MONTHYEARCP-201201212, Spent Fuel Pool Criticality Analysis2012-10-0909 October 2012 Spent Fuel Pool Criticality Analysis Project stage: Request CP-201300257, License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals.2013-03-28028 March 2013 License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals. Project stage: Request CP-201300826, Supplemental Information Supporting LAR 13-01, Spent Pool Criticality Analysis2013-07-16016 July 2013 Supplemental Information Supporting LAR 13-01, Spent Pool Criticality Analysis Project stage: Supplement ML13253A0052013-09-11011 September 2013 Acceptance Review Following Supplement, Amendment Request to Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and Manuals Project stage: Acceptance Review ML13253A0062013-09-26026 September 2013 Request for Withholding Information from Public Disclosure, 3/18/13 Affidavit Executed by J. Gresham, Westinghouse Regarding WCAP-17728-P, Revision 0 Project stage: Withholding Request Acceptance CP-201301215, License Amendment Request (LAR) 13-01 Supplement Spent Fuel Pool Criticality Analysis Removal Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3..2013-10-22022 October 2013 License Amendment Request (LAR) 13-01 Supplement Spent Fuel Pool Criticality Analysis Removal Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3.. Project stage: Supplement ML13309A0272013-10-31031 October 2013 WCAP-17728-NP, Rev. 1, Comanche Peak Nuclear Power Plant Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis Project stage: Other ML13301A6452013-11-0505 November 2013 Redacted, Request for Additional Information, Amendment Request to Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and Manuals Project stage: RAI ML13317B7032013-11-19019 November 2013 Non-proprietary, Request for Additional Information Round 2, Amendment Request to Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and Manuals Project stage: RAI CP-201301332, License Amendment Request (LAR) 13-01 Supplement Spent Fuel Pool Criticality Analysis Removal Technical Specifications 3.7.17, Spent Fuel Assembly Storage,4.3, Fuel Storage, and 5.5 Programs and Manuals2013-11-26026 November 2013 License Amendment Request (LAR) 13-01 Supplement Spent Fuel Pool Criticality Analysis Removal Technical Specifications 3.7.17, Spent Fuel Assembly Storage,4.3, Fuel Storage, and 5.5 Programs and Manuals Project stage: Supplement ML14016A1242013-12-17017 December 2013 License Amendment Request (LAR) 13-01 Spent Fuel Pool Criticality Analysis, Response to Requests for Additional Information Round 2 Project stage: Response to RAI CP-201301411, Response to Requests for Additional Information Round 2, on License Amendment Request (LAR) 13-01 Spent Fuel Pool Criticality Analysis,2013-12-17017 December 2013 Response to Requests for Additional Information Round 2, on License Amendment Request (LAR) 13-01 Spent Fuel Pool Criticality Analysis, Project stage: Response to RAI ML14027A7052013-12-17017 December 2013 Comanche Peak Responses to LAR 13-01 Request for Additional Information (RAI) - Round 2 Project stage: Request ML14015A5472014-01-15015 January 2014 NRR E-mail Capture - Request for Additional Information - License Amendment Request 13-01 to Revise Technical Specifications 3.7.16, 3.7.17, 4.3 and 5.5 - TACs MF1365 and MF1366 Project stage: RAI CP-201400074, License Amendment Request (LAR) 13-01 Spent Fuel Pool Criticality Analysis, Response to Request for Additional Information2014-01-16016 January 2014 License Amendment Request (LAR) 13-01 Spent Fuel Pool Criticality Analysis, Response to Request for Additional Information Project stage: Response to RAI ML14007A0392014-02-0606 February 2014 Request for Withholding Information from Public Disclosure - 11/22/13 Affidavit Executed by J. Gresham, Westinghouse Responses to 11/5/13 NRC Requests for Additional Information Project stage: RAI ML14058A0892014-02-27027 February 2014 Request for Additional Information Round 3, Amendment Request to Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and Manuals Project stage: RAI ML13318A0292014-03-19019 March 2014 Request for Withholding Information from Public Disclosure, 10/14/13 Affidavit Executed by J. Gresham, Westinghouse Regarding WCAP-17728-P, Revision 1 Project stage: Withholding Request Acceptance ML14022A0462014-03-19019 March 2014 Request for Withholding Proprietary Information from Public Disclosure Project stage: Other ML14097A5132014-04-0707 April 2014 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Spent Fuel Pool Criticality Analysis - TACs MF1365 and MF1366 Project stage: RAI CP-201400503, Response