MONTHYEARML12170A8682012-06-11011 June 2012 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) Project stage: Request ML12170A8692012-06-30030 June 2012 Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition Project stage: Request ML12221A0152012-08-0808 August 2012 Issuance of Amendments License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants Project stage: Approval ML12222A0292012-08-0909 August 2012 Correction to Acceptance Letter - Nine Mile Point Nuclear Station, Unit No. 1 - License Amendment Request Pursuant to 10CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generat Project stage: Acceptance Review ML12319A2632012-11-13013 November 2012 ME8899 Draft RAIs License Amendment Request to Adopt NFPA-805 Project stage: Draft RAI ML13003A0692013-01-0303 January 2013 Announcement of 2013 Generic Fundamentals Examination Administration Dates, Letter Dated 1/3/2013 Project stage: Request ML12361A0502013-01-0303 January 2013 Request for Additional Information Regarding License Amendment Request for Adoption of NFPA 805 Project stage: RAI ML13064A4662013-02-27027 February 2013 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to NRC RAI Project stage: Response to RAI ML13092A1392013-03-27027 March 2013 Response to NRC Request for Additional Information on License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants Project stage: Response to RAI ML13127A3952013-04-30030 April 2013 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to NRC Rai. Part 1 of 3 Project stage: Response to RAI ML13127A3972013-04-30030 April 2013 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to NRC Rai. Part 2 of 3 Project stage: Response to RAI ML13127A3982013-04-30030 April 2013 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to NRC Rai. Part 3 of 3 Project stage: Response to RAI ML13282A6292013-10-0909 October 2013 ME8899, Second Round of Request for Additional Information (Rais) License Amendment Request (LAR) to Adopt NFPA-805 Project stage: RAI ML13281A0102013-10-0909 October 2013 Second Round of Request for Additional Information Regarding License Amendment Request for Adoption of NFPA 805 Project stage: RAI ML13347B1872013-12-0909 December 2013 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to Nrc.... Project stage: Request ML14024A4162014-01-22022 January 2014 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Ed.) - Response to NRC Request for Additional Project stage: Request ML14030A3772014-02-12012 February 2014 Third Round of Request for Additional Information Regarding License Amendment Request for Adoption of NFPA 805 Project stage: RAI ML14085A1612014-03-14014 March 2014 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to NRC Request for Project stage: Request ML14087A2742014-03-28028 March 2014 ISFSI, Nine Mile Point Units 1 & 2 and R. E. Ginna - Pending NRC Actions Requested by Constellation Energy Nuclear Group, LLC Project stage: Request ML14106A2112014-04-15015 April 2014 Submittal of Exelon Corporation Support Agreement Following License Transfers Project stage: Request ML14113A1752014-04-15015 April 2014 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to NRC RAI Project stage: Response to RAI ML14132A1992014-05-0909 May 2014 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to Nrc Project stage: Request 05000410/LER-2014-005, Regarding Secondary Containment Inoperable Due to Sustained High Winds2014-05-0909 May 2014 Regarding Secondary Containment Inoperable Due to Sustained High Winds Project stage: Request ML14149A3562014-05-23023 May 2014 License Amendment Request, Per 10CFR50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)-Supplemental Information Regarding Fire PRA Mode Project stage: Supplement 05000410/LER-2014-006, Regarding Secondary Containment Inoperability Following Auxiliary Boiler Trip2014-05-23023 May 2014 Regarding Secondary Containment Inoperability Following Auxiliary Boiler Trip Project stage: Request ML14181B0862014-06-30030 June 2014 (NMP1), ME8899, Email from Licensee to Confirm the Change from Nine Mile Point Nuclear Station LLC, to Exelon Generation LAR to Adopt NFPA 805 Project stage: Other ML14126A0032014-06-30030 June 2014 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) Project stage: Approval 2013-03-27
[Table View] |
Text
This letter forwards Security-Related Information in accordance with 10 CFR 2.390. The balance of this letter is considered non-Security Related upon removal of Attachments 4 through 6.
