CRO-115 - a Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-115 Withdraw Control Rod Group One to 50%

CANDIDATE EXAMINER

CRO-115 - a Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Latch Group 7 Control rods and withdraw Safety Rod Group 1 to 50%

Alternate Path:

No Facility JPM #:

CRO-111 K/A Rating(s):

System: 001 K/A: A4.06 Rating: 2.9/3.2 Task Standard:

Latch Group 7 Control Rod and withdraw Safety Rod Group 1 To 50% in accordance with OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X ___ In-Plant ___ ___ Perform __X___ Simulate __ __

References:

OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)

OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1)

Validation Time: 14 min. Time Critical: No

========================================================================

Candidate: _______________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

========================================================================

Comments

CRO-115 - a Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS

1. RECALL Snap 213
2. Go To RUN

CRO-115 - a Page 4 of 10 Tools/Equipment/Procedures Needed OP/1/A./1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 1 startup in progress following a 28 day refueling outage Tc = 536ºF RCS pressure = 2155 psig OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1) is in progress at step 2.6.5 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) is in progress and has been completed through step 4.8 (Groups 1 through 6 have been manually latched).

INITIATING CUE The Control Room SRO directs you to continue with OP1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) beginning at Step 4.9.

Latch of groups 1 - 6 is complete. Manual Latch of Group 7 is required.

CRO-115 - a Page 5 of 10 START TIME: _______

STEP 1: Step 4.9 Perform latch and PI alignment of Group 7, as follows: CRITICAL STEP 4.9.1 Ensure GROUP SELECT SWITCH to 7.

___ SAT STANDARD: Ensures Group Select Switch selected to Group 7 COMMENTS:

___ UNSAT STEP 2: Step 4.9.2 Verify only Group 7 CONTROL ON lights are ON. (PI panel)

___ SAT STANDARD: Verifies only Group 7 lights are ON COMMENTS: ___ UNSAT STEP 3: Step 4.9.3 *CRITICAL STEP IF Manual Latch and PI Alignment desired, perform the following: (R.M.)

A. *Ensure LATCH MANUAL is ON.

B. *Ensure IN LIMIT BYPASS is ON.

C. *Insert Group 7 for 5 seconds.

D. Verify all 0% lights ON for Group 7. (PI Panel)

E. *Ensure LATCH MANUAL is OFF.

F. *Ensure IN LIMIT BYPASS is OFF. ___ SAT G. Select RPI RESET.

H. Verify Group 7 API/RPI indications agree. (PI Panel)

STANDARD: Candidate performs A - H above to manually latch the Group 7 rods

___ UNSAT COMMENTS:

CRO-115 - a Page 6 of 10 STEP 4: Step 4.10 Reset Group 8 RPI, as follows:

4.10.1 Ensure GROUP SELECT SWITCH to 8.

___ SAT STANDARD: Candidate places the Group Select Switch to Group 8 COMMENTS:

___ UNSAT STEP 5: Step 4.10.2 Verify Group 8 CONTROL ON lights are ON. (PI panel)

___ SAT STANDARD: Candidate verifies that only the Group 8 lights are ON COMMENTS: ___ UNSAT STEP 6: Step 4.10.3 Select RPI RESET

___ SAT STANDARD: Candidate depresses the RPI reset selector

___ UNSAT COMMENTS:

STEP 7: Step 4.10.4 Verify Group 8 API/RPI indications agree. (PI Panel)

___ SAT STANDARD: Candidate uses toggle switch to confirm that API/RPI indications agree.

___ UNSAT COMMENTS:

CRO-115 - a Page 7 of 10 STEP 8: Step 4.11 Select FAULT RESET.

STANDARD: Candidate depresses the FAULT RESET selector. ___ SAT COMMENTS:

___ UNSAT NOTE:

For the purpose of this procedure, an extended forced outage is an outage greater than 92 days where the Reactor Vessel Head is NOT removed. SR 3.1.4.2 requires the Control Rods to be tested for movement prior to entry into MODE 2.

STEP 9: Step 4.12

___ SAT IF OWPG requires the Control Rods to be withdrawn due to an extended forced outage, perform PT/1/A/0600/015 (Control Rod Movement) for testing CRD Groups 1 thru 7 during unit startup.

___ UNSAT STANDARD: Candidate determines from initiating cue that this startup is not from a forced outage of greater than 92 days and therefore this step is N/A.

EXAMINER CUE: If asked, this startup is a return to power following a 28 day refueling outage.

COMMENTS:

STEP 10: Step 4.13 Select Group 1, as follows: CRITICAL STEP 4.13.1 Ensure GROUP SELECT SWITCH to 1.

STANDARD: Candidate selects Group 1 on GROUP SELECT SWITCH.

___ SAT COMMENTS:

___ UNSAT

CRO-115 - a Page 8 of 10 STEP 11: Step 4.13.2:

Verify only Group 1 CONTROL ON lights are ON. (PI panel)

STANDARD: Candidate verifies only the Group 1 lights are ON. ___ SAT COMMENTS:

___ UNSAT STEP 12: Step 4.13.3: CRITICAL STEP Ensure Group 1 at 50%.

___ SAT STANDARD: Candidate withdraws the Group 1 rods to 50%.

COMMENTS: ___ UNSAT STEP 10: Step 4.13.4:

Place GROUP SELECT SWITCH to OFF.

STANDARD: Candidate places the GROUP SELECT SWITCH to OFF. ___ SAT COMMENTS:

___ UNSAT END TASK TIME STOP: ________

CRO-115 - a Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to latch Group 7 of rods. If performed incorrectly the results would be the inability to withdraw Group 7 during the startup.

3 This step is required to latch Group 7 of rods. If performed incorrectly the results would be the inability to withdraw Group 7 during the startup.

10 This step is required to select the correct group of rods for withdrawal.

12 This step is required withdraw the Group 1 rods to 50% as directed..

a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 startup in progress following a 28 day refueling outage Tc = 536ºF RCS pressure = 2155 psig OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1) is in progress at step 2.6.5 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) is in progress and has been completed through step 4.8 (Groups 1 through 6 have been manually latched).

INITIATING CUE The Control Room SRO directs you to continue with OP1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) beginning at Step 4.9.

Latch of groups 1 - 6 is complete. Manual Latch of Group 7 is required.

CRO-223 R0 - b Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-223 BYPASS ES SUBSYSTEM 2 CANDIDATE EXAMINER

CRO-223 R0 - b Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Remove ES Subsystem 2 from service.

Alternate Path:

No Facility JPM #:

CRO-223 K/A Rating(s):

System: 013 K/A: A4.02 Rating: 4.3/4.4 Task Standard:

The candidate will remove the ES Subsystem 2 from service in accordance with OP/1/A/1105/014 Enclosure 4.9 (Removal and restoration of ES channels) beginning with step 3.3.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X___ In-Plant ______ Perform __X___ Simulate __ __

References:

OP/1/A/1105/014 Enclosure 4.9 (Removal and restoration of ES channels)

Validation Time: 10 min. Time Critical: No

========================================================================

Candidate: _______________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

========================================================================

Comments

CRO-223 R0 - b Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall IC-41
2. Verify the Examiner has the ES cabinet key (#317) and both ES bypass keys (#316).
3. Ensure all breaker flags are in the current plant condition.
4. Go to RUN.

CRO-223 R0 - b Page 4 of 9 Tools/Equipment/Procedures Needed:

OP/1/A/1105/014 Enclosure 4.9 Removal and restoration of ES channels READ TO OPERATOR DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The Unit 1 Reactor is at 100% power.

A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service.

The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power.

OP/1/1105/014 Enclosure 4.9 has been completed up to step 3.3.

INITIATING CUE:

The CRS directs you to remove ES Subsystem 2 from service per OP/1/A/1105/014 Enclosure 4.9 beginning with step 3.3.

CRO-223 R0 - b Page 5 of 9 START TIME: _______

STEP 1: Step 3.3 If removal of any or all of Only ES subsystem 2 channels from service is required, perform Section 6 Removal of Only ES Subsystem 2 ___ SAT STANDARD: Candidate proceeds to Section 6

___ UNSAT COMMENTS:

STEP 2: Step 6.1:

IF Unit 1 ES Subsystem 2 is NOT required per TS 3.3.5 and 3.3.7, ___ SAT perform the following to remove from service any or all of only Unit 1 ES Subsystem 2 channels.

STANDARD: Candidate determines that ES Subsystem 2 is not required by TS 3.3.5 ___ UNSAT and 3.3.7 COMMENTS:

STEP 3: Step 6.1.1 IF Unit 1 ES Subsystem 1 is required per TS 3.3.5 and 3.3.7, verify the following: ___ SAT

  • Voter Odd 1 NOT bypassed (1SA-7)
  • Voter Even 1 NOT bypassed (1SA-7)

STANDARD: The candidate determines that the Unit 1 ES Subsystem is required per TS 3.3.5 and 3.3.7 and verifies there are no alarms present on ISA-7.

  • Voter Odd 1 NOT bypassed (1SA-7/D1)
  • Voter Even 1 NOT bypassed (1SA-7/E1)

Examiner cue: Candidate may elect to perform a STAT alarm test to help ensure no alarms are present on 1SA-7. If asked, give him permission (as CR SRO) to perform alarm test. (The other RO will be required to help perform the test).

COMMENTS:

CRO-223 R0 - b Page 6 of 9 STEP 4: Step 6.1.2.A Declare Unit 1 ES Subsystem 2 channels inoperable

___ SAT STANDARD: Candidate reports that procedure requires declaration of ES Subsystem 2 channels inoperable Cue: Acknowledge Unit 1 ES Subsystem 2 channel inoperable.

___ UNSAT COMMENTS:

STEP 5: Step 6.1.2.B Obtain MAN BYPASS 2 Key #316 (2 keys are required to bypass both ___ SAT voters).

STANDARD: Candidate obtains correct keys (examiner provides)

___ UNSAT Cue: Provide the candidate with the correct keys. Keys are normally kept in the key locker in the WCC.

COMMENTS:

STEP 6: Step 6.1.2.C CRITICAL STEP IF bypassing Odd Voter 2, place MAN BYPASS 2 keyswitch in "BYP".

(Cabinet 12) ___ SAT STANDARD: Candidate places the MAN BYPASS 2 keyswitch in Cabinet 12 in the BYP position

___ UNSAT COMMENTS:

STEP 7: Step 6.1.2.D CRITICAL STEP IF bypassing Even Voter 2, place MAN BYPASS 2 keyswitch in "BYP".

