MONTHYEARML20151X3911986-01-31031 January 1986 Loss of Power and Water Hammer Event at San Onofre,Unit 1 on November 21,1985 Project stage: Other ML13333B0891986-03-0707 March 1986 Revised Metallurgical & Failure Analysis of 10-Inch Carbon Steel Steam Line for Unit 1,Main Feedwater Sys Project stage: Other ML20155B0151986-04-0808 April 1986 Forwards Investigation Rept of 851121 Water Hammer Event,Per 860317 & 21 Requests.Response to 860325 Request for Addl Info Will Be Provided by 860430 Project stage: Request ML20155B0291986-04-30030 April 1986 Investigation Rept,San Onofre Unit 1 Water Hammer Event of 851121 Project stage: Other ML13330A6121986-04-30030 April 1986 Performance Tests on Feedwater Check Valves for San Onofre Unit 1 Nuclear Power Plant Phase a, Final Rept Project stage: Other ML13324A8461986-05-0101 May 1986 Forwards Responses to 860325,0421 & 29 Requests for Addl Info Re 860408 Investigation Rept of 851121 Water Hammer Event Project stage: Other ML13324A8441986-05-0505 May 1986 Forwards Performance Tests on Feedwater Check Valves for San Onofre Unit 1 Nuclear Power Plant Phase a, Final Rept Project stage: Other ML13324A8701986-05-28028 May 1986 Forwards Generation of Floor Response Spectra for Reactor & Turbine Bldgs,San Onofre Nuclear Generating Station 1,Long Term Svc Seismic Reevaluation Program, & Instructure Response Spectra for Turbine Bldg,Per SEP Topic III-6 Project stage: Request ML13324A8891986-06-16016 June 1986 Forwards Comments on Documentation of 860502 & 07 Telcons to Obtain Addl Info Re Util Actions in Response to 851121 Water Hammer Event,Per Project stage: Other ML13324A9071986-07-0101 July 1986 Forwards Comments on NRC 860605 Evaluation of Technical Issues Re 851121 Water Hammer Event Project stage: Other IR 05000206/19860301986-07-0101 July 1986 Insp Repts 50-206/86-30 & 50-361/86-21 on 860616-27.No Violation Noted.Major Areas Inspected:Inservice Insp Activities,Open Items,Part 21 Item & Bulletins Project stage: Request ML13324A9131986-07-0707 July 1986 Confirms 860702 Telcon Re Design Info for Newly Installed Third Auxiliary Feedwater Pump.Design Rated Flow Is 355 Gpm, Last Point on Mfg Design Curve at 670 Gpm & Pump Test Results Acceptable After Installation Project stage: Other ML13324A9301986-07-30030 July 1986 Updates 860701 Comments on NRC Evaluation of Technical Issues Re 851121 Water Hammer Event.Fabrication of Labels for Vital Bus Indication Configuration in Progress & Will Be Installed by 860815 Project stage: Other 1986-05-28
[Table View] |
Text
Southem California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 M. 0. MEDFORD TELEPHONE MANAGER. NUCLEAR LICENSING 18181 302-1749 May 28, 1986 Director, Office of Nuclear Reactor Regulation Attention: G. E. Lear, Director PWR Project Directorate No. 1 U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Subject:
Docket No. 50-206 Floor Response Spectra for the Reactor and Turbine Buildings SEP Topic 111-6, Seismic Design Considerations San Onofre Nuclear Generating Station Unit 1 As part of the long term service seismic reevaluation program at San Onofre Unit 1, new floor response spectra were developed for the reactor and turbine buildings.
The methodology and results of this effort have been discussed with the NRC and its consultants in several meetings over the past year.
Provided as Enclosure 1 is the following report which documents this effort:
Generation of Floor Response Spectra For The Reactor and Turbine Buildings, San Onofre Nuclear Generating Station - Unit 1, Long Term Service Seismic Reevaluation Program, March 1986.
Recently, the response spectra in the mezzanine of the north extension of the turbine building were regenerated to reflect the overall strengthening of this structure. This strengthening was a result of the elimination of inelastic beams in this structure. The resulting new response spectra are discussed in Enclosure 2:
Instructure Response Spectra for the Turbine Building Mezzanine, San Onofre Nuclear Generating Station, Unit 1, May 1986.
If you have any questions on the enclosed information, please let us know.
Very truly yours, 8360530019
)206 71.&
ppjS AD6CK 050PDR
(
Enclosure cc: