ML13310B335

From kanterella
Jump to navigation Jump to search

Requests Addl Time to Submit Responses to Requested Info, Identified in Revised Technical Evaluation Rept, Control of Heavy Loads - Phase I. Specific Date Will Be Provided After Return to Svc Date
ML13310B335
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 04/11/1984
From: Rainsberry J
Southern California Edison Co
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TAC-08082 NUDOCS 8404170368
Download: ML13310B335 (1)


Text

SW 0

Southern California Edison Company P.0 BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 April 11, 1984 Director, Office of Nuclear Reactor Regulation Attention:

D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Subject:

Docket No. 50-206 Control of Heavy Loads San Onofre Nuclear Generating Station Unit 1

Reference:

Letter, D. M. Crutchfield, NRC, to K. P. Baskin, SCE, Control of Heavy Loads Phase I, February 22, 1984 The referenced letter provided a revised Technical Evaluation Report (TER) for San Onofre Unit 1 and indicated that you had reviewed our October 21, 1982 response to your initial TER transmitted to us on August 3, 1982. The revised TER identified three areas for which additional information is required to complete the evaluation. Our response to address these three areas was requested within 45 days of receipt of the referenced letter.

Based upon our review of the requested information and considering the current status of San Onofre Unit 1, we have determined that additional time is required. As you know, we are presently involved in extensive efforts to return San Onofre Unit 1 to service in the last quarter of 1984 and the persons responsible for the preparation of the requested information are committed to these efforts.

Consequently, we intend to provide the requested information after the San Onofre Unit 1 return to service date. We will provide you with a more specific schedule at that time.

If you have any questions regarding the above discussed schedule, please let me know.

Very truly yours, L. Rainsberry Supervising Engineer San Onofre Unit 1 Licensing 8404170366 840411 PDR ADOCK 05000206 K~P PDR___

I'D