(Cabinet 14) ___ SAT STANDARD: Candidate places the MAN BYPASS 2 keyswitch in Cabinet 14 in the BYP position and returns and signs step 3.3

___ UNSAT COMMENTS:

CRO-223 R0 - b Page 7 of 9 STEP 8: Step 3.4 If trip of ES input channels is required, perform one of the following: ___ SAT STANDARD: Candidate NAs this step COMMENTS: ___ UNSAT STEP 9: Step 3.5 If bypassing DHPIAS is required, perform Section 10... ___ SAT STANDARD: Candidate NAs this step

___ UNSAT COMMENTS:

STEP 10: Step 3.6 If bypassing DLPIAS is required, perform Section 11... ___ SAT STANDARD: Candidate NAs this step

___ UNSAT COMMENTS:

STEP 11: Step 3.7 If any ES channel was removed from service due to equipment failure, ___ SAT perform Section 12.

STANDARD: Candidate determines that no ES channel was removed and NAs this step ___ UNSAT COMMENTS:

STEP 12: Step 3.7 WHEN notified by I&E, restore ES channels by performing Section 13... ___ SAT STANDARD: NO actions are required Cue: Another operator will continue with this procedure. ___ UNSAT COMMENTS:

TIME STOP: ________

CRO-223 R0 - b Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP # Explanation 6 This step is critical because it is part 1 of removing all of ES Subsystem 2 from service 7 This step is critical because it is part 2 of removing all of ES Subsystem 2 from service

b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The Unit 1 Reactor is at 100% power.

A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service.

The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power.

OP/1/1105/014 Enclosure 4.9 has been completed up to step 3.3.

INITIATING CUE:

The CRS directs you to remove ES Subsystem 2 from service per OP/1/A/1105/014 Enclosure 4.9 beginning with step 3.3.

CRO-404 R0 - c Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-404 Alignment of Condensate Recirc CANDIDATE EXAMINER

CRO-404 R0 - c Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Establish Alignment of Condensate Recirc and set flow.

Alternate Path:

Yes Facility JPM #:

CRO-404 K/A Rating(s):

System: APE054 K/A: G2.1.20 Rating: 4.6/4.6 Task Standard:

Condensate recirculation flow of 2300-6000 gpm is established.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____

References:

EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5.23 (Alignment of Condensate Recirc).

Validation Time: 10 minutes Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-404 R0 - c Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 214
2. IMPORT files for CRO-404
3. Go to RUN

CRO-404 R0 - c Page 4 of 11 Tools/Equipment/Procedures Needed:

EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5.23 (Alignment of Condensate Recirc)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator.

During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 RCPs.

The SGTR tab is in progress and is completed up to step 107.

INITIATING CUES:

The CRS directs you to perform Enclosure 5.23 (Alignment of Condensate Recirc).

CRO-404 R0 - c Page 5 of 11 START TIME: _______

STEP 1: Step 1.

Verify any HWP operating.

___ SAT STANDARD: Determine the 1A HWP is operating (located on 1AB1) by observing the red run light illuminated and pump amps are on scale.

Continues to Step 2

___ UNSAT COMMENTS:

STEP 2: Step 24 Verify any CBP operating.

___ SAT STANDARD: Determine that NO CBP is operating by observing the green off lights on 1AB1 are illuminated for each CBP and then perform the RNO.

Continues to Step 2 RNO ___ UNSAT COMMENTS:

STEP 3: Step 2 RNO

___ SAT GO TO Step 7.

STANDARD: Continues to Step 7

___ UNSAT COMMENTS:

CRO-404 R0 - c Page 6 of 11 STEP 4: Step 7 Ensure two HWPs operating

___ SAT STANDARD: Determines that only the 1A HWP is operating, per step 1.

___ UNSAT Rotates the 1B HWP switch (located on 1AB1) to the START position, verifies the red ON light illuminates, and verifies pump amps increase and return to normal.

OR Rotates the 1C HWP switch (located on 1AB1) to the START position, verifies the red ON light illuminates, and verifies pump amps increase and return to normal.

Continues to Step 8 COMMENTS:

ALTERNATE PATH

___ SAT STEP 5: Step 8 Start the 1C COND BOOSTER PUMP.

___ UNSAT STANDARD: Rotate the 1C COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes that the pump does not start by noting the green stop light remains illuminated and the red start light remains OFF.

Continues to RNO to Step 8 Note: The 1C Cond Booster Pump will not start.

COMMENTS:

CRO-404 R0 - c Page 7 of 11 STEP 6: RNO: Step 8 CRITICAL STEP Start one available CBP.

___ SAT STANDARD: Rotates the 1A COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal. ___ UNSAT OR Rotates the 1B COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal.

Continues to Step 9 COMMENTS:

STEP 7: Step 9 Stop one operating HWP.

___ SAT STANDARD: Rotates the switch for a running HWP (Either 1A, 1B, or 1C) to the OFF position. Verifies the Red run light OFF, and the Green stop light illuminated. ___ UNSAT Continues to Step 10 COMMENTS:

STEP 8: Step 10 ___ SAT Place the control switch for one secured HWP in AUTO STANDARD: Places a non running HWP switch (1A or 1B) to AUTO. ___ UNSAT Continues to Step 11 COMMENTS:

CRO-404 R0 - c Page 8 of 11 STEP 9: Step 11 Place the control switch for one secured CBP in AUTO. ___ SAT STANDARD: Places the non running CBP (1A or 1B) switch in AUTO.

Continues to Step 12 ___ UNSAT NOTE: 1C CBP switch should NOT be selected since the pump will not start.

COMMENTS:

CRITICAL STEP STEP 10: Step 12 Perform the following:

___ SAT

  • Position HWP LOAD SHED DEFEAT switch to a running HWP.
  • Position CBP LOAD SHED DEFEAT switch to a running CBP

___ UNSAT STANDARD: Positions the HWP LOAD SHED DEFEAT switch to the running HWP, (1A, 1B, or 1C)

Positions the CBP LOAD SHED DEFEAT switch to the running CBP, (1A or 1B )

Continues to Step 13 COMMENTS:

STEP 11: Step 13 Place the following in MANUAL:

___ SAT

  • 1FDW-65 STANDARD: Locate the Moore controller on 1VB3 for each valve listed above and ___ UNSAT determine they are in MANUAL by the MANUAL light being Lit.

Continues to Step 14 COMMENTS:

CRO-404 R0 - c Page 9 of 11 STEP 12: Step 14 CRITICAL STEP Establish 2300-6000 gpm total recirc flow with one of the following:

___ SAT

___ UNSAT STANDARD: Candidate locates the Moore controller for 1FDW-53 or 1FDW-65 and using the manual loader adjusts one to a total recirc flow of 2300-6000 gpm.

Note: Controller must be selected to the P position to observe flow.

Cue: Inform candidate that another RO will complete this enclosure and this JPM is finished COMMENTS:

STOP TIME: ____________

CRO-404 R0 - c Page 10 of 11 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 6 Required to properly align Condensate recirc.

10 Required to ensure proper secondary pump response to a loss of power 12 Required to establish proper flow for Condensate recirc.

c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator.

During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 RCPs.

The SGTR tab is in progress and is completed up to step 107.

INITIATING CUES:

The CRS directs you to perform Enclosure 5.23 (Alignment of Condensate Recirc).

CRO-414 R0 - d Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-414 SWAPPING LPI MODES - HIGH PRESSURE MODE TO LPI NORMAL DECAY HEAT MODE CANDIDATE EXAMINER

CRO-414 R0 - d Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode Alternate Path:

No Facility JPM #:

CRO-092 K/A Rating(s):

System: 005 K/A: A4.01 Rating: 3.6*/3.4 Task Standard:

Swap LPI from Series Mode to Normal Mode by procedure.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant ____ Perform __X___ Simulate __ __

References:

OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode)

OP/1/A/1104/004, Enclosure 4.44 (Controlling LPI Cooler Outlet Temperature)

Validation Time: 20 minutes Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-414 R0 - d Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL SNAP 215
2. Place simulator to RUN
3. When asked manipulate the following LP vales using the valve program:

CRO-414 R0 - d Page 4 of 10 Tools/Equipment/Procedures Needed:

OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - High Pressure Mode to LPI Normal Mode)

OP/1/A/1104/004, Enclosure 4.44 (Controlling LPI Cooler Outlet Temperature)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 shutdown in progress INITIATING CUES:

The CRS directs you to perform OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.3.

CRO-414 R0 - d Page 5 of 10 START TIME: _______

STEP 1: Step 2.3 CRITICAL STEP Position:

___ SAT

STANDARD: Remove the cover from the switches for the following valves and OPEN them by placing their respective switches in the open position.

Verify red light illuminates and green light goes off.

Verify red light illuminates and green light goes off.

Verify red light illuminates and green light goes off.

Verify red light illuminates and green light goes off.

COMMENTS:

STEP 2: Step 2.4 CRITICAL STEP Position:

___ SAT

  • Open 1LP-4 (Return Manual Block). (A-61)

STANDARD: Dispatch an NEO to open 1LP-4.

___ UNSAT Booth Cue: Open 1LP-4 by using the Valve program and using time compression inform the candidate that 1LP-4 is open.

COMMENTS:

CRO-414 R0 - d Page 6 of 10 STEP 3: Step 2.5 CRITICAL STEP Ensure:

___ SAT

  • Close 1LP-73 (1B LPI Cooler Switchover Disch Block). (A-1-108)
  • Close 1LP-74 (B Clr Disch Blk To A Pmp). (A-61)
  • Close 1LP-75 (1B LPI Cooler Disch Block To 1C LPI Pump). (A-61) ___ UNSAT STANDARD: Dispatch an NEO to CLOSE:
  • 1LP-73 (1B LPI Cooler Switchover Disch Block). (A-1-108)
  • 1LP-74 (B Clr Disch Blk To A Pmp). (A-61)

Booth cue: CLOSE 1LP-73, 1LP-74, and 1LP-75 by using the Valve program and using time compression inform the candidate that the valves are CLOSED.

COMMENTS:

STEP 4: Step 2.6 CRITICAL STEP Close 1LP-14 (1B LPI Cooler Outlet)

___ SAT STANDARD: CLOSE 1LP-14 it by placing the switch in the close position and observe green closed light lit.

___ UNSAT Note: Valve has a long stroke time (1:50 sec)

COMMENTS:

STEP 5: Step 2.7 Record 1A LPI cooler outlet temperature ________°F.

___ SAT STANDARD: Locate the 1A LPI cooler outlet temperature indicator on 1UB2 and record 1A LPI cooler outlet temperature on the procedure.

___ UNSAT COMMENTS:

CRO-414 R0 - d Page 7 of 10 STEP 6: Step 2.8 Ensure open 1LP-9 (1C LPIP DISCH TO 1A LPI HDR).

___ SAT STANDARD: Determine 1LP-9 located on 1UB2 is OPEN by verifying the red OPEN light illuminated.

___ UNSAT COMMENTS:

STEP 7: Step 2.9 CRITICAL STEP Open 1LP-10 (1C LPIP DISCH TO 1B LPI HDR).

___ SAT STANDARD: Open 1LP-10 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out. ___ UNSAT COMMENTS:

STEP 8: Step 2.10 CRITICAL STEP Open 1LP-14 (1B LPI COOLER OUTLET).

___ SAT STANDARD: Open 1LP-14 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out. ___ UNSAT Note: Valve has a long stroke time (1:50 sec)

COMMENTS:

CRO-414 R0 - d Page 8 of 10 NOTE: Do NOT exceed 6000 gpm LPSW flow per cooler. CRITICAL STEP

___ SAT STEP 9: Step 2.11 Adjust LPSW flow to 1B LPI Coolers per Enclosure 4.44 "Controlling LPI Cooler Outlet Temperature" to match 1B DH Cooler outlet temperature to 1A DH Cooler outlet temperature. ___ UNSAT STANDARD: Refer to Enclosure 4.44 "Controlling LPI Cooler Outlet Temperature" and adjust LPSW flow to 1B LPI Coolers by positioning 1LPSW-252 Controller Setpoint so that 1B DH Cooler outlet temperature is approaching 1A DH Cooler outlet temperature (Temperature as noted at step 2.7).

COMMENTS:

END TASK STOP TIME: ____________

CRO-414 R0 - d Page 9 of 10 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 1 Step is required to complete the required valve lineup.

2 Step is required to complete the required valve lineup.

3 Step is required to complete the required valve lineup.

4 Step is required to complete the required valve lineup.

7 Step is required to complete the required valve lineup.

8 Step is required to complete the required valve lineup.

9 Step is required to ensure proper thermal transition to 1B LPI Cooler.

d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 shutdown in progress INITIATING CUES:

The CRS directs you to perform OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.3.

CRO-508 R0 - e Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-508 ES Channels 5 and 6 Recovery CANDIDATE EXAMINER

CRO-508 R0 - e Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

ES Channels 5 and 6 Recovery Alternate Path:

No Facility JPM #:

New K/A Rating(s):

System: 103 K/A: A4.04 Rating: 3.5*/3.5*

Task Standard:

ES Channels 5 and 6 are returned to normal using EOP Enclosure 5.41 (ES Recovery).

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____

References:

EOP Encl. 5.41 (ES Recovery)

Validation Time: 15 minutes Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-508 R0 - e Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 216
2. IMPORT files for CRO-508
3. Go to RUN

CRO-508 R0 - e Page 4 of 11 Tools/Equipment/Procedures Needed:

EOP Encl. 5.41 (ES Recovery)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A MSLB has occurred.

ES Channels 1 - 6 have actuated on High RB pressure.

EOP Encl. 5.1 (ES Actuation) is complete ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40 INITIATING CUES:

The CRS directs you to continue in EOP Encl. 5.41 (ES Recovery) beginning at step 41.

CRO-508 R0 - e Page 5 of 11 START TIME: _______

STEP 1: Step 41 Verify reset of any of the following is desired: ___ SAT

  • ES Channel 5
  • ES Channel 6

___ UNSAT STANDARD: Determines, from Initiating Cue, that reset of ES Channels 5 and 6 is desired.

COMMENTS:

STEP 2: Step 42 Verify Stat Alarms have cleared:

___ SAT

STANDARD: Determine that all of the above statalarms on 1SA-7 are clear by observing that their respective window lights are NOT illuminated.

COMMENTS:

STEP 3: Step 43 CRTICAL STEP Perform the following to reset ES (1UB1):

___ SAT

  • Depress RESET for CH 5.
  • Depress RESET for CH 6.

___ UNSAT STANDARD: Candidate depresses the RESET pushbuttons for Channels 5 and 6 located on 1UB1 COMMENTS:

CRO-508 R0 - e Page 6 of 11 STEP 4: Step 44 Verify:

___ SAT

  • CH 5 TRIPPED light off
  • CH 6 TRIPPED light off

___ UNSAT STANDARD: Candidate locates ES Channels 5 and 6 and verifies that their respective lights are no longer lit/illuminated.

COMMENTS:

STEP 5: Step 45 Open:

___ SAT

___ UNSAT STANDARD: Candidate verifies 1CC-7 and 1CC-8 are OPEN by observing RED lights ON and GREEN lights OFF.

COMMENTS:

STEP 6: Step 46

___ SAT Ensure one CC pump is running in the ON position.

STANDARD: Candidate verifies only one CC pump is running.

___ UNSAT COMMENTS:

CRO-508 R0 - e Page 7 of 11 STEP 7: Step 47 Ensure one CC pump off and in AUTO.

___ SAT STANDARD: Candidate ensures the standby CC pump control switch is in the AUTO position.

___ UNSAT COMMENTS:

STEP 8: Step 48 CRTICAL STEP Position the following switches to LOW:

___ SAT

  • 1A RBCU
  • 1B RBCU
  • 1C RBCU

___ UNSAT STANDARD: Candidate places the speed control switches for RBCUs 1A, 1B, & 1C to the LOW position.

COMMENTS:

STEP 9: Step 49 CRTICAL STEP Depress the following PUSH TO RET TO NORMAL AFT ES RESET

___ SAT pushbuttons:

  • 1A RBCU ES RESET
  • 1B RBCU ES RESET
  • 1C RBCU ES RESET ___ UNSAT STANDARD: Candidate depresses the following PUSH TO RET TO NORMAL AFT ES RESET pushbuttons for RBCUs 1A, 1B, & 1C COMMENTS:

CRO-508 R0 - e Page 8 of 11 NOTE The Turnover Checklist may be used to determine condition of the RBCUs before ES actuation. ___ SAT STEP 10: Step 50 Initiate OP/1/A/1104/015 (Reactor Building Cooling System) to place the following in normal alignment: ___ UNSAT RBCUs 1LPSW-18 1LPSW-21 1LPSW-24 STANDARD: Candidate continues to Step 11 based on examiners cue.

Examiners Cue: Inform candidate that another operator will initiate and perform required actions of OP/1/A/1104/015 COMMENTS:

STEP 11: Step 51 Initiate OP/1/A/1104/010 (Low Pressure Service Water) to restore RB Auxiliary Fan Coolers to service using "Startup of RB Aux Coolers" ___ SAT portion of Encl (LPSW Shutdown and Return to Service of RB Aux Coolers). {37}

STANDARD: Candidate continues to Step 12 based on examiners cue. ___ UNSAT Examiners Cue: Inform candidate that another operator will initiate and perform required actions of OP/1/A/1104/010 COMMENTS:

CRO-508 R0 - e Page 9 of 11 STEP 12: Step 52 Secure the Penetration Room Ventilation fans:

___ SAT

  • 1A PEN ROOM FAN
  • 1B PEN ROOM FAN

___ UNSAT STANDARD: Candidate places the controls switches for the 1A and 1B PEN ROOM FANs to the OFF position and verifies GREEN light ON and RED light OFF for both.

Examiners Cue: Another operator will continue with this procedure.

COMMENTS:

END TASK STOP TIME: ____________

CRO-508 R0 - e Page 10 of 11 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 This step is required to reset the ES channels 5 & 6 so the associated components can be re-aligned for normal operation.

8 This step is required to return the RBCUs to a normal alignment.

9 This step is required to return the RBCUs to a normal alignment.

b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A MSLB has occurred.

ES Channels 1 - 6 have actuated on High RB pressure.

EOP Encl. 5.1 (ES Actuation) is complete ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40 INITIATING CUES:

The CRS directs you to continue in EOP Encl. 5.41 (ES Recovery) beginning at step 41.

CRO-606 R0 - f Page 1 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-606 Energize Main Feeder Busses From CT-5 CANDIDATE EXAMINER

CRO-606 R0 - f Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Energize Main Feeder Busses From CT-5 Alternate Path:

Yes Facility JPM #:

CRO-008 K/A Rating(s):

System: 055 K/A: EA2.03 Rating: 3.9/4.7 Task Standard:

Energize Main Feeder Busses from CT-5.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X___ In-Plant ______ Perform __X__ Simulate _____

References:

EOP, Encl 5.38 (Restoration of Power)

Validation Time: 15 minutes Time Critical: No

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-606 R0 - f Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 218
2. IMPORT Files for CRO-606
3. Place simulator in RUN

CRO-606 R0 - f Page 4 of 15 Tools/Equipment/Procedures Needed:

EOP, Encl 5.38 (Restoration of Power)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 experienced a unit trip followed by a lockout on CT-1.

Blackout tab of the EOP in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).

INITIATING CUES:

The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses.

CRO-606 R0 - f Page 5 of 15 START TIME: _______

STEP 1: Step 1 Verify power has been restored.

___ SAT STANDARD: Determine power has NOT been restored by observing MFB voltage on 1AB1. Perform RNO step.

Continue to Step 2

___ UNSAT COMMENTS:

STEP 2: Step 1 RNO GO TO Step 3.

___ SAT STANDARD: GO TO Step 3.

COMMENTS:

___ UNSAT STEP 3: Step 3 CRITICAL STEP Place 1HP-31 in HAND and reduce demand to 0.

___ SAT STANDARD: Place 1HP-31 in HAND and reduce demand to 0 using the toggle switch.

Located on 1UB1.

Continue to Step 4

___ UNSAT COMMENTS:

STEP 4: Step 4 Close 1HP-21.

___ SAT STANDARD: Close 1HP-21 by rotating the switch to the closed position on 1UB2.

Continue to Step 5 COMMENTS: ___ UNSAT

CRO-606 R0 - f Page 6 of 15 STEP 5: Step 5 Verify any of the following energized:

  • MFB2 STANDARD: Observes that zero (0) volts are indicated on both MFBs meters located on 1AB1. ___ UNSAT Continue to Step 5 RNO COMMENTS:

STEP 6: Step 5 RNO GO TO Step 8.

___ SAT STANDARD: GO TO Step 8.

COMMENTS: ___ UNSAT STEP 7: Step 8 Verify CT-1 indicates 4160 volts.

___ SAT STANDARD: Observes that zero (0) volts is indicated on CT-1 on 1AB1.

Continue to Step 8 RNO COMMENTS: ___ UNSAT STEP 8: Step 8 RNO GO TO Step 18.

___ SAT STANDARD: GO TO Step 18.

COMMENTS: ___ UNSAT STEP 9: Step 18 Verify both Standby Bus #1 and Standby Bus #2 are de-energized.

___ SAT STANDARD: Observes that zero (0) volts is indicated both Standby Buses located on 2AB3.

Continue to Step 19

___ UNSAT COMMENTS:

CRO-606 R0 - f Page 7 of 15 STEP 10: Step 19 Verify all Keowee units operating.

___ SAT STANDARD: Determine that Keowee Unit 2 is Emergency Lockout by observing the Statalarm 2SA-18/A1.

Continue to Step 19 RNO

___ UNSAT COMMENTS:

STEP 11: Step 19 RNO

1. Emergency start Keowee units:

___ SAT

  • KEOWEE EMER START CHANNEL A
  • KEOWEE EMER START CHANNEL B
2. IF NO Keowee units are operating, ___ UNSAT THEN GO TO Step 38.

STANDARD: Place the KEOWEE EMER START CHANNEL A and B switches to start located on 1UB1.

COMMENTS:

STEP 12: Step 20 Verify both Keowee units in Oconee Control (statalarms on):

___ SAT

  • UNIT 1 OCONEE CONTROL (2SA-17/E-1)
  • UNIT 2 OCONEE CONTROL (2SA-18/E-1)

___ UNSAT STANDARD: Determine neither Statalarm above is actuated.

Continue to Step 20 RNO COMMENTS:

STEP 13: Step 20 RNO Notify Keowee Operator to place both Keowee units Master Transfer

___ SAT switches to remote.

STANDARD: Call the Keowee Operator and ask that both Keowee units Master Transfer switches be place to remote.

___ UNSAT Continue to Step 21 COMMENTS:

CRO-606 R0 - f Page 8 of 15 STEP 14: Step 21 Verify both Keowee units operating.

___ SAT STANDARD: Determine that only KHU 1 is operating.

Continue to Step 21 RNO

___ UNSAT COMMENTS:

STEP 15: Step 21 RNO

1. IF UNIT 1 EMER FDR ACB 3 is closed, AND Unit 1 Keowee is NOT

___ SAT operating, THEN open UNIT 1 EMER FDR ACB 3.

2. IF UNIT 2 EMER FDR ACB 4 is closed, AND Unit 2 Keowee is NOT operating, THEN open UNIT 2 EMER FDR ACB 4.

___ UNSAT STANDARD: Determine that BOTH ACB-3 and ACB-4 are OPEN, Continue to Step 22 COMMENTS:

ALTERNATE PATH STEP 16: Step 22 ___ SAT Ensure one of the following is closed for an operating Keowee unit:

Unit 1 Unit 2 ___ UNSAT UNIT 1 UNIT 1 EMER FDR EMER FDR ACB-3 ACB-3 STANDARD: Attempt to close ACB-3 and determine it did NOT close.

Continues to step 23 COMMENTS:

STEP 17: Step 23 Verify 4160 volt power has been restored to the MFB.

___ SAT STANDARD: Determine 4160 volt power has NOT been restored to the MFB by observing the U-1 FDR BUS VOLTS meters on 1AB1.

Continue to step 23 RNO

___ UNSAT COMMENTS:

CRO-606 R0 - f Page 9 of 15 STEP 18: Step 23 RNO GO TO Step 25

___ SAT STANDARD: GO TO Step 25 COMMENTS: ___ UNSAT STEP 19: Step 25 Verify CT-4 indicates 4160 volts.

___ SAT STANDARD: Determine CT-4 indicates zero volts on meter located on 1AB3.

Continue to Step 25 RNO

___ UNSAT COMMENTS:

STEP 20: Step 25 RNO GO TO Step 38.

___ SAT STANDARD: GO TO Step 38.

___ UNSAT COMMENTS:

STEP 21: Step 38 IAAT CT-5 indicates 4160 volts,

___ SAT THEN GO TO Step 55.

STANDARD: Determine that approximately 4160 volts is indicated on the CT-5 voltage meter located on 1AB1 and then GO TO Step 55 ___ UNSAT COMMENTS:

CRO-606 R0 - f Page 10 of 15 STEP 22: Step 55 CRITICAL STEP Place the following switches in MAN:

___ SAT

  • MFB 1 AUTO/MAN
  • MFB 2 AUTO/MAN
  • STANDBY 1 AUTO/MAN ___ UNSAT
  • STANDBY 2 AUTO/MAN STANDARD: Rotates the AUTO/MAN selector switch to the MANUAL position for each of the switches listed above.

Continue to Step 56 COMMENTS:

STEP 23: Step 56 Open the following breakers:

___ SAT

  • N1 1 MFB1 NORMAL FDR
  • N2 1 MFB2 NORMAL FDR
  • E1 1 MFB1 STARTUP FDR ___ UNSAT
  • E2 1 MFB2 STARTUP FDR STANDARD: Verify each of the above breakers is OPEN by observing the white breaker open light is LIT on 1AB1.

Continue to Step 57 COMMENTS:

STEP 24: Step 57 *CRITICAL STEP Place the following switches in MAN:

___ SAT

  • *CT4 BUS 1 AUTO/MAN
  • *CT4 BUS 2 AUTO/MAN
  • CT5 BUS 1 AUTO/MAN ___ UNSAT
  • CT5 BUS 2 AUTO/MAN STANDARD: Rotates the AUTO/MAN selector switch to the MANUAL position for each of the switches listed above located on 2AB3.

Continue to Step 58 COMMENTS:

CRO-606 R0 - f Page 11 of 15 STEP 25: Step 58 Open the following breakers:

___ SAT

  • SK1 CT4 STBY BUS 1 FEEDER
  • SK2 CT4 STDY BUS 2 FEEDER

___ UNSAT STANDARD: Verify each of the above breakers is OPEN by observing the white breaker open light is LIT on 2AB3.

Continue to Step 59 COMMENTS:

STEP 26: Step 59 CRITICAL STEP Close the following breakers:

___ SAT

  • SL1 CT5 STBY BUS 1 FEEDER
  • SL2 CT5 STBY BUS 2 FEEDER

___ UNSAT STANDARD: Go to the CLOSED position for each of the switches listed above located on 1AB3..

Continue to Step 60 COMMENTS:

STEP 27: Step 60 CRITICAL STEP Place the following switches in AUTO:

___ SAT

  • CT5 BUS 1 AUTO/MAN
  • CT5 BUS 2 AUTO/MAN

___ UNSAT STANDARD: Rotates the AUTO/MAN selector switch to the AUTO position for each of the switches listed above.

Continue to Step 61 COMMENTS:

CRO-606 R0 - f Page 12 of 15 STEP 28: Step 61 Verify Standby Bus #1 energized.

___ SAT STANDARD: Observes that 4160 volts are indicated for Standby Bus #1 located on 2AB3.

Continue to Step 62 ___ UNSAT COMMENTS:

STEP 29: Step 62 Notify CR SRO in each unit where a blackout exists that Standby Bus #1 is energized. ___ SAT STANDARD: Notifies CR SRO that Standby Bus #1 is energized located on 2AB3.

Continue to Step 63

___ UNSAT Cue: If asked, inform candidate that only Unit 1 is affected.

COMMENTS:

STEP 30: Step 63 CRITICAL STEP Close the following breakers:

___ SAT

  • S1 1 STBY BUS 1 TO MFB1
  • S2 1 STBY BUS 2 TO MFB2

___ UNSAT STANDARD: Goes to the CLOSED position for each of the switches listed above.

Continue to Step 64 Note: Only 1 of the Stby Busses must be energized to restore power to MFBs.

COMMENTS:

STEP 31: Step 64 Verify any of the following energized:

___ SAT

  • 1TC
  • 1TD
  • 1TE ___ UNSAT STANDARD: Observes that 4160 volts indicated on either MFB voltmeters or OAC.

Continue to Step 65 COMMENTS:

CRO-606 R0 - f Page 13 of 15 STEP 32: Step 65 Notify Unit 1 CR SRO of status of 4160V SWGR.

___ SAT STANDARD: Notifies CR SRO of status of 4160V SWGR

___ UNSAT COMMENTS:

END TASK STOP TIME: ____________

CRO-606 R0 - f Page 14 of 15 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Step is required to protect the RCP seals.

22 Step is required to satisfy power switching logic.

24 Step is required to satisfy power switching logic.

26 Step is required to energize the Main Feeder Bus.

27 Step is required to provide undervoltage protection.

30 Step is required to energize the Main Feeder Bus.

f CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 experienced a unit trip followed by a lockout on CT-1.

Blackout tab of the EOP in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).

INITIATING CUES:

The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses.

CRO-607 R0 - i Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-607 Activate the SSF From the SSF Control Room CANDIDATE EXAMINER

CRO-607 R0 - i Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Activate The SSF From the SSF Control Room Alternate Path:

No Facility JPM #:

CRO-047 K/A Rating(s):

System: 062 K/A: A2.11 Rating: 3.7/4.1 Task Standard:

Power is swapped and the SSF D/G is emergency started. Flow is established to the RCP seals using the SSF-RCMU system. Flow is established to the SGs using the SSF ASW system.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _____ In-Plant __X ___ Perform _____ Simulate __X__

References:

AP/0/A/1700/25 Validation Time: 12 minutes Time Critical: YES

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-607 R0 - i Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:

1. None

CRO-607 R0 - i Page 4 of 14 Tools/Equipment/Procedures Needed:

AP/0/A/1700/025 (SSF EOP)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 3 was operating at 100% power Unit 3 TD EFDWP is out of service Tornado warnings are in affect AP/0/A/1700/006 (Natural Disaster) in progress You are pre-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster).

Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES:

The CRS calls and informs you of the following:

  • Unit 3 has lost all AC power
  • SSF RCMU feed and SSF ASW feed to the SGs are required
  • The breaker transfers have NOT been performed
  • Begin AP/25 actions starting at Step 4.5 THIS JPM IS TIME CRITICAL

CRO-607 R0 - i Page 5 of 14 START TIME: _______

TIME CRITICAL TIME STARTS ________ CRITICAL STEP

___ SAT STEP 1: Step 4.5 Perform the following on the affected unit:

  • Open 3XSF-F5A (3XSF NORM FDR BKR FROM 3X8) and remove Kirk Key ___ UNSAT
  • Using Kirk Key, close 1, 2, 3XSF-F3A (1, 2, 3XSF EMERG FDR BKR FROM OXSF)

STANDARD: Student: Locates and opens NORMAL FDR BKR FROM 1, 2, 3X8 is by rotating breaker switch to the OFF position and removes the Kirk Key.

Student locates EMERG FDR BKR FROM OXSF inserts the Kirk Key and closed the breaker by rotating breaker switch to the ON position.

Continues to Step 4.6 Cue: As operator performs the key/breaker operation, indicate to operator the appropriate component positions.

NOTE: Kirk Key must be rotated 1/2 turn to be removed.

COMMENTS:

STEP 2: Step 4.6 Verify SSF D/G is operating

___ SAT STANDARD: Determines the D/G is not operating and continues to step 4.6 RNO (GOTO to Step 4.8)

___ UNSAT Continues to step 4.8 COMMENTS:

CRO-607 R0 - i Page 6 of 14 STEP 3: Step 4.8 CRITICAL STEP Depress DIESEL EMERGENCY START push button.

___ SAT STANDARD The SSF Control Room DIESEL EMERGENCY START pushbutton is pressed.

___ UNSAT Continues to Step 4.9 Cue: Allow 12 sec for the D/G to reach rated speed.

COMMENTS:

STEP 4: Step 4.9 Verify SSF D/G operating.

___ SAT STANDARD: Candidate reports by indications and sound that D/G is operating.

Continues to Step 4.10

___ UNSAT COMMENTS:

STEP 5: Step 4.10 Open breaker OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T). ___ SAT STANDARD: The green TRIP pushbutton on the SSF OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T) control switch is pressed. ___ UNSAT Continues to Step 4.11 Cue: Inform student that the green light for OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T) is on and the red light is off.

