Southern California Edison Company P. 0.
BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 K. P. BASK IN TELEPHONE MANAGER, NUCLEAR ENGINEERING August 19, 1980 (213) 5721401 AND LICENSING Director of Nuclear Reactor Regulation Attention:
D. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Subject:
References to Docketed Information San Onofre Nuclear Generating Station Unit 1 Mr. D. L. Ziemann's letter of February 14, 1980, requested references to docketed information relating to a number of SEP topics. The requested information is provided as an enclosure to this letter.
If you have any questions on this matter, please let me know.
Enclosure 47 8008250 64r
ENCLOSURE REFERENCES TO DOCKETED INFORMATION SAN ONOFRE NUCLEAR GENERATING STATION UNIT 1 II-2.A Severe Weather Phenomena
References:
- 1. San Onofre Unit 1 Final Safety Analysis Report, Section 1.2
- 2. -San Onofre Units 2&3 Final Safety Analysis Report, Section 2.3
- 3. SCE letter from J. G. Haynes to D. L. Ziemann dated May 7, 1979 II-3.C Safety Related Water Supply (Ultimate Heat Sink (UHS))
References:
- 1. San Onofre Unit 1 Final Safety Analysis Report, Section 3.1.7 III-4.A Tornado Missiles
References:
- 1. San Onofre Units 2&3 Final Safety Analysis Report, Section 3.3
- 2. Amendment No. 38 to Docket No. 50-206 submitted February 7, 1975, Section 4.3
- 3. Amendment No. 52 to Docket No. 50-206 submitted December 3, 1975, Section 3.1
- 4. SCE letter from J. G. Haynes to D. L. Ziemann dated May 7, 1979 V-6 Reactor Vessel Integrity
References:
- 1. NUREG-0569, Evaluation of the Integrity of SEP Reactor Vessels.
- 2. SCE letter from J. T. Head, Jr. to R. H. Engelken dated July 13, 1979.
VI-7.A.1 ECCS Reevaluation to Account for Increased Reactor Vessel Upper Head Temperature
References:
- 1. SCE letter from K. P. Baskin to Karl R. Goller dated December 30, 1976
- 2. NRC Amendment 25 forwarded by letter from Victor Stello, Jr.
to Jack B. Moore dated April 1, 1977.
-2 VI-7.C.1 Appendix K - Electrical Instrumentation and Control (EIC) Re-reviews
References:
- 1. SCE letter from K. P. Baskin-to A. Schwencer dated December 21, 1976
- 2. SCE letter from K. P. Baskin to A. Schwencer dated March 25, 1977 VI-8 Control Room Habitability
References:
- 1. Site Visit with NRC on May 24 and 25, 1978. See NRC letter from D. L.,Ziemann to J. H. Drake dated July 18, 1978
- 2. SCE memo from D. E. Nunn to A. Burger dated August 11, 1978
- 3. SCE letters from K. P. Baskin to A. Schwencer dated August 8, 1977, September 22, 1977 and October 26, 1977.
- 4. SCE letter from K. P. Baskin to D. L. Ziemann dated November 14, 1978.
- 5. SCE letter from K. P. Baskin to D. M. Crutchfield dated June 13, 1980.
VIII-4 Electrical Penetrations of Reactor Containment
References:
- 1. SCE letter from J. G. Haynes to D. L. Ziemann dated June 15, 1979
- 2. Telephone conversations between A. C. Llorens (SCE) and Steve Mays (EG&G) on August 30, September 18 and October 26, 1979
References:
- 1. San Onofre Unit 1 Final Safety Analysis Report, Section 2.6
- 2. SCE letter from K. P. Baskin to A. Schwencer dated December 21, 1976
-3 XV-9 Startup of an Inactive Loop or Recirculation Loop at an Incorrect Temperature, and Flow Controller Malfunction Causing an Increase in BWR Core Flow Rate
References:
- 1. SCE letter from J. H. Drake to H. R. Denton dated June 11, 1979
- 2. NRC letter from D. L. Ziemann to J. H. Drake dated July 19, 1979
- 3. NRC topic assessment forwarded by letter dated November 13, 1979 XV-10 Chemical and Volume Control System Malfunction That Results in a Decrease in Boron Concentration in the Reactor Coolant (PWR)
References:
- 1. San Onofre Unit 1 Final Safety Analysis Report, Section 7.3
- 2. NRC letter from A. Schwencer to J. H. Drake dated September 26, 1977.
