ML14176A747

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/89-12 on 890611-0710 & Notice of Violation.Stated Mgt Control Concerns Noted
ML14176A747
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/01/1989
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
Shared Package
ML14176A749 List:
References
NUDOCS 8908230073
Download: ML14176A747 (3)


See also: IR 05000261/1989012

Text

ACCELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:8908230073

DOC.DATE: 89/08/01 NOTARIZED: NO

DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

AUTH.NAME

AUTHOR AFFILIATION

VERRELLI,D.M.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

EURY,L.W.

Carolina Power & Light Co.

SUBJECT: Forwards Insp Rept 50-261/89-12 on 890611-0710 & notice of

violation.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR

ENCL

SIZE:p

"

TITLE: General (50 Dkt)-Insp Rept/Notice of Vi6lation esponse

NOTES:

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 PD

1

1

LO,R

1

1

INTERNAL: AEOD

1

1

AEOD/DEIIB

1

1

AEOD/TPAD

1

1

DEDRO

1

1

LOIS,ERASMIA

1

1

NRR SHANKMAN,S

1

1

NRR/DEST DIR

1

1

NRR/DLPQ/PEB

1

1

NRR/DOEA DIR 11

1

1

NRR/DREP/EPB 10

1

1

NRR/DREP/RPB 10

2

2

NRR/PMAS/ILRB12

1

1

NUDOCS-ABSTRACT

1

1

OE LIEBERMAN,J

1

1

OGC/HDS1

1

1

LE

02

1

1

RES MORISSEAU,D

1

1

(

7MFILE 01

1

1

TERNAL:

LPDR

1

1

NRC PDR

1

1

NSIC

1

1

I

S

TOTAL NUMBER OF COPIES REQUIRED: LTTR

24

ENCL

24

AUI 01 19

Docket No:- 50-261

License No:

DPR-23

Carolina Power and Light Company

ATTN:

Mr. Lynn W. Eury

Executive Vice President

Power Supply

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-261/89-12)

This refers to the Nuclear Regulatory Commission (NRC)

inspection conducted by

L. W. Garner on June 11 - July 10, 1989.

The inspection included a review of

activities authorized for your H. B. Robinson facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel,

and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

The violation, references to pertinent requirements,

and

elements to be included in your response are described in the enclosed Notice

of Violation.

In addition to the need for corrective action regarding the specific matters

identified in the enclosed Notice, we are concerned about the implementation

of your management control of reactor protection system setpoints.

Although

identified by your staff, the conditions existed for an extended period of

time. Consequently, your response should describe those particular actions

taken or planned to improve the effectiveness of your program.

Your attention is invited to unresolved items identified in the inspection

report. This matter will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

(IIII

89082 30073 890801

PDR

ADOCK.. 050 00261- 1

Q

~PDC:

Carolina Power and Light Company

2

$US 0 1 1989

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget. as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls:

C. R. Dietz, Manager Robinson

Nuclear Project Department

R. E. Morgan, Plant General Manager

State of South Carolina

bcc w/encls:

NRC Resident Inspector

Document Control Desk

RII:DRP

HDan

W2

OV/j /89