COMMENTS:

CRO-607 R0 - i Page 7 of 14 STEP 6: Step 4.11 Verify open OTS1-0 (SSF ALT. POWER SUPPLY BKR OTS1-0).

___ SAT STANDARD: Determine that OTS1-0 (SSF ALT. POWER SUPPLY BKR OTS1-0) is open by verify that the green open light is lit and the red closed light is off. ___ UNSAT Continues to Step 4.12 COMMENTS:

STEP 7: Step 4.12 WHEN 3 seconds have elapsed THEN continue.

___ SAT STANDARD: W ait three (3) seconds after OTS1-1 is opened and continue.

Continues to Step 4.13

___ UNSAT COMMENTS:

STEP 8: Step 4.13 CRITICAL STEP Close breaker OTS1-4 (DIESEL GEN BREAKER).

___ SAT STANDARD: The red CLOSE pushbutton on the SSF Control Room OTS1-4 (DIESEL GEN BREAKER) switch is depressed. ___ UNSAT Continues to Step 4.14 Cue: After student closes in diesel generator breaker, inform him/her that red light is on and green light is off.

COMMENTS:

CRO-607 R0 - i Page 8 of 14 STEP 9: Step 4.14 Verify Diesel Engine Service Water Pump operating.

___ SAT STANDARD: Determine that the Diesel Engine Service Water Pump operating by observing the red ON light lit.

Continues to Step 4.15 ___ UNSAT Cue: Indicate that the Diesel Engine Service Water Pump red light is on.

COMMENTS:

STEP 10: Step 4.15 CRITICAL STEP Start the SSF ASW Pump.

___ SAT STANDARD: SSF ASW PUMP red ON pushbutton is depressed.

Continues to Step 4.16

___ UNSAT Cue: After ASW pump ON pushbutton is pressed, inform student of the following:

  • ASW pump red light is on and green light is off.
  • SSF Control Room AUX SER WTR PUMP AMPS meter indicates on scale.

COMMENTS:

STEP 11: Step 4.16 Verify any of the following required:

___ SAT

  • SSF RCMU feed
  • SSF ASW feed to SGs

___ UNSAT STANDARD: Determine that SSF RCMU and SSF ASW are still required.

Continues to Step 4.17 COMMENTS:

CRO-607 R0 - i Page 9 of 14 STEP 12: Step 4.17 PERFORM the following on all affected units:

___ SAT

  • Encl 5.1A (Emergency Operation of SSF Systems Unit 1) (PS)
  • Encl 5.1B (Emergency Operation of SSF Systems Unit 2) (PS)
  • Encl 5.1C (Emergency Operation of SSF Systems Unit 3) (PS) ___ UNSAT STANDARD: Obtains Control room copy of Encl 5.1C (Emergency Operation of SSF Systems Unit 3).

Continues to Step 1 of Encl 5.1C.

COMMENTS:

STEP 13: Step 1 Verify SSF RCMU is required for Unit 3.

___ SAT STANDARD: Determine that SSF RCMU is required for Unit 3.

Continues to step 3. ___ UNSAT COMMENTS:

STEP 14: Step 2. CRITICAL STEP Position OVERRIDE RC MAKEUP PUMP switch to START.

___ SAT STANDARD: OVERRIDE RC MAKEUP PUMP switch is rotated to the START position.

Continues to step 3.

___ UNSAT NOTE: Allow 9 seconds for the following valves to stroke from the time the OVERRIDE switch is operated, and then as soon as the 9 second stroke time is complete the time-critical time #1 is complete.

CRITICAL TIME #1 _________

COMMENTS:

CRO-607 R0 - i Page 10 of 14 STEP 15: Step 3 CRITICAL STEP Select CLOSE for the following valves:

___ SAT

___ UNSAT STANDARD: Student: Presses the green CLOSE button for the following:

  • 3HP-4 Continues to step 6.

Cue: Initial indication for valve position is red light is on and green light is off for all valves. During valve travel, both the red and green lights are on.

COMMENTS:

STEP 16: Step 4 Verify SSF ASW is required to feed Unit 3 SGs.

___ SAT STANDARD: Determine that SSF ASW is required to feed Unit 3 SGs.

Continues to step 5.

___ UNSAT COMMENTS:

CRO-607 R0 - i Page 11 of 14 STEP 17: Step 5 CRITICAL STEP Open the following valves:

___ SAT

___ UNSAT STANDARD: Red OPEN button is pressed for 3CCW-287.

Red OPEN button is pressed and held (throttle valve) for 3CCW-269 Continues to Step 6 Cue: After allowing 25 seconds for valve stroke time, inform the student the Red light is ON and the Green light is OFF.

Cue: After allowing 12 seconds for valve stroke time inform student the Green light is OFF and the Red light is ON.

COMMENTS:

NOTE CRITICAL STEP

  • For high decay heat cores, aggressive feeding up to a maximum of 425 gpm may be required. ___ SAT
  • For very low decay heat cores, no feeding may be required.
  • SSF ASW flow gauge has a 60 gpm low flow cut off.

___ UNSAT STEP 18: Step 6 IAAT RCS pressure is NOT within 1950 - 2250 psig, THEN throttle 3CCW-268, as necessary, to maintain RCS pressure 1950

- 2250 psig.

STANDARD: ASW Pump to SG Supply, 3CCW-268, is THROTTLED OPEN and RCS pressure is monitored.

Continues to Step 7 Cue: Indicate that RCS pressure is 2375 psig Cue: After allowing 14 sec for valve stroke time, indicate to operator that ASW flow is 400 gpm and RCS pressure is 2235 slowly decreasing.

CRITICAL TIME #2 __________

COMMENTS:

CRO-607 R0 - i Page 12 of 14 STEP 19: Step 7 WHEN RCS pressure 2350 psig,

___ SAT THEN select CLOSE on 3RC-4.

STANDARD: Determine that RCS pressure is < 2350 and select CLOSE on 3RC-4.

___ UNSAT Cue: Indicate that RCS pressure is 2330 psig Cue: When 3RC-4 has been closed, inform the candidate that another operator will complete this procedure.

COMMENTS:

END TASK STOP TIME: ____________

CRO-607 R0 - i Page 13 of 14 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 1 Must be performed to power the SSF from the Diesel/Generator.

3 Must be performed to start the diesel and get power for the SSF.

8 Necessary to power the SSF loads.

10 Starts the SSF ASWP 14 Starts the SSF RCMU pump (TCA 20 minutes) 15 Necessary to achieve RCS pressure control.

17 Necessary to lineup the SSF ASW to supply the SGs.

18 Necessary to lineup the SSF ASW to supply the SGs. (TCA 14 minutes)

i CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 3 was operating at 100% power Unit 3 TD EFDWP is out of service Tornado warnings are in affect AP/0/A/1700/006 (Natural Disaster) in progress You are pre-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster).

Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES:

The CRS calls and informs you of the following:

  • Unit 3 has lost all AC power
  • SSF RCMU feed and SSF ASW feed to the SGs are required
  • The breaker transfers have NOT been performed
  • Begin AP/25 actions starting at Step 4.5 THIS JPM IS TIME CRITICAL

CRO-803 R0 - g Page 1 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-803 Perform Required Actions For A Turbine Building Flood CANDIDATE EXAMINER

CRO-803 R0 - g Page 2 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Perform Required Actions For A Turbine Building Flood Alternate Path:

Yes Facility JPM #:

CRO-060 K/A Rating(s):

System: APE BW/A07 K/A: AA1.3 Rating: 3.3/3.5 Task Standard:

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____

References:

AP/10, Uncontrollable Flooding of Turbine Building Validation Time: 15 minutes Time Critical: NO

=========================================================================

Candidate: ______________________________________ Time Start: _____________

NAME Time Finish: ____________

Performance Rating: SAT ______ UNSAT ______ Performance Time _______

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

=========================================================================

COMMENTS

CRO-803 R0 - g Page 3 of 13 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 219
2. IMPORT files for CRO-803
3. Go to RUN

CRO-803 R0 - g Page 4 of 13 Tools/Equipment/Procedures Needed:

AP/10, Uncontrollable Flooding of Turbine Building READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 was operating at 100% power Unit 2 is in cold shutdown.

The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising.

Unit 1 has been tripped and the EOP is being completed by other team members.

INITIATING CUES:

The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions.

CRO-803 R0 - g Page 5 of 13 START TIME: _______

STEP 1: Step 4.1 Trip the Rx.

___ SAT STANDARD: Depress the Rx trip pushbutton on 1UB1. Verify the RX is tripped by observing all control rods are inserted.

___ UNSAT Continue to Step 4.2.

COMMENTS:

NOTE CRITICAL STEP Tripping the CCW pumps will cause loss of condenser vacuum which will result in TBVs failing closed and trip of the MFDWPs. ___ SAT STEP 2: Step 4.2 Ensure all CCW pumps are shutdown. ___ UNSAT STANDARD: The 1A, 1B, and 1C CCW pump switches are rotated to the TRIP position and verify the red close lights extinguish and the white open lights illuminate. (located on 1AB3)

Continue to Step 4.3.

COMMENTS:

CRO-803 R0 - g Page 6 of 13 STEP 3: Step 4.3 CRITICAL STEP Press both of the following on the TURB BLDG FLOOD EMER CLOSING ALL CCWP DISCH VALVES control switch: ___ SAT

  • CLOSE 1
  • CLOSE 2

___ UNSAT STANDARD: "CLOSE 1" and "CLOSE 2" on the TURB BLDG FLOOD EMER CLOSING ALL CCWP DISCH VALVES control switch are both depressed. (located on 1AB3)

Continue to Step 4.4.

COMMENTS:

STEP 4: Step 4.4 Verify all CCW pump discharge valves are closed.

___ SAT STANDARD: The green CLOSED lights for 1CCW-10, 11, and 13 are verified illuminated and the red OPEN lights for the same valves are verified extinguished. (located on 1AB3) ___ UNSAT Determine that 1CCW-12 is NOT closed by observing the red open light is lit on 1AB3.

Continue to Step 4.4 RNO.

COMMENTS:

CRO-803 R0 - g Page 7 of 13 ALTERNATE PATH NOTE The control switches for the CCW pump discharge valves do not seal-in. The valves act ___ SAT as throttle valves unless the associated CCW pump switch is in the TRIP position.

STEP 5: Step 4.4 RNO

___ UNSAT Dispatch an operator to ensure all CCW pump discharge valves are closed (Equipment Rm):

STANDARD: An operator is dispatched to the Equipment Room to ensure 1CCW-12 is closed.

Continue to Step 4.5.

Booth cue: After 2 minutes call as the NEO and inform candidate that 1CCW-12 will NOT close.

COMMENTS:

NOTE Field tasks that may affect multiple units should be coordinated with Unit 2 and Unit 3.

