ML13331A515

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Allowing Schedular Extension for Items 5 & 18 of Cycle 11 Full Term OL
ML13331A515
Person / Time
Site: San Onofre 
Issue date: 11/07/1990
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML13331A510 List:
References
NUDOCS 9011140079
Download: ML13331A515 (4)


Text

Attachment 1 EXISTING CYCLE 11 FTOL SCHEDULE 9011140079 01107 PDR ADOCK 05000206 p

PNu

ATTACHMENT 1 SONGS 1 Cycle 11 FTOL Projects hem 19891 1990 1991 1992 1993 No.

Descipion 1 A ~S io,!!,DI J1 F M1 A1 -M JI J1 A1 S 0 N I D J1 F A1 1 JI J1 A1 S0 N DI J1 F M1 A, 1 J1 J A S 1 ID f 6401212 9/12 2/9' I

SEPUII-3A (Grotmdvalor L6Wel NR AW-d BI I

I I

BI 2

lassiicafion ol Sbuclums SCE 4xavd TripRamnoval tni paa 4

SEP W - 7.B (Bucking)

,IAprv TechSpecBII 5

Im Oww Prelsag Protecion chm""

NRC Aprova 1 6

Reackv Vessel Embwideement SCE Dima vh NRC PM I I

I 7

ATWS Salem IFI N.o a Rulof Vlve TestSCE Pamw*v SEA Issims IIB T"~

NRIC ro~dI

  • 9 ATVWS (Oiversi Turbine Tsi) fles~s Apad D@-i a SCE lmpyomeid F~ivu I

10 Root Pondng (Scaipwes)

Design I

SCE IriplemenlA I

SCEm Fuy k-d A.I It 480OVoverload NCN Desgn SCinaeer 12 ApaceGh'ging Ptnaats I

Ima moI Pump mo IB 13 EO HottLeg Pecrc.

ro I Ckpeewl~i Permanent Fix I

15 Ruluofng Waler Levol FlbW Design PiOiSe I

SCE Bwpkmmid A I

B I

16 IWS Testing NR VmopC 17 Piocodwes Goncration Paduige SCE Sbnlgd I

NWC AprvnlI SCE Actionii'l IS cnrvn etn NRC ActionPC I

CEII I~

I CYL 1 I

OUTAGE I

I OUTAGE I

0ifical NnfC action we~uired REVISED CYCLE 11 FTOL SCHEDULE

Figure 1 SONGS 1 Cycle 11 FTOL Projects Item 1989 1990 1991 1992 1993 No.

Description A SO N D

J F M AM JJAS O

N D J FMA M JJ 1

A S ON D J F M AM J

J A

S ON DIJ F M 6/30 12/2 9J12 2/9 I

II 1

SEP III - 3.A (Groundwater Level) NRC Approval 2

Classification of Structures NRC Approval I

3 Reactor Coolant Pump SCE NRC Trip Removal uma Approval I

4 SEP Ill - 7.B (Buckling)

NRC Approval Tech Spec NRC 5

RHR Over Pressure Change Approval Protection 6

Reactor Vessel Embrittlement SCE Discuss with NRC PM NRC Approval I

7 ATWS - Salem 8

Relief Valve Test SCE Resolve SER Issues Test NRC Final g

ATWS Results Approval Design SCE Implement (Diverse Turbine Trip)

Final 10 Roof Ponding (Scuppers)

Design SCE Implement Submit Final 11 480V Overload PCN Design SCE Implement NRC Approval 12 place Charging Procure Install Motor Pump Motor 13 EQ Hot Leg Recirc.

SCE Implement Final 14 Component Cooling Water Design SCE Implement Permanent Fix 15 Refueling Water Level Final Design Procure SCE Implement 16 RPS Testing NRC Approve PCN 17 Procedures Generation Package SCE Submittal NRC Approval I

SCE 18 Containment Venting I

Submittal NRC Approve PCN I

I I

I A SCE Action v NRC Action12 CYCLE 11 Critical NRC action required OUTAGE OUTAGE