Advises That Schedule for Implementing Procedures Re Crane Operator Training,Per NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, Will Be Completed by 820531
ML13317B087
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 04/09/1982
From: Baskin K
Southern California Edison Co
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TAC-08082, TAC-8082, TASK-A-36, TASK-OR NUDOCS 8204200173
Download: ML13317B087 (1)


Text

Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 K. P. BASKIN TELEPHONE MANAGER OF NUCLEAR ENGINEERING, (213) 572-1401 SAFETY, AND LICENSING April 9, 1982 Director, Office of Nuclear Reactor Regulation Attention:

D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Subject:

Docket No. 50-206 NUREG-0612, Control of Heavy Loads at Nuclear F1 San Onofre Nuclear Generating Station Unit 1

Reference:

Letter, K. P. Baskin, SCE, to D. M. Crutchfield, NRC, NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, February 22, 1982 The referenced letter indicated that procedures for turbine gantry crane checkout and operation, reactor service crane operation, and operator qualification for polar, turbine gantry, and cask handling cranes would be completed by April 2, 1982.

We also indicated that we would advise you of an implementation schedule by April 9, 1982.

The purpose of this correspondence is to inform you of our proposed implementation schedule for the following procedures:

S01-I-1.79, "Operator Qualification for Reactor Service and Turbine Gantry Cranes" S01-I-7.27, "Turbine Gantry Crane Checkout and Operation" S01-1-7.28, "Reactor Service Crane Checkout and Operation" We have completed drafts of these procedures and are in the process of inserting them into the San Onofre Unit 1 procedure set.

Based on the effort necessary to implement these procedures, it is anticipated that the necessary crane operator training can be completed and the procedures implemented by May 31, 1982.

If you have any questions, please let me know.

£ Very truly yours, 8204200173 820409 PDR ADOCK 05000206 P