___ SAT STEP 6: Step 4.5 Dispatch operators to ensure all three flood doors are closed and in the SECURED position from the AB side (A-1, at Unit 1, 2, and 3 stairwell ___ UNSAT entrances to TB): {2}

  • Unit 1 Flood Door
  • Unit 2 Flood Door
  • Unit 3 Flood Door STANDARD: Dispatch an NEO to ensure all three flood doors are closed and in the SECURED position from the AB side.

Continue to Step 4.6.

Booth cue: When called, inform candidate that an operator has been dispatched.

COMMENTS:

CRO-803 R0 - g Page 8 of 13 STEP 7: Step 4.6 Verify LPI decay heat removal is in progress.

___ SAT STANDARD: Determine LPI pumps are NOT operating by observing pumps switch indications on 1UB2.

___ UNSAT Continue to Step 4.6 RNO GO TO Step 4.8.

COMMENTS:

STEP 8: Step 4.8 Dispatch an operator to position the waterbox discharge valve switches (T-3, East of condenser catwalk): ___ SAT

  • 1CCW-20 (1A1) switch to CLOSE ___ UNSAT
  • 1CCW-25 (1C2) switch to CLOSE STANDARD: Candidate should dispatch an operator to place the above valves to HAND and CLOSE.

Continue to Step 4.9.

Booth Cue: When called, inform candidate that an operator has been dispatched.

COMMENTS:

CRO-803 R0 - g Page 9 of 13 STEP 9: Step 4.9 Make a PA announcement of the event including restrictions on entry into TB basement due to electrical hazard. ___ SAT STANDARD: PA announcement is made using the Control Room phone.

___ UNSAT Continue to Step 4.10.

COMMENTS:

STEP 10: Step 4.10 Begin attempts to locate and isolate the source of the flooding.

___ SAT STANDARD: Dispatch operators to locate and isolate the source of the flooding.

Continue to Step 4.11. ___ UNSAT Booth Cue: When called, inform candidate that an operator has been dispatched.

COMMENTS:

STEP 11: Step 4.11 Ensure all Unit 1 ESV pumps are shutdown:

___ SAT

  • 1A ESV Pump
  • 1C ESV Pump
  • 1B ESV Pump ___ UNSAT STANDARD: Stop ALL Unit 1 ESV pumps by rotating their pumps switches to stop and verify that the red on light extinguishes and the white open light illuminates. (located on 1AB3)

Continue to Step 4.12.

COMMENTS:

CRO-803 R0 - g Page 10 of 13 ALTERNATE PATH STEP 12: Step 4.12 Verify all CCW pump discharge valves were successfully closed in ___ SAT earlier steps.

STANDARD: Verify that 1CCW-10, 11, and 13 are closed by observing that the green ___ UNSAT closed light is lit for each valve. (located on 1AB3)

Determine that 1CCW-12 is still open by observing red open indication light is lit on 1AB3 or observing open indication on the OAC.

Continue to Step 4.12 RNO.

COMMENTS:

CRITICAL STEP STEP 13: Step 4.12 RNO Dispatch an operator to perform the following (ESV Trench, Intake): ___ SAT

  • Remove pipe cap at 1CCW-26 (CCW Inlet High Point Vent). {4}

___ UNSAT

  • Remove pipe cap at 1CCW-28 (CCW Inlet High Point Vent). {4}

STANDARD: Candidate should dispatch an operator to position the above valves as directed.

Continue to Step 4.13 Booth Cue: When called, inform candidate that an operator has been dispatched.

COMMENTS:

CRO-803 R0 - g Page 11 of 13 STEP 14: Step 4.13 Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW Pumps).

___ SAT STANDARD: Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW Pumps).

___ UNSAT Continue to Step 4.14.

Booth Cue: When called, inform candidate that an operator has been dispatched.

COMMENTS:

STEP 15 Step 4.14 IAAT HPSW is NOT available, THEN ensure Encl 5.31 (Temporarily Charging the HPSW System) of Unit 1 EOP has been initiated. ___ SAT STANDARD: Determine that HPSW is available by observing the HPSW Jockey pump operating and level in the EWST. ___ UNSAT Continue to Step 4.15.

COMMENTS:

STEP 16: Step 4.15 Coordinate with WCC/TSC to perform the following:

  • Recover damaged equipment. ___ SAT
  • Remove water from accessible sumps.

___ UNSAT STANDARD: Candidate should call the WCC/TSC and discuss the following:

  • Recover damaged equipment.
  • Remove water from accessible sumps.

Cue: Inform candidate that another RO will complete this procedure. This task is complete COMMENTS:

END TASK STOP TIME: ____________

CRO-803 R0 - g Page 12 of 13 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 2 Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement.

3 Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement.

13 Necessary to ensure CCW inlet piping is vented to break siphon.

g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 was operating at 100% power Unit 2 is in cold shutdown.

The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising.

Unit 1 has been tripped and the EOP is being completed by other team members.

INITIATING CUES:

The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions.

CRO-903 R0 - h Page 1 of 16 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-903 Release GWD Tank CANDIDATE EXAMINER

CRO-903 R0 - h Page 2 of 16 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Release GWD Tank Alternate Path:

Yes Facility JPM #:

CRO-903 K/A Rating(s):

System: 071 K/A: A4.26 Rating: 3.1/3.9 Task Standard:

Release a GWD tank correctly using OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release).

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____

References:

OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release)

Validation Time: 30 minutes Time Critical: NO

=========================================================================

Candidate: _______________________________________ Time Start: ________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time ______

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

=========================================================================

COMMENTS

CRO-903 R0 - h Page 3 of 16 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL SNAP 201
2. Go to RUN

CRO-903 R0 - h Page 4 of 16 Tools/Equipment/Procedures Needed:

OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) & 4.10 (GWD Tank Sample Request)

PT/0/A/230/001 (Radiation Monitor Check)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Release of D GWD tank is desired No other GWRs in progress.

OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to step 3.9 INITIATING CUES:

CRS directs you to complete the release of the D GWD tank beginning at step 3.9 of Enclosure 4.9 (GWD Tank Release).

CRO-903 R0 - h Page 5 of 16 START TIME: _______

NOTE: If N2 was added to the most recently released GWD tank until 1RIA-37 indicated CRITICAL STEP

< 700 cpm, OR if the tanks' radioactivity was < 2.1E-05 Ci / ml when it was released, the GWD piping is considered "purged". ___ SAT STEP 1: Step 3.9 3.9 Adjust 1RIA-37 setpoints for release as follows: ___ UNSAT 3.9.1 Perform one of the following:

A. IF all of the following:

  • Calculated setpoints are < 1E+07 CPM
  • GWD piping purged {15}

set alarms as follows:

  • Set 1RIA-37 Alert setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1)
  • Set 1RIA-37 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1)

NOTE: If GWD piping NOT purged on most recent release, RP independently verifies release data and 1RIA-37 setpoint is set at zero to allow the tank to be released. {15}

B. IF any of the following:

  • Calculated setpoints are > 1E+07 CPM
  • GWD piping NOT purged {15}

over-ride 1RIA-37 setpoints as follows:

  • Set 1RIA-37 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
  • Set 1RIA-37 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).

STANDARD: Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA-37 and 1RIA-38 Setpoints) and using the RIA Screen insert the calculated 1RIA-37 setpoint of 2.73 E5 CPM Continue to Step 3.10 COMMENTS:

CRO-903 R0 - h Page 6 of 16 STEP 2: Step 3.10 CRITICAL STEP 3.10 Adjust 1RIA-38 setpoints for release as follows:

3.10.1 Perform one of the following: ___ SAT A. IF calculated setpoints are < 1E+06 CPM AND 1RIA-38 operable, set alarms as follows:

  • Set 1RIA-38 Alert setpoint at _______________cpm per ___ UNSAT PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8)
  • Set 1RIA-38 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8)

NOTE: Due to type of radiation 1RIA-38 monitors, it is NOT sensitive enough to perform an adequate N2 purge.

B. IF calculated setpoints are > 1E+06 CPM OR 1RIA-38 out of service, over-ride 1RIA-38 setpoints as follows:

  • Set 1RIA-38 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
  • Set 1RIA-38 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).

STANDARD: Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA-37 and 1RIA-38 Setpoints) and using the RIA Screen insert the calculated 1RIA-38 setpoint of 324 CPM.

Continue to Step 3.11 COMMENTS:

STEP 3: Step 3.11 Ensure GWR DISCHARGE FLOW CONTROL in "HAND".

___ SAT STANDARD: Ensure GWR DISCHARGE FLOW CONTROL in "HAND" located on 1AB3.

Continue to Step 3.12 ___ UNSAT COMMENTS:

CRO-903 R0 - h Page 7 of 16 STEP 4: Step 3.12 Verify GWR DISCHARGE FLOW CONTROL "CLOSED"

___ SAT STANDARD: Verify GWR DISCHARGE FLOW CONTROL CLOSED located on 1AB3.

Continue to Step 3.13

___ UNSAT COMMENTS:

STEP 5: Step 3.13 Remove "Purged / Not Purged" CR tag from GWR DISCHARGE FLOW CONTROL. ___ SAT STANDARD: Remove "Purged / Not Purged" CR tag from GWR DISCHARGE FLOW CONTROL located on 1AB3.

___ UNSAT Continue to Step 3.14 COMMENTS:

STEP 6: Step 3.14 Notify Unit 3 CR to perform the following:

  • Begin periodically monitoring all three Unit 3 GWD tanks to ___ SAT determine if pressure in any tank is decreasing unexpectedly. {12}
  • Place a note on turnover sheet "If 3RIA-45 alarms or GWD tank pressure in any tank is decreasing unexpectedly, notify Unit 1 CR to ___ UNSAT terminate GWD tank release".

STANDARD: Notify Unit 3 CR to begin periodically monitoring all three Unit 3 GWD tanks to determine if pressure in any tank is decreasing unexpectedly Notify Unit 3 CR to place above note on the turnover sheet Continue to Step 3.15 COMMENTS:

CRO-903 R0 - h Page 8 of 16 STEP 7: Step 3.15 Notify Unit 2 CR to place a note on turnover sheet "If 2RIA-45 alarms, notify Unit 1 CR to terminate GWD tank release". ___ SAT STANDARD: Notify Unit 2 CR to place above note on the turnover sheet.

Continue to Step 3.16 ___ UNSAT COMMENTS:

STEP 8: Step 3.16 Begin monitoring all four Unit 1 GWD tanks to determine if pressure in any tank is decreasing unexpectedly. ___ SAT STANDARD: Begin monitoring GWD tank pressures on chart recorder on 1VB2 or OAC.

