooling systems. In

addition, this is an opportunity for you to point out any errors in our

inspection report and for you to provide any information concerning your

.

perspectives on 1) the severity of the violations, 2) the application of the

factors that the NRC considers when it determines the amount of a civil

penalty that may be assessed in accordance with Section VI.B.2 of the

Enforcement Policy, and 3) any other application of the Enforcement Policy to

this case, including the exercise of discretion in accordance with Section

VII.

This conference will be open to public observation in accordance with Section

V of the Enforcement Policy (Enclosure 2).

You will be advised by separate correspondence of the results of our

deliberations on this matter. No response regarding these apparent violations

is required at this time.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

Sincerely,

Original signed by

Johns P. Jaudon

Johns P. Jaudon, Director

Division of Reactor Safety

Docket No. 50-261

License No. DPR-23

Enclosures: See page 3

CP&L

3

Enclosure:

1. Notice of Violation

2. NRC Inspection Report

3. Enforcement Policy: Section V, "Predecisional Enforcement

Conference"

cc w/encls:

Dale E. Young

T. M. Wilkerson, Manager

Director, Site Operations

Regulatory Affairs

Carolina Power & Light Company

Carolina Power & Light Company

H. B. Robinson Steam Electric Plant

H. B. Robinson Steam Electric Plant

3581 West Entrance Road

3581 W. Entrance Road

Hartsville, SC 29550

Hartsville, SC 29550

J. W. Moyer

Max Batavia, Chief

Plant General Manager

Bureau of Radiological Health

Carolina Power & Light Company

Dept. of Health and Environmental

H. B. Robinson Steam Electric Plant

Control

3581 West Entrance Road

2600 Bull Street

Hartsville. SC .29550

Columbia, SC 29201

D. B. Alexander, Manager

Mel Fry, Acting Director

Performance Evaluation and

Division of Radiation Protection

Regulatory Affairs

OHS7

N. C. Department of Environment,

Carolina Power & Light Company

Health and Natural Resources

412 S. Wilmington Street

3825 Barrett Drive

Raleigh, NC 27601

Raleigh, NC 27609-7721

H. K. Chernoff, Supervisor

William D. Johnson

Licensing/Regulatory Programs

Vice President & Senior Counsel

Carolina Power & Light Company

Carolina Power & Light Company

H. B. Robinson Steam Electric Plant

P. 0. Box 1551

3581 West Entrance Road

Raleigh, NC 27602

Hartsville, SC 29550

(cc w/encls cont'd - See page 4)

CP&L

4

(cc w/encls cont'd)

Karen E. Long

Distribution w/encl:

Assistant Attorney General

M. Shyrnock, Ru

State of North Carolina

J. Shea, NRR

P. 0. Box 629

J. Coley, Ru

Raleigh, NC 27602

R. Aiello, Ru

J. Lenahan, RII

Robert P. Gruber

F. Wright, Ru

Executive Director

D. Thompson, Ru

Public Staff - NCUC

D. Jones, Ru

P. 0. Box 29520

PUBLIC

Raleigh, NC 27626-0520

Public Service Commission

U.S. Nuclear Regulatory Commission

State of South Carolina

2112 West Old Camden Road

P. 0. Box 11649

Hartsville, SC 29550

Columbia, SC 29211

Hartsville Memorial Library

147 W. College Avenue

.Hartsville,

SC 29550S

OFFICE

RII:DRS

RII:DRS

RH DRS

RIJI:DRP

RI

I

SIGNATURE

AlR.

A

NME

K4apd

MiLLer

________

V_____________c

A~~aY_

DATE

J:

/98

/912

/,(

/98

2/

'

/

982_/98

2/

/98

2/

/98

________

-(S

NO

I

YES&*"

N

Nol

__________

NO___

_

YES__NO__YES

__________Z

--

YS

NOS

MO

_________

_________________

______

OFFICT1AC RECORD COPY

DO&CN36T NAKE: S:\\DRS\\EB\\ROB----3.JLl