Proposed Change 85 to Tech Spec 6.0 of App a & ETS 5.0 of App B.Describes Change & Reason for Change.No Safety Issue Involved.Changes Are Administrative Only.Organization Charts Encl
ML13322A633
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/28/1979
From:
SAN DIEGO GAS & ELECTRIC CO., SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML13322A630 List:
References
NUDOCS 8001020605
Download: ML13322A633 (5)


Text

DESCRIPTION OF PROPOSED CHANGE AND SAFETY AND ENVIRONMENTAL ANALYSIS PROPOSED CHANGE NO.

85 TO THE TECHNICAL SPECIFICATIONS PROVISIONAL OPERATING LICENSE DPR-13 This is a request to revise Technical Specification 6.0 of Appendix A, and Environmental Technical Specification 5.0 of Appendix B.

REASON FOR PROPOSED CHANGE This proposed change would incorporate corporate reorganization changes into the appropriate Administrative Controls Sections of the Appendix A Technical Specifications and Appendix B Environmental Technical Specifications.

The review and submittal responsibilities of the Nuclear Control Board are redefined to comply with the guidance provided by the NRC, by letter dated March 5, 1979. That letter indicates that the provisions in Section 6.5.3.5.a shall not be interpreted to impose requirements for reporting violations of technical specifications beyond the requirements set forth in Section 6.9 "Reporting Requirements."

EXISTING SPECIFICATIONS The existing sections within Technical Specifiations 6.0 and Environmental Technical Specifications 5.0 are as constituted in the Appendices A and B Technical Specifications, respectively, for San Onofre Unit 1.

PROPOSED SPECIFICATIONS Appendix A Section 6.0 would be revised as follows:

(1) 6.5.2.2 The NARC shall be composed of the:

Manager of Engineering Design Manager of Environmental Affairs Manager of Nuclear Engineering & Licensing Manager, Quality Assurance Manager, Nuclear Generation Chief of Nuclear Engineering Chief of Development & Environmental Engineering San Diego Gas & Electric Representative Chairmanship shall be designated by the Nuclear Control Board.

(2) 6.5.3.2 The NCB shall be composed of the:

Vice-President (Nuclear Engineering & Operations)

Vice-President (Advanced Engineering)

Vice-President (Engineering & Construction)

Vice-President (San Diego Gas & Electric)

(3) 6.5.3.5

a. Review reportable occurrences submitted to the NRC in accordance with Technical Specification 6.9.2.

(4) 6.2.3 Fire Protection Orqanizations The responsibility for the Fire Protection Program at the San Onofre Nuclear Generating Station Unit 1 is vested in the Senior Vice President.

The implementation of this program is delegated to staff and line organizations within the Nuclear Engineering and Operations Department and the Power Supply Department as shown in Figure 6.2.3.1.

Revised Figures 6.2.1.1, Offsite Organization and 6.2.3.1, Fire Protection Staff and Line Organizations are attached.

The balance of Technical Specification 6.0 would remain unchanged.

Appendix B Section 5.0 would be revised as follows:

(1) 5.3.2

a. Membership (Chairman designated by the Nuclear Control Board (1) Manager of Engineering Design (2) Manager of Environmental-Affairs (3) Manager of Nuclear Engineering & Licensing (4) Chief of Nuclear Engineering (5) Chief of Development & Enviornmental Engineering (6) Manager, Quality Assurance (7) Manager, Nuclear Generation (8) San Diego Gas & Electric Representative (2) 5.3.3
a. Nembership (1) Vice President (Nuclear Engineering & Operations)

(2) Vice President (Advanced Engineering)

(3) Vice President (Engineering and Construction)

(4) Vice President (San Diego Gas & Electric Company)

Revised Figure 5.2-1 is attached.

The balance of Technical Specification 5.0 would remain unchanged.

SAFETY AND ENVIRONMENTAL FINDING The proposed change to the Technical Specifications described herein are administrative in nature and will have no detrimental impact on the environment, nor do they involve an unreviewed safety question as defined in 10CFR50.59.

FIGURE 6.2.1.1.

OFFSITE ORGANIZATION CHAIRMAN OF THE BOARD PRESIDENT SENIOR VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT NUCLEAR (FUEL SUPPLY)

(NUCLEAR ENGINEERING (POWER SUPPLY)

(SYSTEM (ENGINEERING &

(ADVANCED CONTROL AND OPERATIONS)

DEVELOPMENT)

CONSTRUCTION)

ENGINEERING)

BOARD I

NUCLEAR AUDIT AND REVIEW COMMITTEE MANAGER OF MANAGER OF MANAGER OF I

NUCLEAR ENGINEERING &

ENVIRONMENTAL ENGINEERING LICENSING AFFAIRS DESIGN

MANAGER, MANAGER, NUCLEAR QUALITY GENERATION ASSURANCE I I CHIEF F PROJECT MANAGER CHIEF OF NUCLEAR SAN ONOFRE UNIT 1 DEVELOPMENT AND ENGINEERING RETROFIT PROJECTS ENVIRONMENTAL ENGINEERING I

HEADQUARTERS STAFF STATION PLANT

.ON-SITE STAFF MANAGER REVIEW COMMITTEE

SENIOR VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT POWER SUPPLY DEPARTMENT NUCLEAR ENGINEERING & OPERATIONS GENERAL CORPORATE FIRE SUPERINTENDENT PREVENTION COMMITTEE I

ADMINISTRATOR OF POWER SUPPLY DEPARTMENT SERVICES FIRE CONTROL AND MANAGER, NUCLEAR CONSERVATION GENERATION REPRESENTATIVE HEADQUARTERS mmmm immmmmmmmmmm mmmmmmm-mmmm mmmmmmmmmmmm FIELD PLANT MANAGER I

FIRE EQUIPMENT SUPERINTENDENT INSPECTORS SAN ONOFRE UNIT 1 STATION SUPERVISOR STATION FIRE BRIGADE PLANT MAINTENANCE FIRE COMMITTEE Figure 6.2.3.1 FIRE PROTECTION STAFF AND LINE ORGANIZATIONS

CHAIRMAN OF THE BOARD PRESIDENT SENIOR VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT NUCLEAR (FUEL SUPPLY)

(NUCLEAR ENGINEERING (POWER SUPPLY)

(SYSTEM (ENGINEERING &

(ADVANCED CONTROL AND OPERATIONS)

DEVELOPMENT)

CONSTRUCTION)

ENGINEERING)

BOARD I

NUCLEAR AUDIT AND REVIEW COMMITTEE MANAGER OF MANAGER OF MANAGER OF NUCLEAR ENGINEERING &

ENVIRONMENTAL ENGINEERING LICENSING AFFAIRS DESIGN

MANAGER, MANAGER, NUCLEAR QUALITY GENERATION ASSURANCE I

I CHIEF F

PROJECT MANAGER CHIEF OF NUCLEAR SAN ONOFRE UNIT 1 DEVELOPMENT AND ENGINEERING RETROFIT PROJECTS ENVIRONMENTAL ENGINEERING I

I HEADQUARTERS STAFF mmmmmmmmmmmm mmmmmmm m

m m

m m

m m

-m m

m m

m m

m ae m

STATION PLANT ON-SITE STAFF MANAGER REVIEW COMMITTEE

IGUFZ

§OUtSE"R CALIFOPIp. EDIS" C

D-rej