___ UNSAT Continue to Step 3.17 COMMENTS:

STEP 9: Step 3.17 IF 1RIA-37 NOT in service AND the tank being released is 2.1E-05 Ci

/ ml, notify RP to prepare to survey GWD piping at 1RIA-37. {15} ___ SAT Person Notified Date STANDARD: Determine 1RIA-37 is in service and N/A step 3.17. ___ UNSAT Continue to Step 3.18 COMMENTS:

CRO-903 R0 - h Page 9 of 16 STEP 10: Step 3.18 IF AT ANY TIME any tank is decreasing unexpectedly, perform the following: ___ SAT 3.18.1 Close GWR DISCHARGE FLOW CONTROL.

3.18.2 Notify RP to initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned ___ UNSAT radioactive effluent release.

Person Notified Date 3.18.3 Go To Section 4 (GWR Termination).

STANDARD: Determine IAAT step is not met at this time.

Continue to Step 3.19 COMMENTS:

STEP 11: Step 3.19 IF AT ANY TIME desired to terminate release, perform the following:

3.19.1 Close GWR DISCHARGE FLOW CONTROL. ___ SAT 3.19.2 Go To Section 4 (GWR Termination).

STANDARD: Determine IAAT step is not met at this time. ___ UNSAT Continue to Step 3.20 COMMENTS:

CRO-903 R0 - h Page 10 of 16 STEP 12: Step 3.20 CRITICAL STEP Open GWD-100 (Decay Tanks Discharge Header Block). (A-2-209/E 13' N of Door) ___ SAT STANDARD: Dispatch NEO to Open GWD-100 (Decay Tanks Discharge Header Block). ___ UNSAT Continue to Step 3.21 Booth Note: GWD-100 is OPEN.

Cue: Inform candidate that GWD-100 is open.

COMMENTS:

STEP 13: Steps 3.21 - 3.23 IF releasing GWD Tank A, perform the following

___ SAT STANDARD: Determine NOT releasing GWD Tank A, B, and C and N/A steps 3.21, 3.22, and 3.23.

Continue to Step 3.24

___ UNSAT COMMENTS:

STEP 14: Step 3.24 CRITICAL STEP IF releasing GWD Tank D perform the following:

___ SAT

  • Open GWD-205 (Decay Tank 1D Discharge Block) (IRW Building)
  • Place GWD-207 (D INTERIM GWD TANK DISCH) switch to "OPEN"

___ UNSAT STANDARD: Dispatch NEO to open GWD-205 (Decay Tank 1D Discharge Block).

Cue: Inform candidate that GWD-205 is open.

Locate GWD-207 (D INTERIM GWD TANK DISCH) on 1AB3 and place switch to "OPEN" Continue to Step 3.25 COMMENTS:

CRO-903 R0 - h Page 11 of 16 NOTE: Station Limit release rates, per SLC 16.11, will NOT be exceeded if recommended release rates per Enclosure 4.10 (GWD Tank Sample Request) are followed.

___ SAT The following approval levels are required for releases: {10}{13}

All Station Releases in Progress (including this one) Required Level of Approval 1 GWR in progress through P/A/C filter at ___ UNSAT 1/3 Station Limit ( 30 day holdup) SRO 1 GWR in progress at 1/3 Station Limit

(< 30 day holdup OR released without P/A/C filter) OSM 1 GWR in progress at 2/3 Station Limit OSM 2 GWRs in progress at 1/3 Station Limit each OSM 3 GWRs in progress at 1/3 Station Limit each OSM STEP 15: Step 3.25 Circle Required Level of Approval above based on Release Conditions.

STANDARD: Circle SRO on enclosure.

Continue to Step 3.26 COMMENTS:

STEP 16: Step 3.26 Record approval granted for release:

___ SAT

________________________ _________ / _____

Approval Date Time STANDARD: Place approval name and date and time on enclosure. ___ UNSAT Continue to Step 3.27 Cue: Approval is granted for release by Tracy Lemons at current Date/Time.

COMMENTS:

CRO-903 R0 - h Page 12 of 16 STEP 17: Step 3.27 IF tank holdup < 30 days, perform the following STANDARD: Determine tank has been held up greater than 30 days and N/A steps ___ SAT 3.27.1 - 3.27.2.

Continue to Step 3.28

___ UNSAT COMMENTS:

STEP 18: Step 3.28 IF tank is released without processing through a P/A/C filter AND Projected 31 day average gaseous effluent organ dose > limit, perform ___ SAT the following STANDARD: Determine tank is being released through a P/A/C filter and N/A steps 3.28.1 - 3.28.4.

___ UNSAT Continue to Step 3.29 COMMENTS:

STEP 19: Step 3.29 Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request): ___ SAT

______________ cfm STANDARD: Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request): ___ UNSAT

__4.19 E4____ cfm Continue to Step 3.30 COMMENTS:

CRO-903 R0 - h Page 13 of 16 NOTE: With Unit 1 PRV system shutdown, RIA-32 sample point for '1 PRV System Filter Discharge' is sampling air in piping between Unit 1 PRV discharge and Unit Vent, NOT the general area {2} ___ SAT During or just after GWD Release RIA-32 counts may increase while selected to '1 PRV System Filter Discharge' causing 1SA-8/B-9 "Process Monitor Radiation High" to alarm.

___ UNSAT STEP 20: Step 3.30 Place the following note on Unit 1 Turnover sheet:

"Just after or during a GWD release, 1SA-8/B-9 may alarm from RIA-32 sample point selected to '1 PRV System Filter Discharge'. IF 1SA-8/B-9 is due to RIA '1 PRV System Filter Discharge', it can be considered an expected alarm".

STANDARD: Candidate should indicate that the above note will be placed on the turnover sheet.

Continue to Step 3.31 COMMENTS:

STEP 21: Step 3.31 CRITICAL STEP Adjust GWR DISCHARGE FLOW CONTROL to obtain desired release rate.

___ SAT STANDARD: Slowly adjust the manual loading knob to obtain the desired release rate.

Continue to Step 3.32

___ UNSAT Note: Actual release rate will be much less than the maximum flow rate allowed by the release permit. Flow is monitored on VB1 recorder 1MSCCR0001 COMMENTS:

STEP 22: Step 3.32 Record "Begin GWR # _________" in Unit Log.

___ SAT STANDARD: Candidate should indicate a Unit log entry would be made.

Note: The B GWD tank will decrease instead of the D. The candidate should note this while monitoring the tank pressures and then perform IAAT Step 3.18. ___ UNSAT COMMENTS:

CRO-903 R0 - h Page 14 of 16 STEP 23: Step 3.18 *CRITICAL STEP IF AT ANY TIME any tank is decreasing unexpectedly, perform the following: ___ SAT 3.18.1 Close GWR DISCHARGE FLOW CONTROL.

3.18.2 Notify RP to initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned ___ UNSAT radioactive effluent release.

Person Notified Date 3.18.3 Go To Section 4 (GWR Termination).

STANDARD: Determine IAAT step is met because the B GWD Tank pressure is decreasing.

  • Close GWR DISCHARGE FLOW CONTROL.

Notify RP initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences)

Go To Section 4 (GWR Termination).

Cue: Another operator will complete this procedure.

COMMENTS:

END TASK STOP TIME: ____________

CRO-903 R0 - h Page 15 of 16 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 1 Required to set RIA to prevent station release above limits.

2 Required to set RIA to prevent station release above limits.

12 Required to align release flow path.

14 Required to align release flow path.

21 Required to align release flow path.

23 Required to stop the release of the wrong tank.

h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Release of D GWD tank is desired No other GWRs in progress.

OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to step 3.9 INITIATING CUES:

CRS directs you to complete the release of the D GWD tank beginning at step 3.9 of Enclosure 4.9 (GWD Tank Release).

NLO-400 R0 Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-400 Station ASW Pump Alignment CANDIDATE EXAMINER

NLO-400 R0 Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Align and start the Station ASW Pump Alternate Path:

No Facility JPM #:

NLO-017 K/A Rating(s):

System: B/WE04 K/A: EA1.1 Rating: 4.4/4.2 Task Standard:

Perform EOP Encl. 5.10 Station ASW Pump Alignment for valve and breaker alignment required to provide Station ASW to the SGs.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __ __ In-Plant __ X ___ Perform __ ___ Simulate __X__

References:

EOP Encl. 5.10 Station ASW Pump Alignment OP/0/A/1107/011 Removal And Restoration Of Auxiliary Electrical Equipment Validation Time: 16 minutes Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

NLO-400 R0 Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS None

NLO-400 R0 Page 4 of 12 Tools/Equipment/Procedures Needed:

600 volt breaker rackout tool EP/1/A/1800/001 Enclosure 5.10 Station ASW Pump Alignment OP/0/A/1107/011 Removal And Restoration Of Auxiliary Electrical Equipment .5 Rack In 600 Volt Breaker READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 1 was operating at 100% power The SSF is OOS BOTH Standby Buses are energized from CT-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater HPI Forced Cooling is established The EOP HPI CD Tab in progress HPI forced cooling flow is determined to be inadequate INITIATING CUES The CRS directs you to perform EOP Enclosure 5.10 Station ASW Pump Alignment to align and then start the Station ASW Pump.

NLO-400 R0 Page 5 of 12 START TIME: _______

NOTE All equipment operated in the following steps is located in A-1-128, ASW Pump Rm.

___ SAT STEP 1: Step 1 Obtain racking equipment and pipe wrench from EOP equipment locker U2AB1 (A-1, hallway near U2 elevator lobby).

STANDARD: Student locates the equipment locker containing the required racking and ___ UNSAT protective equipment.

  • Safety glasses
  • Face shield
  • Hard hat
  • Rubber gloves with leather protectors
  • Flame-resistant clothing
  • Pipe wrench
  • Breaker racking tool Continue to Step 2 NOTE: This step may be simulated and discussed, at the discretion of the evaluator.

Cue: Inform the student that for this JPM, it is not necessary to break the security seal on the locker for demonstrating equipment to be utilized.

COMMENTS:

STEP 2: Step 2 CRITICAL STEP Open CCW-99 (Aux Service Water Pump Suction).

___ SAT STANDARD: Candidate locates CCW-99 and simulates rotating handwheel counterclockwise to the open position.

Continue to Step 3 ___ UNSAT Cue: After the student locates and simulates placing CCW-99 in the open position, inform student CCW-99 position indicator is pointing to the "open" position.

COMMENTS:

NLO-400 R0 Page 6 of 12 STEP 3: Step 3 CRITICAL STEP Open CCW-247 (Aux Service Water Pump Recirc).

___ SAT STANDARD: Candidate locates CCW-247 and simulates rotating chain operator in the counterclockwise direction by pulling chain operator until handwheel comes to a hard stop. ___ UNSAT Continue to Step 4 Cue: After student locates and simulates placing CCW-247 in the open position, inform student that CCW-247 is at a counterclockwise hard stop position.

COMMENTS:

STEP 4: Step 4 CRITICAL STEP Open CCW-308 (Aux Service Water Pump Vent).

___ SAT STANDARD: Candidate locates CCW-308 on top of the Station ASW pump, removes pipe cap with simulated wrench from EOP Locker, pulls the locking pin and simulates rotating the 90° valve until the lever is parallel to the vent piping to the open position. ___ UNSAT Continue to Step 5 Cue: After student simulates opening CCW-308, inform him/her that a solid stream of water is issuing from the valve.

