Text
ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:8908230073
DOC.DATE: 89/08/01 NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
VERRELLI,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
EURY,L.W.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/89-12 on 890611-0710 & notice of
violation.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL
SIZE:p
"
TITLE: General (50 Dkt)-Insp Rept/Notice of Vi6lation esponse
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
AEOD/TPAD
1
1
DEDRO
1
1
LOIS,ERASMIA
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OE LIEBERMAN,J
1
1
OGC/HDS1
1
1
LE
02
1
1
RES MORISSEAU,D
1
1
(
7MFILE 01
1
1
TERNAL:
LPDR
1
1
NRC PDR
1
1
1
1
I
S
TOTAL NUMBER OF COPIES REQUIRED: LTTR
24
ENCL
24
AUI 01 19
Docket No:- 50-261
License No:
Carolina Power and Light Company
ATTN:
Mr. Lynn W. Eury
Executive Vice President
Power Supply
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/89-12)
This refers to the Nuclear Regulatory Commission (NRC)
inspection conducted by
L. W. Garner on June 11 - July 10, 1989.
The inspection included a review of
activities authorized for your H. B. Robinson facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel,
and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violation, references to pertinent requirements,
and
elements to be included in your response are described in the enclosed Notice
of Violation.
In addition to the need for corrective action regarding the specific matters
identified in the enclosed Notice, we are concerned about the implementation
of your management control of reactor protection system setpoints.
Although
identified by your staff, the conditions existed for an extended period of
time. Consequently, your response should describe those particular actions
taken or planned to improve the effectiveness of your program.
Your attention is invited to unresolved items identified in the inspection
report. This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
(IIII
89082 30073 890801
ADOCK.. 050 00261- 1
Q
~PDC:
Carolina Power and Light Company
2
$US 0 1 1989
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget. as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosures:
2. NRC Inspection Report
cc w/encls:
C. R. Dietz, Manager Robinson
Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encls:
NRC Resident Inspector
Document Control Desk
RII:DRP
HDan
W2
OV/j /89