TAC:08082
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
Questions Answers Results
Other: ML13310A818, ML13310B335, ML13311A377, ML13317A119, ML13317A218, ML13317A221, ML13317A254, ML13317A356, ML13317A482, ML13317A859, ML13317A874, ML13317B051, ML13317B087, ML13324A704 | |
| From | |
MONTHYEARML13317A8591982-02-0505 February 1982
[table view]Provides Status Re Util Evaluation of Heavy Loads,In Response to NRC & Generic Ltr 81-07.General & Specific Info Will Be Provided by 820401 & 0501 Respectively.Implementation Schedules to Be Established ML13317A8741982-02-22022 February 1982 Discusses Status of Actions in Response to NUREG-0612, Control of Heavy Loads.Load Handling Restrictions Implemented.Safe Load Path Markings Will Be Implemented Approx 820301.Next General Info Rept by 820401 ML13317B0511982-04-0101 April 1982 Forwards 6-month General Info Rept Addressing Section 2.1 Info in NUREG-0612 Re Control of Heavy Loads ML13317B0871982-04-0909 April 1982 Advises That Schedule for Implementing Procedures Re Crane Operator Training,Per NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, Will Be Completed by 820531 ML13317A1191982-05-10010 May 1982 Advises That 9-month Rept on NUREG-0612 Re Control of Heavy Loads Will Be Submitted by 820618.Reactor Svc Crane & Turbine Gantry Crane Are Equipped W/Two Main Hoist Brakes ML13317A2211982-06-30030 June 1982 Control of Heavy Loads for San Onofre Nuclear Generating Station Unit 1, Final Rept ML13317A2181982-07-0606 July 1982 Forwards Control of Heavy Loads for San Onofre Nuclear Generating Station Unit 1, Final Rept.Corrective Actions Planned Based on Results of Design Evaluation & Analysis Listed ML13317A2541982-07-16016 July 1982 Control of Heavy Loads, Technical Evaluation Rept ML13317A3561982-10-0505 October 1982 Informs That Crane Operating,Maint & Insp Procedures Implemented on 821001 Per ,Insuring Compliance w/NUREG-0612.Cost & Implementation Schedule of Items 1-3 to Be Completed by 821215 Due to Vendor Delays ML13317A3701982-10-21021 October 1982 Forwards Supplemental Info Rept Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Rept Contains Commitments Requiring Changes to Crane Operating Procedures to Be Implemented by 830115 ML13317A3731982-10-31031 October 1982 Control of Heavy Loads,San Onofre Nuclear Generating Station Unit 1, Supplemental Info Rept ML13317A4821983-01-19019 January 1983 Submits Info Re Status of Three Outstanding Action Items on Compliance w/NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Info Addresses Crane Trolley Stops,Lift Rigs & Mod to North Turbine Deck Structure ML13310B2531983-04-0505 April 1983 Control of Heavy Loads (C-10),San Onofre Nuclear Generating Station,Unit 1, Draft Technical Evaluation Rept ML13310A8181983-07-0606 July 1983 Discusses Evaluation of Lift Rigs for Reactor Coolant Pump Motors & Equipment Hatches Per NUREG-0612.Evaluation Complete.Rigs Will Be Constructed by Westinghouse ML13310B3351984-04-11011 April 1984 Requests Addl Time to Submit Responses to Requested Info, Identified in Revised Technical Evaluation Rept, Control of Heavy Loads - Phase I. Specific Date Will Be Provided After Return to Svc Date ML13311A3771985-01-31031 January 1985 Control of Heavy Loads (C-10) San Onofre Nuclear Generating Station Unit 1, Technical Evaluation Rept ML13324A7041985-08-29029 August 1985 Provides Addl Info Re Open Issues Concerning Control of Heavy Loads.Safe Load Paths & Load Zones Chosen to Avoid Reactor Vessel & Minimize Movement Over RHR Sys 1982-06-30 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:08082&oldid=5222681"