Provides Schedule for Submittal of Info Re ATWS Mitigations Sys for Facility,Per NRC 900213 Request.Results of site- Specific Analysis Will Be Provided Approx 900430
ML13322B122
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/26/1990
From: Nandy F
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9003300189
Download: ML13322B122 (2)


Text

Southern California Edison Company 23 PARKER biNEET IRVINE. CALIFORNIA 9271a F

r NALPHON MANAoER OFULAN kcICE N

(

March 26, 1990 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

Docket No. 50-206 ATWS Rule, 10 CFR 50.62 San Onofre Nuclear Generating Station, Unit 1 The purpose of this letter is to provide a schedule for submittal of information requested in your letter dated February 13, 1990 regarding the ATWS Mitigation System for SONGS 1. You requested the results of the Westinghouse site-specific analysis to establish the auxiliary feedwater (AFW) flow requirements, identification of generic design assumptions relative to the ATWS rule that do not apply to SONGS 1, and our resolution of the design discrepancies within 30 days of the receipt of the letter, or as soon thereafter as possible.

We will provide the results of the SONGS 1 site-specific analysis by approximately April 30, 1990. The site-specific analysis will establis. the acceptability of the SONGS 1 plant specific AMSAC design to satisfy the ATWS rule. We are reviewing the generic design assumptions to determine which are not applicable to SONGS 1. Based on our internal review and approval process, we will submit the description and resolution of design discrepancies, if any, to the NRC by May 15, 1990.

We indicated in a letter dated October 31, 1989, that the results of maximum credible fault (MCF) current tests of the Consolidated Controls isolation devices would be submitted by March 30, 1990. The previous design of the diverse turbine trip (DTT) in the ATWS Mitigation System required these isolation devices. As a result of our recent redesign, these isolation devices are no longer required. Therefore, no further discussion is needed on the isolation devices in the ATWS Mitigation System. The description of the redesign will also be provided to you on April 30, 1990.

CIC I e,,7, 9()(:3::6 F

CCC, PC'LI.

Documrent Control Desk March 1990 Since the Safety Parameter Display System (SPDS) will use the isolation devices, results of the MCF current tests for the isolation device will be provided to you for the SPOS review.

If you have any questions or comments, please let me know.

Sincerely, cc:

J. B. Martin, Regional Administrator, NRC Region V C. Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3