ML13326A654

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 56 to License DPR-13
ML13326A654
Person / Time
Site: San Onofre 
Issue date: 06/11/1981
From: Snaider R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML13326A651 List:
References
NUDOCS 8106240060
Download: ML13326A654 (2)


Text

7590-01 UNITED STATES NUCLEAR REGULATO2Y COMMISSION DOCKET NO. 50-206 SOUTHERN CALIFORNIA EDISON COMPANY AND SAN DIEGO GAS AND ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO PROVISIONAL OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 56 to Provisional Operating License No. DPR-13, issued to Southern California Edison Company and San Diego Gas and Electric Company (the licensees), which revised the Technical Specifications for operation of the San Onofre Nuclear Generating Station, Unit No. 1 (the facility),

located in San Diego County, California. This amendment is effective as of its date of issuance. However, the Technical Specification provisions related to Proposed Change No. 89 are to be implemented within 60 days after the date of issuance of the amendment. The Technical Specification pages associated with Proposed Change No. 89 are identified in the amendment.

The amendment revises the Appendix A Technical Specifications and Bases to reflect (1) revised requirements for the service test of an uninterruptible power supply battery; (2) revised requirements relating to the Control Rod Position Indication System; (3) revised surveillance for the offsite power systems; (4) revision of the definition of the term Operable"to make it consistent with the Standard Technical Specifications; and (5) addition of the definition of modes of operation to conform closely to the Standard Technical Specifications.

The applications for amendment comply with the standards and require ments of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate 810624 OO

7590-01

-2 findings as required by the Act and the -Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR §51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the applications for amendment dated October 20, 1978, March 31, 1980, April 4, 1980, June 30, 1980, and December 1, 1980, as supported by by information submitted by letters dated December 19, 1979, January 9, February 14, and May 16, 1980, in addition to an undated letter received by the Commission on October 9, 1980, (2) Amendment No. 56 to License No. DPR-13, and (3) the Commission's related Safety Evaluation. These items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N. W., Washington, D. C. and the Mission Viejo Branch Library, 24851 Chrisanta Drive, Mission Viejo, California. A single copy of items (2) and (3) may be obtained by request addressed to the U. S..Nuclear Regulatory Commission, Washington, D. C. 20555, Attention:

Director, Division of Licensing.

Dated at Bethesda, Maryland, this 11th day of June, 1981.

FOR T NUCLEAR REGULATORY OMMISSION Richard P. Snaider, Acting Chief Operating Reactors Branch #5 Division of Licensing