RBG-47414, License Amendment Request - Cyber Security Plan Implementation Schedule

From kanterella
(Redirected from ML14064A349)
Jump to navigation Jump to search

License Amendment Request - Cyber Security Plan Implementation Schedule
ML14064A349
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/25/2014
From: Olson E
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14064A340 List:
References
RBF1-14-0027, RBG-47414
Download: ML14064A349 (9)


Text

Entergy Operations, Inc.

Entergy River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775 Tel 225-381-4374 Eric W. Olson Site Vice President RBF1-14-0027 RBG-47414 February 25, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

License Amendment Request - Cyber Security Plan Implementation Schedule River Bend Station - Unit 1 License No. NPF-47 Docket No. 50-458

REFERENCES:

1. NRC Internal Memorandum to Barry Westreich from Russell Felts, Review Criteriafor 10 CFR 73.54, Cyber Security Implementation Schedule Milestone 8 License Amendment Requests, dated October 24, 2013 (ADAMS Accession No. ML13295A467)
2. NRC letter to Entergy, Issuance of Amendment Re: Approval of Cyber Security Plan, dated July 11, 2011 (RBC-50945)
3. NRC Internal Memorandum to Directors of Regional Divisions of Reactor Safety from Barry Westreich, Enhanced Guidance For Licensee Near-Term CorrectiveActions to Address Cyber Security Inspection Findings and Licensee Eligibility for "Good-Faith"Attempt Discretion, dated July 1, 2013 (ADAMS Accession No. ML13178A203)

Dear Sir or Madam:

Pursuant to 10 CFR 50.4 and 10 CFR 50.90, Entergy Operations, Inc. (Entergy) hereby requests an amendment to the Renewed Facility Operating License for River Bend Station (RBS). In accordance with the guidelines provided by Reference 1, this request proposes a change to the RBS Cyber Security Plan Milestone 8 full implementation date as set forth in the Cyber Security Plan Implementation Schedule approved by Reference 2. Reference 3 provided additional NRC internal guidance.

This letter contains Security-Related Information- Attachments 1(pages 1 through 4) and Attachment 4 are withheld from public disclosure per 10 CFR 2.390

RBG-47414 Cyber Security Implementation Schedule License Amendment Request Page 2 of 3 contains the proposed revised operating license pages. Attachment 4 contains a change to the date of Implementation Milestone 8. Entergy requests that Attachments 1 (Sections 1, 2, and 3) and 4, which contain Security-Related Information (SRI), be withheld from public disclosure in accordance with 10 CFR 2.390.

The proposed changes have been evaluated in accordance with 10 CFR 50.91(a)(1) using criteria in 10 CFR 50.92(c), and it has been determined that the changes involve no significant hazards consideration. The bases for these determinations are included in .

Entergy requests this license amendment be effective as of its date of issuance. Although this request is neither exigent nor emergency, your review and approval is requested prior to December 15, 2014.

The revised commitment contained in this submittal is summarized in Attachment 5. Should you have any questions concerning this letter, or require additional information, please contact Mr. Joseph Clark at (225)381-4177.

I declare under penalty of perjury that the foregoing is true and correct. Executed on December 20, 2013.

Sincerely,

  • §~ 5~-

EWO/TAE/JAC/tjb Attachments: 1. Analysis of Proposed Operating License Change (contains SRI)

2. Proposed RBS Operating License Changes (mark-up)
3. Re~ised RBS Operating License Page
4. Revised Cyber Security Plan Implementation Schedule (contains SRI)
5. List of Regulatory Commitments This letter contains Security-Related Information - Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390

RBG-47414 Cyber Security Implementation Schedule License Amendment Request Page 3 of 3 cc: Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector PO Box 1050 St. Francisville, LA 70775 U. S. Nuclear Regulatory Commission Attn: Mr. Alan B. Wang, Project Manager MS 0-8 B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Jeffrey P. Meyers (w/o Attachments 1 and 4)

Louisiana Department of Environmental Quality Office of Environmental Compliance Attn. OEC - ERSD P. 0. Box 4312 Baton Rouge, LA 70821-4312 Central Records Clerk (w/o Attachments 1 and 4)

Public Utility Commission of Texas 1701 N. Congress Ave.

Austin, TX 78711-3326 This letter contains Security-Related Information - Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390

Attachment 2 RBG-47414 Proposed River Bend Station Operating License Change (mark-up)

D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to the provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan,"

submitted by letter dated May 16, 2006.

E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The licensee's CSP was approved by License Amendment No. 171 as supplemented by changes approved by License Amendment No. xxx.

F. Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, EOI shall report any violations of the requirements contained in Section 2, Items C.(1); C.(3) through (9); and C.(1 1) through (16) of this license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within 60 days in accordance with the procedures described in 10 CFR 50.73(b), (c) and (e).

G. The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

H. This license is effective as of the date of issuance and shall expire at midnight on August 29, 2025.

FOR THE NUCLEAR REGULATORY COMMISSION Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosures:

1. Attachments 1-5
2. Appendix A - Technical Specifications (NUREG-1 172)
3. Appendix B - Environmental Protection Plan
4. Appendix C - Antitrust Conditions Date of Issuance: November 20, 1985 Revised: December 16, 1993 Amendment No. 70 79 85 119 135 171, xxx Revised by Ietter dated lctobor.28,2004 Rovisod by lottor dated hlovomboer 10, 2001 Revised by letter dated Januar,' 24,20

Attachment 3 RBG-47414 Revised River Bend Station Operating License Pages

D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to the provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan,"

submitted by letter dated May 16, 2006.

E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The licensee's CSP was approved by License Amendment No. 171 as supplemented by changes approved by License Amendment No. XX.

F. Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, EOI shall report any violations of the requirements contained in Section 2, Items C.(1); C.(3) through (9); and C.(11) through (16) of this license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within 60 days in accordance with the procedures described in 10 CFR 50.73(b), (c) and (e).

G. The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

H. This license is effective as of the date of issuance and shall expire at midnight on August 29, 2025.

FOR THE NUCLEAR REGULATORY COMMISSION Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosures:

5. Attachments 1-5
6. Appendix A - Technical Specifications (NUREG-1 172)
7. Appendix B - Environmental Protection Plan
8. Appendix C - Antitrust Conditions Date of Issuance: November 20, 1985 Amendment No. 70 79 85 119 135 171, Revised byIlette dated OcUtober 28, Revised by letteF dated

,-v1.ombI r 19, 2004 Revised by letter dated January 24,20

Attachment 5 RBG-47414 List of Regulatory Commitments to RBG-47414 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE SCHEDULED (Check One) COMPLETION COMMITMENT ONE- DATE TIME CONTINUING (If Required)

ACTION COMPLIANCE Full implementation of RBS Cyber X June 30, 2016 Security Plan for all safety, security, and emergency preparedness functions will be achieved.