to Requests for Additional Information on License Amendment Request 13-01 Spent Fuel Pool Criticality Analysis2014-04-17017 April 2014 Response to Requests for Additional Information on License Amendment Request 13-01 Spent Fuel Pool Criticality Analysis Project stage: Response to RAI CP-201400619, License Amendment Request (LAR) 13.01, Spent Fuel Pool Criticality Analysis, Supplemental Information to Requests for Additional Information2014-05-0101 May 2014 License Amendment Request (LAR) 13.01, Spent Fuel Pool Criticality Analysis, Supplemental Information to Requests for Additional Information Project stage: Supplement ML14150A1382014-06-30030 June 2014 Request for Withholding Information from Public Disclosure - 7/12/13 Affidavit Executed by B. Maurer, Westinghouse; Supplemental Information Supporting Amendment Request Question 1, 2, and 4 (TAC MF1365-MF1366) Project stage: Withholding Request Acceptance ML14150A1422014-06-30030 June 2014 Request for Withholding Information from Public Disclosure - 4/17/14 Affidavit Executed by J. Gresham, Westinghouse; Responses to Request for Additional Information SFP Configuration Interfaces (TAC MF1365-MF1366) Project stage: RAI ML14160A0352014-07-0101 July 2014 Redacted, Issuance of Amendment No. 162, Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and Manuals Project stage: Approval 2013-09-26
[Table View] |
|
---|
Category:Letter type:CP
MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program2023-09-15015 September 2023 (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2023-08-24024 August 2023 (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)2023-08-17017 August 2023 (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report2023-08-17017 August 2023 (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 1122023-08-0101 August 2023 (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112 CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 32023-07-27027 July 2023 Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3 CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)2023-07-18018 July 2023 (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48) CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 22023-06-20020 June 2023 Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2 CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 12023-06-13013 June 2023 Response to Request for Additional Information Regarding License Renewal Application - Set 1 CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review2023-06-0606 June 2023 Response to Request for Additional Information - License Renewal Application Environmental Review CP-202300207, Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-052023-05-25025 May 2023 Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-05 CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application2023-05-0808 May 2023 Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)2023-05-0404 May 2023 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0) CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Environmental Operating Report CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Effluent Release Report CP-202300165, License Renewal Application Revision 0 - Supplement 22023-04-24024 April 2023 License Renewal Application Revision 0 - Supplement 2 CP-202300175, Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)2023-04-20020 April 2023 Submittal of 2022 Annual Environmental Operating Report (Non-Radiological) CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements2023-04-20020 April 2023 License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements CP-202300140, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-0012023-04-19019 April 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001 CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300135, License Renewal Application Revision 0 - Supplement 12023-04-0606 April 2023 License Renewal Application Revision 0 - Supplement 1 CP-202300144, (CPNPP) - Decommissioning Report2023-03-30030 March 2023 (CPNPP) - Decommissioning Report CP-202300139, (CPNPP) - Property Damage Insurance2023-03-30030 March 2023 (CPNPP) - Property Damage Insurance CP-202300098, (Cpnpp), Annual Report of Changes in Peak Cladding Temperature2023-03-16016 March 2023 (Cpnpp), Annual Report of Changes in Peak Cladding Temperature CP-202200481, Response to Request for Additional Information - Relief Request Application P-1, Inservice Testing (IST)2022-12-0707 December 2022 Response to Request for Additional Information - Relief Request Application P-1, Inservice