- 3. SCE letter from K: P. Baskin to D. L. Ziemann dated November 20, 1978.
- 4. NRC letter from D. L. Ziemann to J. H. Drake dated February 21, 1979.
XV-11 Inadvertant Loading and Operation of a Fuel Assembly in an Improper Position (BWR)
No references available XV-12 Spectrum of Rod Ejection Accidents (PWR)
References:
- 1. San Onofre Unit I Final Safety Analysis Report, Sections 7.6 and 13.2
- 2. NRC letter from D. L. Ziemann to J. H. Drake dated October 24, 1979
- 3. SCE letter from J. G. Haynes to D. L. Ziemann dated November 16, 1979
-4
- 4. NRC letter from D. L. Ziemann to 3. H. Drake dated January 29, 1980.
- 5. SCE letter from J. B. Moore to E. G. Case dated March 7, 1975
- 6. NRC,letter from R. A. Purple to 3. B. Moore dated May 13, 1975.
- 7. SCE letter from R. Dietch to H. R. Denton dated February 8, 1980.
- 8..NRC letter from D. M. Crutchfield to R. Dietch dated May 29, 1980.
XV-19 Loss of Coolant Accidents Resulting from Spectrum of Postulated Piping Breaks Within the Reactor Coolant Pressure Boundary
References:
- 1. San Onofre Unit.1 Final Safety Analysis Report, Sections 8.1 and 13.2
- 2. NRC letter from D. L. Ziemann to J. H. Drake dated March 15, 1979
- 3. NRC letter from D. L. Ziemann to J. H. Drake dated January 29, 1980.
- 4. SCE letter from J. G. Haynes to D. L. Ziemann dated April 9, 1979
- 6. SCE letter from 0. J. Ortega to D. J. Skovkolt dated January 31, 1973.
- 7. SCE Amendment No. 38 dated February 7, 1975.
- 8. SCE letter from K. P. Baskin to K. R. Goller dated December 30,1976.
- 9. NRC letter from Victor Stello to Jack B. Moore dated April 1, 1977.
- 10. SCE letter from K. P. Baskin to D. G. Eisenhut dated May 30, 1978.
WESTINGHOUSE PRESSURIZED WATER REACTOR LICENSEES Docket No. 50-334 Docket No. 50-280 Beaver Valley Unit 1 Surry Unit 1 Docket No. 50-315 Docket No. 50-281 D. C. Cook Unit 1 Surry Unit 2 Docket No. 50-316 Docket No. 50-344 D. C. Cook Unit 2 Trojan Docket No. 50-348 Docket No. 50-250 Farley Turkey Point Unit 3 Docket No. 50-3 Docket No. 50-251 Indian Point Unit 1 Turkey Point Unit 4 Docket No. 50-247 Docket No. 50-295 Indian Point Unit 2 Zion Unit 1 Docket No. 50-286 Docket No. 50-304 Indian Point Unit 3 Zion Unit 2 Docket No. 50-305 Docket No. 50-244 Kewaunee Ginna Docket No. 50-338 Docket No. 50-213 North Anna 1 Haddam Neck Docket No. 50-266
(
e o 50-06 Point Beach Unit 1SaOnreUi Docket No. 50-301 Docket No. 50-29 Point Beach Unit 2 Yankee-Rowe Docket No.
50-282 Prairie Island Unit 1 Docket No. 50-306 Prairie Island Unit 2 Docket No. 50-261 H. B. Robinson Unit 2 Docket No. 50-272 Salem Unit 1