ML13326A650

From kanterella
Jump to navigation Jump to search
Forwards Amend 56 to License DPR-13,safety Evaluation & Notice of Issuance & Availability.Amend Revises App a Tech Specs & Bases to Reflect Revised Requirements for Svc Test of Uninterruptible Power Supply Battery & Rod Indicators
ML13326A650
Person / Time
Site: San Onofre 
Issue date: 06/11/1981
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Dietch R
Southern California Edison Co
Shared Package
ML13326A651 List:
References
LSO5-81-06-033, LSO5-81-6-33, NUDOCS 8106240049
Download: ML13326A650 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20,55

- 'June 11, 1981 Docket No. 50-206 LS05-81-06-033 Mr. R. Dietch Vice President Nuclear Engineering and Operations Southern California Edison Company 9

2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770

Dear Mr. Dietch:

The Commission has.lssued the enclosed Amendment No. 56 to Provisional Operating License No. DPR-13 for the San Onofre Nuclear Generating Station (SONGS), Unit 1. The amendment consists of changes to the Technical Speci fications in response to your requests dated October ?0, 1978, (Proposed Change No. 76), March 31, 1980 (Proposed Change No. 89), April 4, 1980 (Proposed Change No. 91), June 30, 1980 (Proposed Change No. 93), and December 1, 1980 (Proposed Change No. 96).

These requests are supported by information transmitted by your letters dated December 19, 1979, January 9, February 14, and May 16, 1980, in addition to an undated letter received by us on October 9, 1980.

The amendment revises the Appendix A Technical Specifications and Bases to reflect: (1) revised requirements.for the service test of an uninter ruptible power supply battery; (2) revised requirements relating to the Control Rod Position Indication System; (3) revised surveillance for the Offsite Power System; (4) revision of the definition of the term "Operable" to make it consistent with the Standard Technical Specifications; and (5) addition of the definition of modes of operation to conform closely to the Standard Technical Specifications.

The portions of your application requesting Technical Specification changes for decay heat removal and most of the changes for Specification 4.4, Emergency Power System Periodic Testing 'remain under review.

The Technical Specification changes for Proposed Change No. 89 are to be implemented within 60 days after the date of issuance of this amendment, according to your request, to allow you to gather and incorporate data during plant restart. The Technical Specification pages associated with Proposed Change No. 89 are identified on the first page of the attachment to the license amendment.

ISWLATORYDCl(T F[E COPY 8 10 6 2 4O

Mr. June 11, 1981 During our review we found it necessary to modify your applications.

We discussed the changes with your representative and mutually agreed upon them.

Copies of our related Safety Evaluation and the Notice of Issuance are also enclosed.

Sincerely, Ol nal. sqed by Dnis M. Crutc fie d, Chief perating Reactors Branch #5 A

Division of Licensing

Enclosures:

1 Amendment No. 56 to License No. DPR-13

2. Safety Evaluation
3. Notice-of Issuance cc w/enclosures:

See next page OFFICEO DL: ORB #5* DL: ORB #5* DL: ORB #3

  • DL: SEPB*

OELD*

DL: ORB #5* DL: AD/SA*

SURNAMEO HSmith:cc SNowicki PWagner RScholl LChandlier DCrutchfield GLainas DA E~.......................................

............................. I DATE c oumnoeoNeyo40OFFICIAL RECORD COPY USGPO 1980-329-824

Mr. R. Dietch 2

During our review of Proposed Change No. 91 we found it necessary to modify your application with respect to the switchyard configuration.

We discussed this change with your representative and mutually agreed upon them before issuing license Amendment No. 52 dated February 6, 1981.

The inadvertent omission of the change to Specification 4.4.A was also iscussed with your staff and the corrections were discussed and mutually agreed upon.

Copies of our related Safety Evaluation and the Notice of Issuance are also enclosed.

Sincerely, Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing

Enclosures:

1.

Amendment No.

to License No..DPR-13 DISTRIBUTION

2.

Safety' Evaluatlon--

Docket

3. Notice of Issuance NRC PDR Local PDR cc w/enclosures:

ORB Reading See next page DCrutch jeld SNowicki PWagner RSchol1 NSIC TERA OELD OI&E (5)

ACRS (10)

GDeegan (4)

OFFICE)

ORB #t5B D

D 4D/S SURNAME)

HSmith:cc.

SNP ner RSchol 1 DC DATEO R

.FR 3.................

y OFFICIAL RCCO

_UP:8-92 NRC TORM 318 (10180) NRCM 0240 OFFICIAL R EtCOR I 0 C PY

Mr. R. Dietch

-2 During our review of Proposed Change No. 91 we found it necessary to modify your application with respect to the switchyard configuration.

We discussed this change with your representative and mutually agreed upon them before issuing license Amendment No. 52 dated February 6, 1981.

The inadvertent omission of the change to Specification 4.4.A was also Ciscussed with your staff and the corrections were discussed and mutually agreed upon.

Copies of our related Safety Evaluation and the Notice of Issuance are also enclosed.

Sincerely, Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing

Enclosures:

1. Amendment No.

to License No. DPR-13 DISTRIBUTION

2. Safety Evaluation Docket
3.

Notice of Issuance NRC PDR Local PDR cc w/enclosures:

ORB Reading See next page DCrutchfield HSmith SNowicki PWagner RSchol1 NSIC TERA OELD OI&E (5)

ACRS (10)

GDeegan-(4)

BScharf (10)

D.R.#3.

.L.DLR DL: ORB #5 DL: AD/SA VV jLR5

.L*#.

L.....

SL.RNAMEO HSmith:cc SNoWicki PWagngr RScholl DCrutchfield GLainas RCYORM 318 (10/80) NRCM 0240 OFFICIAL RECOR C

  • 1C 0 P Y

-~~USOPO:

9032-2

Mr. R. Dietch 2 -

June 11, 1981 During our review we found it necessary to modify your applications.

We discussed the changes with your representative and mutually agreed upon them.

Copies of our related Safety Evaluation and the Notice of Issuance are also enclosed.

Sincerely Dennis M/Crutc field, Chie.

Operating Reactors Branch #5 Division of Licensing

Enclosures:

1. Amendment No. 56 to License No. DPR-13
2. Safety Evaluation
3. Notice of Issuance cc w/enclosures:

See next page

Mr. R. Dietch 3

June 11, 1981 cc Charles R. Kocher, Assistant Director, Criteria and Standards General Counsel Division Southern California Edison Company Office of Radiation Programs Post Office Box 800 (ANR-460)

Rosemead, California 91770 U. S. Environmental Protection Agency David R. Pigott Washington, D. C. 20460 Samuel B. Casey Chickering & Gregory U. S. Environmental Protection Three Embarcadero Center Agency Twenty-Third Floor Region IX Office San Francisco, California 94111 ATTN: EIS COORDINATOR 215 Freemont Street Jack E. Thomas San Francisco, California 94111 Harry B. Stoehr San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector c/o U. S. NRC P. 0. Box AA Oceanside, California 92054 Mission Viejo Branch Library 24851 Chrisanta Drive Mission Viejo, California 92676 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 California Department of Health ATTN:

Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814