Testing (IST) CP-202200454, (Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 .2022-12-0101 December 2022 (Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 . CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-0022022-11-21021 November 2022 Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 CP-202200380, (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications2022-11-21021 November 2022 (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications CP-202200450, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters2022-11-16016 November 2022 (CPNPP) - Registration of Dry Spent Fuel Storage Canisters CP-202200435, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2022-11-0808 November 2022 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters CP-202200419, (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report2022-11-0303 November 2022 (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report CP-202200357, (CPNPP) Unit 2 - Response to Request for Additional Information, Fall 2021 (2RF19) Steam Generator Tube Inspection Report2022-09-14014 September 2022 (CPNPP) Unit 2 - Response to Request for Additional Information, Fall 2021 (2RF19) Steam Generator Tube Inspection Report CP-202200358, (CPNPP) - Transmittal of Revised Emergency Plan (Revision 46)2022-09-14014 September 2022 (CPNPP) - Transmittal of Revised Emergency Plan (Revision 46) CP-202200246, Evacuation Time Estimate Analysis2022-08-25025 August 2022 Evacuation Time Estimate Analysis CP-202200306, (CPNPP) - Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22)2022-08-11011 August 2022 (CPNPP) - Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22) CP-202200273, Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2022-07-20020 July 2022 Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative CP-202200276, (CPNPP) - Relief Request Application P-1, Inservice Testing (IST)2022-07-20020 July 2022 (CPNPP) - Relief Request Application P-1, Inservice Testing (IST) CP-202200247, (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 0172022-06-30030 June 2022 (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017 2024-01-31
[Table view] |
Text
Rafael Flores Luminant Power Senior Vice President P 0 Box 1002
& Chief Nuclear Officer 6322 North FM 56 rafeel.flores@Luminant.com Glen Rose, TX 76043 Luminant 254975590 C 817 559 0403 F 254 897 6652 REF: 10CFR50.90 CP-201400074 TXX-14008 January 16, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)
DOCKET NOS. 50-445 AND 50-446 LICENSE AMENDMENT REQUEST (LAR) 13-01 SPENT FUEL POOL CRITICALITY ANALYSIS, RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION (TAC NOS. MF1365 AND MF1366)
REFERENCE:
- 1. Letter logged TXX-13045, dated March 28,2013, License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, "FUEL STORAGE POOL BORON CONCENTRATION," 3.7.17, "SPENT FUEL ASSEMBLY STORAGE," 4.3, "FUEL STORAGE," and 5.5 "PROGRAMS AND MANUALS" (ML13095A023)
- 2. Letter logged TXX-13109, dated July 16, 2013, "Supplemental Information supporting LAR 13-01, Spent Fuel Pool Criticality Analysis" (ML13205A056)
- 3. Letter logged TXX-13169, dated November 26,2013, regarding the CPNPP response to Requests for Additional Information for LAR 13-01, Spent Fuel Pool Criticality Analysis (ML13346A175)
- 4. Letter logged TXX-13182 dated December 17, 2013, regarding the CPNPP response to Requests for Additional Information for LAR 13-01, Spent Fuel Pool Criticality Analysis
- 5. Email dated January 15, 2014, from Balwant Singal of the NRC to Timothy Hope of Luminant Power, RE: Request for Additional Information - License Amendment Request 13-01 to Revise Technical Specifications 3.7.16, 3.7.17, 4.3 and 5.5 (TACs MF1365 and MF1366)
Dear Sir or Madam:
In March 2013, Luminant Generation Company LLC (Luminant Power) submitted a License Amendment Request (LAR) 13-01 (Reference 1, as supplemented by Reference 2 and the response to Requests for Additional Information in References 3 and 4) to the NRC for Facility Operating License Nos. NPF-87 and NPF-89 for Comanche Peak Nuclear Power Plant (CPNPP), Units 1 and 2, respectively. This LAR proposes a change to the CPNPP, Units I and 2, Technical Specifications based on an updated criticality analysis methodology for the spent fuel pools.
C 1JI
U. S. Nuclear Regulatory Commission TXX-14008 Page 2 of 2 01/16/2014 Per Reference 5, the U.S. Nuclear Regulatory Commission (NRC) staff has requested additional information (RAI), regarding the LAR, be submitted in order to complete its review. The attachment to this letter provides Luminant Power's response to the RAIs.