COMMENTS:

STEP 5: Step 5 *CRITICAL STEP WHEN all air is vented from Station ASW Pump, THEN close CCW-308.

___ SAT STANDARD: Candidate recognizes from previous instructor cue that all air is vented from Station ASW pump and simulates rotating CCW-308 clockwise to the closed position.

Continue to Step 6 ___ UNSAT

  • Note: Replacing the pipe cap in not critical.

Cue: After student simulates closing CCW-308, inform him/her that water flow has stopped and CCW-308 is at a clockwise hard stop position.

COMMENTS:

NLO-400 R0 Page 7 of 12 STEP 6: Step 6 CRITICAL STEP Rack in ASWS-6B (STATION ASW PUMP BKR) ( ASW 4160/600V SWGR ASWS-6). ___ SAT STANDARD: Candidate simulates donning protective clothing/equipment and simulates racking in ASW pump breaker (ASWS-6B).

Continue to Step 7 ___ UNSAT Cue: After the student simulates racking in the breaker, inform student that the STATION AUX SERVICE WATER PUMP Switch green "Trip" indicating light is ON.

Cue: If the candidate asks, provide him/her with a copy of OP/0/A/1107/011 Enclosure 4.5 (not critical)

COMMENTS:

STEP 7: Step 7 Close ASW SWGR FDR (ASW Swgr Fdr From B1T- Unit 10) (ASW 4160/600V Swgr ASWS-5). ___ SAT STANDARD: Candidate verifies that ASW SWGR FDR From B1T- Unit 10 is closed.

Continue to Step 8

___ UNSAT NOTE: This breaker is normally closed.

Cue: After student locates breaker, inform student that the two red CLOSED lights are lit and that the white OPEN light is off.

COMMENTS:

STEP 8: Step 8 IAAT AP/6 (Natural Disaster) directs restoring the Station ASW pump to standby, THEN GO TO Step 14. ___ SAT STANDARD: Candidate determines from cue that this step does not apply and continues to Step 9.

___ UNSAT Cue: If the candidate asks, inform him/her that AP/06 is NOT in progress.

COMMENTS:

NLO-400 R0 Page 8 of 12 STEP 9: Step 9 CRITICAL STEP WHEN notified that Standby Bus #1 is energized, AND notified to start the Station ASW pump, THEN perform the following (ASW 4160/600V ___ SAT SWGR ASWS-5):

A. Close ASW TRANSFORMER FDR (ASW SWITCHGEAR TRANSFORMER FEEDER).

___ UNSAT B. Close STATION ASW PUMP SW (STATION ASW PUMP CONTROL SWITCH) (ASW 4160V SWGR ASWX-5).

STANDARD: Candidate should recognize from the Initial Conditions that Standby Bus #1 is energized and the CRS has directed him/her to start the Station ASW Pump.

Candidate locates and closes ASW Switchgear Transformer Feeder breaker on ASWS-5 by simulating rotating the handle to the closed position.

Cue: After candidate simulates closing the breaker, inform him/her that the red "closed" light is ON and the green "trip" light is OFF.

Candidate locates Station ASW Pump Switch on ASWS-5 and simulates rotating the handle to the CLOSED position.

Continue to Step 10 Cue: After candidate simulates closing the breaker, inform him/her that the Station ASW Pump Switch red CLOSED light is ON and the green TRIP light is OFF.

COMMENTS:

STEP 10: Step 10 Close CCW-309 (Aux Service Water Pump Disch Drain) (12 West of ASW pump). ___ SAT STANDARD: Candidate locates CCW-309 and simulates closing CCW-309 by rotating the valve handwheel in a clockwise direction to a hard stop.

Continue to Step 11 ___ UNSAT Cue: Inform candidate that CCW-309 handwheel is fully clockwise and at a hard stop position.

COMMENTS:

NLO-400 R0 Page 9 of 12 STEP 11: Step 11 CRITICAL STEP Perform the following:

A. Position CCW-101 (Aux Service Water Pump Discharge) only one

___ SAT turn open.

B. Open CCW-101 an additional one turn open at a rate of one quarter turn every 15 seconds.

C. WHEN 5 minutes have elapsed, THEN slowly open CCW-101 until ___ UNSAT full open STANDARD: Candidate locates CCW-101 and simulates opening the valve one turn by rotating the valve operator in the counterclockwise direction by pulling on the chain operator.

Candidate opens CCW-101 an additional on turn open at a rate of one quarter turn every 15 seconds.

When 5 minutes have elapsed, candidate slowly opens CCW-101 until full open.

Continue to Step 12 Cue: After the candidate has correctly explained how to perform steps A & B, inform him her that 5 minutes have elapsed (time compression).

Cue: Inform candidate that CCW-101 handwheel is at a hard stop after following the sequence correctly.

COMMENTS:

STEP 12: Step 12 Verify Turbine Building flood is in progress.

___ SAT STANDARD: Candidate determines from the Initial Conditions that a Turbine Building flood is NOT in progress.

___ UNSAT Continue to Step 12 RNO COMMENTS:

NLO-400 R0 Page 10 of 12 STEP 13: Step 12 RNO Notify CRO that Station ASW Pump is operating.

___ SAT STANDARD: Candidate contacts the Unit 1 Control Room by radio or phone and informs them that the Station ASW Pump is operating.

___ UNSAT COMMENTS:

END TASK STOP TIME: ____________

NLO-400 R0 Page 11 of 12 CRITICAL STEP EXPLANATIONS STEP # Explanation 2 Necessary to align flowpath 3 Necessary to align flowpath 4 Necessary to vent the pump 5 Necessary to stop venting the pump 6 Necessary to provide power to the pump.

9 Necessary to provide power to the pump.

11 Necessary to provide flowpath.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 was operating at 100% power The SSF is OOS BOTH Standby Buses are energized from CT-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater HPI Forced Cooling is established The EOP HPI CD Tab in progress HPI forced cooling flow is determined to be inadequate INITIATING CUES The CRS directs you to perform EOP Enclosure 5.10 Station ASW Pump Alignment to align and then start the Station ASW Pump.

NLO-700 R0 - j Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-700 Restoration of ICS Auto Power CANDIDATE EXAMINER

NLO-700 R0 - j Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Restoration of ICS AUTO Power Alternate Path:

Yes Facility JPM #:

NLO-700 K/A Rating(s):

System: BW/A02 K/A: AA1.3 Rating: 3.4/3.6 Task Standard:

ICS AUTO power is restored per AP/1/A/1700/023, Loss of ICS Power.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __ __ In-Plant __ X ___ Perform __ ___ Simulate __X _

References:

AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) Rev. 20 Validation Time: 16 minutes Time Critical: NO

=======================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

=======================================================================

COMMENTS

NLO-700 R0 - j Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:

NONE

NLO-700 R0 - j Page 4 of 9 Tools/Equipment/Procedures Needed:

AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 operating at 100% power 1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES:

The CRS directs you to use AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) to restore ICS AUTO power on Unit 1.

NLO-700 R0 - j Page 5 of 9 START TIME: _______

STEP 1: Step 1 Verify the following breakers closed (Unit 1 Cable Rm):

  • 1KRA breaker #1 (100A 1P, POWER PANELBOARD 1KI) ___ SAT
  • 1KI BREAKER #1 (30A 1P, AUTO POWER (ICS))

___ UNSAT STANDARD: Locate 1KRA panel board and breaker #1 and verify it is closed.

Cue: Indicate to the candidate that 1KRA breaker #1 is CLOSED.

Locate 1KI panel board and breaker #1 and verify it is closed.

Cue: Indicate to the candidate that 1KI breaker #1 is tripped OPEN.

Continue Step 1 RNO.

COMMENTS:

STEP 2: Step 1 RNO

1. Reset and close the affected breakers (Unit 1 Cable Rm):

___ SAT

_____1KI BREAKER #1 (30A 1P, AUTO POWER (ICS))

2. IF either of the above breakers fail to close

___ UNSAT

3. WHEN both of the above breakers are closed THEN continue.

STANDARD: 1. Resets and closes 1KI BREAKER #1 by taking the breaker to the open position and then closing it.

2. Step does not apply. Both breakers are closed.
3. Determine both breakers are closed and continue.

Continue to Step 2.

COMMENTS:

NLO-700 R0 - j Page 6 of 9 ALTERNATE PATH STEP 3: Step 2

___ SAT Contact Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off.

___ UNSAT STANDARD: Contacts Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off.

Cue: Inform candidate that 1SA-2/B-11 (ICS AUTO POWER FAILURE) remains actuated.

Continue to Step 2 RNO.

COMMENTS:

STEP 4: Step 2 RNO IF ICS AUTO power has NOT been restored, THEN bypass 1KI inverter as follows: (BYP SW 1KI cabinet, Unit 1 Equip Rm, Southwest of col Q72): ___ SAT STANDARD: Determine ICS AUTO power has NOT been restored by actuation of 1SA-2/B-11 (ICS AUTO POWER FAILURE) in previous step ___ UNSAT THEN bypasses 1KI inverter as follows: (BYP SW 1KI cabinet, Unit 1 Equip Rm, Southwest of col Q72): (steps 5, 6, & 7 below)

COMMENTS:

STEP 5: Step 2 RNO A CRITICAL TASK A. Position SW#1 OFF(left switch).

___ SAT STANDARD: Positions SW#1 OFF (left switch).

Cue: Indicate to the candidate that SW#1 is OFF. ___ UNSAT COMMENTS:

NLO-700 R0 - j Page 7 of 9 STEP 6: Step 2 RNO B CRITICAL TASK B. Position SW#3 OFF (right switch).

___ SAT STANDARD: Positions SW#3 OFF (right switch).

Cue: Indicate to the candidate that SW#3 is OFF. ___ UNSAT COMMENTS:

STEP 7: Step 2 RNO C CRITICAL TASK C. Position SW#2 ON (center switch).

___ SAT STANDARD: Positions SW#2 ON (center switch).

Cue: Indicate to the candidate that SW#2 is ON.

___ UNSAT Continue to Step 3.

COMMENTS:

STEP 8: Step 3 Notify Unit 1 CR that all applicable steps of this enclosure have been completed. ___ SAT STANDARD: Using a phone or radio, Notify Unit 1 CR that all applicable steps of this enclosure have been completed. ___ UNSAT Cue: Inform candidate that the Control Room has been notified.

COMMENTS:

END TASK STOP TIME: ____________

NLO-700 R0 - j Page 8 of 9 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 5 Step is required in proper sequence to align power to the 1KI bus.

6 Step is required in proper sequence to align power to the 1KI bus.

7 Step is required in proper sequence to align power to the 1KI bus.

j CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 operating at 100% power 1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES:

The CRS directs you to use AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) to restore ICS AUTO power on Unit 1.