1 Christopher R. Costanzo Vice President - Nine Mile Point CENG.
a joint venture of FleConstellation wEnergy*
w#bD Office: 315-349-5200 Fax: 315-349-1321 E-mail: Christopher.Constanzo@cengllc.com NINE MILE POINT NUCLEAR STATION March 14, 2014 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:
SUBJECT:
Document Control Desk Nine Mile Point Nuclear Station, Unit I Renewed Facility Operating License No. DPR-63 Docket No. 50-220 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to NRC Request for Additional Information (TAC No. ME8899)
REFERENCES:
(a) Letter from K. Langdon (NMPNS) to Document Control Desk (NRC), dated June 11, 2012, License Amendment Request Pursuant to 10 CFR 50.90:
Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)
(b) Letter from B. Vaidya (NRC) to C. Costanzo (NMPNS), dated February 12, 2014 Nine Mile Point Nuclear Station, Unit No. 1 - Third Round of Request for Additional Information Regarding License Amendment Request for Adoption of NFPA 805 (TAC No. ME8899)
Nine Mile Point Nuclear Station, LLC (NMPNS) hereby transmits supplemental information requested by the NRC in support of a previously submitted request for an amendment to Nine Mile Point Unit 1 (NMP1) Renewed Operating License DPR-63. The initial request, dated June 11, 2012 (Reference a),
proposed the adoption of a new risk-informed performance-based (RI-PB) fire protection licensing basis which complies with the requirements in 10 CFR 50.48(a) and 10 CFR 50.48(c); the guidance in Regulatory Guide (RG) 1.205, "Risk-Informed Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants," Revision 1; and National Fire Protection Association (NFPA) 805, Nine Mile Point Nuclear Station, LLC P.O. Box 63, Lycoming, NY 13093 This letter forwards Security-Related Information in accordance with 10 CFR 2.390. The balance of this letter is considered non-Security Related upon removal of Attachments 4 through 6.
I I
Document Control Desk March 14, 2014 Page 2 "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants,"
2001 Edition.
The supplemental information, provided in Attachment 1 to this letter, responds to the Probabilistic Risk Assessment (PRA) request for additional information (RAI) documented in the NRC's letter dated February 12, 2014 (Reference b). As indicated in the letter, the response for the third round RAI responses would be submitted no later than February 27, 2014. On February 18, 2014, NMPNS and the NRC staff held a conference call to discuss the RAI responses. Based on the clarifying information received during the call, NMPNS expressed the need for additional time to prepare the RAI responses.
NMPNS and the NRC staff agreed that the third round RAI responses will be submitted by March 14, 2014, as indicated in an email from B. Varga (NMPNS) to B. Vaidya (NRC) on February 26, 2014.
Revisions to the originally submitted Transition Report Attachments C, G, S, and W are provided in Attachments 2 through 6 of this letter as a result of the PRA RAI responses and additional analysis that has been performed.
This supplemental information contained in this letter does not affect the No Significant Hazards Consideration Determination analysis provided by NMPNS in Reference (a). Pursuant to 10 CFR 50.91(b)(1), NMPNS has provided a copy of this supplemental information to the appropriate state representative.
There are no regulatory commitments contained in this letter.
Should you have any questions regarding the information in this submittal, please contact Everett (Chip)
Perkins, Director-Licensing, at (315) 349-5219.
I declare under penalty of perjury that the foregoing is true and correct. Executed on March 14, 2014.
Sincerely, CRC/BTV Attachments
- 1. Nine Mile Point Unit 1 Response to NRC Request for Additional Information Regarding the Proposed Adoption of NFPA 805 (2001 Edition)
- 2. Revisions to the Redacted LAR Transition Report, Attachment C
- 3. Revisions to the LAR Transition Report, Attachment G
- 4. Revisions to the Non-Redacted LAR Transition Report, Attachment C
- 5. Revisions to the Non-Redacted LAR Transition Report, Attachment S
- 6. Revisions to the Non-Redacted LAR Transition Report, Attachment W cc:
Regional Administrator, Region I, NRC Project Manager, NRC Resident Inspector, NRC A. L. Peterson, NYSERDA (w/o Attachments 4 through 6)