In accordance with 10CFR50.91 (b), Luminant Power is providing the State of Texas with a copy of this proposed amendment. of Reference 1, Description and Assessment, which addresses the no significance hazards consideration standards set forth in 10CFR50.92, remains valid and does not require Change.
This communication contains no new commitments regarding Comanche Peak Units 1 and 2.
Should you have any questions, please contact Mr. J. D. Seawright at (254) 897-0140.
I state under penalty of perjury that the foregoing is true and correct.
Executed on January 16, 2014.
Sincerely, Luminant Generation Company LLC Rafael Flores By:
ThomarP. McCool Vice President, Station Support
Attachment:
Comanche Peak Responses to LAR 13-01 Request for Additional Information (RAI) c- Marc L. Dapas, Region IV Balwant K. Singal, NRR Resident Inspectors, Comanche Peak Mr. Robert Free Environmental Monitoring & Emergency Response Manager Texas Department of State Health Services Mail Code 1986 P. 0. Box 149347 Austin, Texas 78714-9347
Attachment to TXX-14008 Page I of 1 Comanche Peak Responses to LAR 13-01 Request for Additional Information (RAI)
NRC Question #1 Will there be any changes to the training curriculum for Qualified Core Performance Engineers (CPE) pertaining to the development of fuel movement plans as it relates to criticality? If so, please describe the changes.
CPNPP Response:.
Training for Qualified Core Performance Engineers will be completed prior to implementation of the Technical Specification changes, as described below.
The Core Performance Engineering qualification process at CPNPP utilizes a Subject Matter Expert (SME) review to ensure personnel are knowledgeable in activities including fuel move planning and performance of Surveillance Requirement SR 3.7.17.1. The SME Objectives for the Core Performance Monitoring qualification (required to perform or review the SR 3.7.17.1 surveillance) and the Core Performance Fuel Handling qualification (required for performing or reviewing fuel move plans) have been updated to reflect the changes to the Technical Specifications, QA software, Region I neutron absorber monitoring program, and process for performing the Surveillance. These changes ensure that all future personnel qualified under this program will demonstrate adequate understanding of the SFP Criticality Analysis and associated limits prior to independently performing or reviewing fuel move plans.
Additionally, a Training Needs Analysis was completed as part of the transition to determine the training needs for currently qualified Core Performance Engineering personnel. This needs analysis determined that currently qualified personnel will be trained on the changes to the Technical Specifications, the supporting criticality analysis, and the implementing procedures and associated QA software. This training is currently being developed, and will be completed for all personnel qualified to prepare or review fuel move plans prior to implementation of the Technical Specification changes.
NRC Question #2 Will there be any changes to the training program for CPEs or fuel handlers due to operating experience pertaining to fuel misload accidents? If so-,-pease describe the changes.
CPNPP Response:
Training for Core Performance Engineers and Fuel Handling qualified personnel has been developed as described below, and will be completed prior to implementation of the Technical Specification changes.
The Operating Experience program at Comanche Peak regularly reviews industry operating experience, and applicable lessons learned are incorporated into site processes and procedures. Since the qualification processes for fuel handling and fuel move planning activities reference current processes and procedures, the lessons learned from Operating Experience related to misload accidents are inherently included as part of the qualification process.
A Training Needs Analysis was completed to determine the training needs for both Core Performance Engineers and Operations (Licensed Operators and Fuel Handling qualified personnel) based on the License Amendment Request. Through this analysis, it was determined that additional training was necessary to ensure that appropriate personnel are familiar with the revisions to the Technical Specifications, as well as the revised fuel handling procedural requirements which address the risk of a fuel misload event. This additional training focuses on the changes to the Technical Specifications, the procedure revisions as described in Enclosure I to TXX-13045 (LAR-13-01), and the increased responsibility of fuel handling personnel. Core Performance Engineers, Licensed Operators, and Fuel Handling qualified personnel will attend this training.
Operating Experience which describes an event involving multiple fresh fuel assemblies misloaded within a Spent Fuel Pool was influential on the development of the administrative controls described in Enclosure I of the License Amendment Request. This specific OE Report is included in the training material because it highlights the purpose and importance of changes to the fuel move planning controls as well as the responsibilities of fuel handling personnel.