MONTHYEARML13317A8591982-02-0505 February 1982 Provides Status Re Util Evaluation of Heavy Loads,In Response to NRC & Generic Ltr 81-07.General & Specific Info Will Be Provided by 820401 & 0501 Respectively.Implementation Schedules to Be Established Project stage: Other ML13317A8741982-02-22022 February 1982 Discusses Status of Actions in Response to NUREG-0612, Control of Heavy Loads.Load Handling Restrictions Implemented.Safe Load Path Markings Will Be Implemented Approx 820301.Next General Info Rept by 820401 Project stage: Other ML13317B0511982-04-0101 April 1982 Forwards 6-month General Info Rept Addressing Section 2.1 Info in NUREG-0612 Re Control of Heavy Loads Project stage: Other ML13317B0871982-04-0909 April 1982 Advises That Schedule for Implementing Procedures Re Crane Operator Training,Per NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, Will Be Completed by 820531 Project stage: Other ML13317A1191982-05-10010 May 1982 Advises That 9-month Rept on NUREG-0612 Re Control of Heavy Loads Will Be Submitted by 820618.Reactor Svc Crane & Turbine Gantry Crane Are Equipped W/Two Main Hoist Brakes Project stage: Other ML13317A2211982-06-30030 June 1982 Control of Heavy Loads for San Onofre Nuclear Generating Station Unit 1, Final Rept Project stage: Other ML13317A2181982-07-0606 July 1982 Forwards Control of Heavy Loads for San Onofre Nuclear Generating Station Unit 1, Final Rept.Corrective Actions Planned Based on Results of Design Evaluation & Analysis Listed Project stage: Other ML13317A2541982-07-16016 July 1982 Control of Heavy Loads, Technical Evaluation Rept Project stage: Other ML13317A3561982-10-0505 October 1982 Informs That Crane Operating,Maint & Insp Procedures Implemented on 821001 Per ,Insuring Compliance w/NUREG-0612.Cost & Implementation Schedule of Items 1-3 to Be Completed by 821215 Due to Vendor Delays Project stage: Other ML13317A3701982-10-21021 October 1982 Forwards Supplemental Info Rept Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Rept Contains Commitments Requiring Changes to Crane Operating Procedures to Be Implemented by 830115 Project stage: Supplement ML13317A3731982-10-31031 October 1982 Control of Heavy Loads,San Onofre Nuclear Generating Station Unit 1, Supplemental Info Rept Project stage: Supplement ML13317A4821983-01-19019 January 1983 Submits Info Re Status of Three Outstanding Action Items on Compliance w/NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Info Addresses Crane Trolley Stops,Lift Rigs & Mod to North Turbine Deck Structure Project stage: Other ML13310B2531983-04-0505 April 1983 Control of Heavy Loads (C-10),San Onofre Nuclear Generating Station,Unit 1, Draft Technical Evaluation Rept Project stage: Draft Other ML13310A8181983-07-0606 July 1983 Discusses Evaluation of Lift Rigs for Reactor Coolant Pump Motors & Equipment Hatches Per NUREG-0612.Evaluation Complete.Rigs Will Be Constructed by Westinghouse Project stage: Other ML13310B3351984-04-11011 April 1984 Requests Addl Time to Submit Responses to Requested Info, Identified in Revised Technical Evaluation Rept, Control of Heavy Loads - Phase I. Specific Date Will Be Provided After Return to Svc Date Project stage: Other ML13311A3771985-01-31031 January 1985 Control of Heavy Loads (C-10) San Onofre Nuclear Generating Station Unit 1, Technical Evaluation Rept Project stage: Other ML13324A7041985-08-29029 August 1985 Provides Addl Info Re Open Issues Concerning Control of Heavy Loads.Safe Load Paths & Load Zones Chosen to Avoid Reactor Vessel & Minimize Movement Over RHR Sys Project stage: Other 1982-06-30
[Table View] |
Text
Southern California Edison Company P. 0.
BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 K. P. BASKIN TELEPHONE MANAGER OF NUCLEAR ENGINEERING, (213) 572-1401 SAFETY, AND LICENSING July 6, 1983 Director, Office of Nuclear Reactor Regulation Attention: D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Subject:
Docket No. 50-206 NUREG-0612, Control of Heavy Loads at.Nuclear Power Plants San Onofre Nuclear Generating Station Unit I
References:
- 1. Letter, K. P. Baskin, SCE, to D. M. Crutchfield, NRC, NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, January 19, 1983
- 2. Letter, R. Dietch, SCE, to H. R. Denton, NRC, San Onofre Nuclear Generating Station, Unit 1, June 10, 1983 The referenced letter indicated to you that we will complete our bid evaluation of lift rigs for Lhe reactor coolant pump motors and equipment hatches by September 1, 1983. This evaluation is complete and the lift rigs
-- will -be -constructed -by Westinghouse Electric Corporatibhn.
The completion schedule for these lift rigs andthe modification to the north turbine deck extension are to be established in the resolution of the proposed plan in Reference 2.
If you have any questions, please let me know.
Very truly yours,